2024-08
Trabue Road over Scioto River (FRA-CR27-10.77) & Trabue Road over Scioto Pointe Drive (FRA-CR27-10.89) PID 105759 -
DBE Goal: 10%
Upgrading 0.285 miles of Trabue Road by rehabilitating and widening of bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the decks with composite reinforced concrete decks, new approach slabs, semi-integral abutment conversion, parapets, sidewalks, shared-use path, and resurfacing of Trabue Road.
Engineer's Estimate: $12,094,232.06
| 04/30/2024 02:00 PM UTC |
2024-10
Franklin County Township Resurfacing Program DBE Goal 8%
Upgrading various sections of Franklin County Township roadways, detailed within; with asphalt resurfacing and aggregate berm material.
Engineer's Estimate $6,527,880.15
| 05/02/2024 06:00 PM UTC |
Number | Deadline |
---|---|
2020-05
Ridpath Rd 0.69 over Stanford Smith Ditch (JAC-TR270-0.69) - This project consists of upgrading 0.05 miles of Ridpath Road by replacing the existing bridge over Stanford Smith Ditch, providing new drainage structures, and minimal roadway approach improvements.
ENGINEER ESTIMATE - $237,810
| 04/28/2020 06:00 PM UTC |
2019-18
Dublin-Granville Road over Rocky Fork Creek (FRA-CR546-12.90)
Replacement and widening of the existing bridge over Rocky Fork Creek including the addition of a shared use path over the bridge and approximately 270 feet of shared use path along the south side of Dublin-Granville Road.
ENG ESTIMATE - $1,196,999.83
| 04/07/2020 06:00 PM UTC |
2019-15
Alum Creek Drive & Rohr Road Improvements: This project consists of the addition of right and left turn lanes at the intersection of Alum Creek Drive and Rohr Road, the addition of a second eastbound lane on Rohr Road from Alum Creek Drive to Port Road, a new signal installation at Alum Creek Drive at Rohr Road , pavement resurfacing, storm sewer and necessary traffic control devices.
ENGINEER'S ESTIMATE: $3,358,178.56
| 03/31/2020 02:00 PM UTC |
2020-01
2020 - 2021 Guardrail Repair and Upgrade Program
ENG ESTIMATE $342,650.75
| 03/10/2020 02:00 PM UTC |
2019-21
Hayden Run Central Ohio Greenways Trail Improvements -
This project consists of constructing a missing Shared Use Path segment of the Hayden Run Central Ohio Greenways Trail between the City of Hilliard Corp Line and the City of Columbus Corp Line. The proposed limits extend under I-270. This project also includes pavement resurfacing, Hayden Run Road structure rehabilitation, and guardrail replacement.
ENG ESTIMATE = $821,960.90
| 03/10/2020 02:00 PM UTC |
2020-02
Installation of traffic signal interconnect and communications equipment required to integrate the traffic signals along Alum Creek Drive onto the regional Columbus Traffic Signal System for remote signal coordination and monitoring and to establish a connected vehicle environment for the deployment and testing of vehicle to infrastructure communication technologies.
ADD ENG ESTIMATE: $1,361,675
| 02/25/2020 07:00 PM UTC |
2019-19
Madison Township Fire Station 182 Improvement: The reconstruction of a parking lot and access road for Fire Station #182 located at 6600 Gender Road. The work will include removing existing pavement and replacing with concrete pavement. Additionally, a closed storm sewer system will be constructed as part of the improvement.
| 02/04/2020 03:00 PM UTC |
2019-13
Havenwood Improvement: The project includes the rehabilitation of 0.52 miles of Westport Road, 0.20 miles of Nationwide Boulevard, and 0.16 miles of Lincoln Park Court with chemically stabilized subgrade and asphalt. The project also includes ADA compliant sidewalk replacements, curbs and driveway replacements along 0.07 miles of Industrial Mile Road as well as the work areas noted above. The project is located in Franklin and Prairie Townships, Franklin County, Ohio.
ENG ESTIMATE $2,106,691
| 01/28/2020 03:00 PM UTC |
2019-22
Precast Culvert Sale 2019 (Multiple Bridges):
This bid consists of the fabrication and delivery of 112 linear feet of 10’x10’ precast concrete boxes and 228 linear feet of 12’x6’ precast concrete boxes. This bid also consists of the fabrication and delivery of precast wingwalls and headwalls and the necessary materials to properly install the prefabricated systems for one of the culverts.
| 01/14/2020 07:00 PM UTC |
2019-24
Hayden Run Central Ohio Greenways Trail Improvements (Prefab Material Purchase).
This bid only consists of the fabrication and delivery of a Prefabricated Steel Truss and Components along with the necessary materials to properly install the deliverables.
ENG ESTIMATE - $105,000