General Info

Business Logo

Franklin County Engineer's Office

970 Dublin Rd, Columbus , OH 43215
(614) 525-3030

Adam W. Fowler, P.E., P.S.
    Franklin County Engineer

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2021-07
Toy Road, Swisher Road, Saltzgaber Road and Groveport Road Improvement Part 1 & 2 Groveport Road and Saltzgaber Road Improvements Part 1: The project involves a roadway widening plan for Groveport Road for approximately 0.34 miles and Saltzgaber Road for approximately 0.48 miles. The typical section for Saltzgaber Road will be 3 lanes with a two-way left turn lane along the majority of the alignment. Groveport Road widening includes an eastbound left and eastbound right turn lane along with a westbound left turn lane. The project will also improve drainage. Improvements of Toy Road, Swisher Road & Saltzgaber Road Part 2: Improve Toy Road with dual cul-de-sac east of the intersection of Centerpoint Parkway. Resurface the remaining Toy Road and Swisher Road and part of Saltzgaber Road with 1.5” asphalt overlay. Improve drainage and install traffic control items. ADD ENG ESTIMATE $2,739,346.17
04/06/2021 02:00 PM UTC
2020-16
Olentangy River Road Storm Sewer Improvement - This project consists of the installation of a storm sewer trunk that will alleviate drainage issues along the west side of Olentangy River Road, south of Crestway Drive and north of the existing culvert at Turkey Run. ENG ESTIMATE = $269,430.20
03/09/2021 07:00 PM UTC
2020-07
Refugee Rd 5.99 over Big Walnut Creek (MAD-C14-5.99) - Rehabilitation of the Refugee Rd over Big Walnut Creek Bridge by providing a new concrete sidewalk, new concrete barriers, and new exterior beams. Construction of 0.40 miles of shared use path and walk on a new alignment, including associated grading, drainage, and drive approaches. ENG ESTIMATE = $2,785,652.79 EBE Goal: 12%
01/20/2021 07:00 PM UTC
2020-12
Clark State Road and Longstreth Park Place Drainage Improvements Upgrading the storm sewer system within Longstreth Subdivision. $528,141.00
09/15/2020 06:00 PM UTC
2020-13
Murnan Road Drainage Improvement Drainage Improvements along Murnan Road from the intersection with Kuhlwein Road to approximately 1,900 feet south of the intersection. Improvements include minor grading to enhance roadside ditches to allow stormwater to drain to the approximately 5,200 linear feet of new storm sewer. $1,184,655.00
08/18/2020 06:30 PM UTC
2020-10
2020-21 General Drainage Maintenance Assist the Franklin County Drainage Engineer and the Franklin County Engineer with work to excavate, repair, replace and upgrade various on road and off road stormwater drainage systems in Franklin County. ENG ESTIMATE: $1,199,999.00
07/23/2020 06:00 PM UTC
2020-11
REBID of Smothers Road at Harlem Road BMP Redesign. Reconstruction of the existing water quality and detention basin that provides storm-water management for the intersection of Smothers Road and Harlem Road. ENG ESTIMATE $128,438.98
07/14/2020 02:00 PM UTC
2020-09
Upgrading various sections of Franklin County township roadways with asphalt resurfacing and aggregate berm material. ENG ESTIMATE $2,487,943.25
07/07/2020 06:30 PM UTC
2020-08
Mann Rd 0.50 over Tributary of Rocky Fork Creek (JEF-TR107-0.50) - Replacement of the existing concrete slab culvert with a new concrete box culvert and the other incidentals necessary to complete the work. ENG ESTIMATE - $542,650.62
06/30/2020 06:00 PM UTC
2020-04
Smothers at Harlem BMP Improvement Reconstruction of the existing water quality and detention basin that provides storm-water management for the intersection of Smothers Road and Harlem Road ENG ESTIMATE $112,827.48
06/23/2020 02:00 PM UTC
71 - 80 of 109 Solicitations
1 2 3 4 5 6 8 10 11