General Info

Business Logo

Franklin County Engineer's Office

970 Dublin Rd, Columbus , OH 43215
(614) 525-3030

Adam W. Fowler, P.E., P.S.
    Franklin County Engineer

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2021-21
Commerce Street, Vause Road, Canal Road Improvements: Improve Vause Road by installing a truck turnaround between the Norfolk Southern Railroad bridge and the CSX Railroad bridge. Improve the intersection of Vause Road and Canal Road with a widened pavement truck turnaround. EBE Goal 8% ENGINEER'S ESTIMATE: $453,442.00
02/08/2022 03:30 PM UTC
2021-24
Lockbourne Road & London-Groveport Road (SR 317) Roundabout: Upgrading 0.17 miles of London-Groveport Road (SR 317) and 0.17 miles of Lockbourne Road by constructing a single-lane roundabout. The project will improve drainage, pavement, signing, pavement markings and street lighting at the intersection. ENGINEER'S ESTIMATE: $2,050,518.00
02/08/2022 03:00 PM UTC
2021-13
Agler Rd 1.52 over Alum Creek (FRA-CR16-1.52), PID 105741 - DBE Goal: 10% Improvement of 1,364 feet of Agler Road by rehabilitating an existing bridge over Alum Creek and reducing lane widths to construct a new 10 foot shared use path along the south side of the roadway. Construct a new shared use path connection between Agler Road and the Alum Creek Multi-Use Trail (Ohio to Erie Trail). ENG ESTIMATE = $5,429,368.46
01/06/2022 07:00 PM UTC
2021-16 B
Morse Road at Babbitt Road Roundabout Improvement: FRA-CR 17-11.80 PID 109494 DBE Goal 8% This project consists of the construction of a single lane modern roundabout at the intersection of Morse Road and Babbitt Road. The project will replace the existing bridge over Swisher County Ditch with a box culvert, enclosing Swisher County Ditch within the project limits. The project will also provide a new enclosed storm sewer system, new pedestrian facilities, new 16" waterline and new street lighting. ENG ESTIMATE: $4,042,652.00
01/04/2022 03:00 PM UTC
2021-16
Morse Road at Babbitt Road Roundabout Improvement: FRA-CR 17-11.80 PID 109494 DBE Goal 8% This project consists of the construction of a single lane modern roundabout at the intersection of Morse Road and Babbitt Road. The project will replace the existing bridge over Swisher County Ditch with a box culvert, enclosing Swisher County Ditch within the project limits. The project will also provide a new enclosed storm sewer system, new pedestrian facilities, new 16" waterline and new street lighting. ENG ESTIMATE: $4,105,826.26
11/30/2021 03:00 PM UTC
2021-11
This project will provide potable water to the Franklin County Engineer’s Office East Maintenance Facility at 4801 Hendron Road, Groveport, Ohio. This project will replace an existing well that currently services the site.
09/07/2021 06:00 PM UTC
FCTID-BID
The following is a notification of a project bidding on the Franklin County Transportation Improvement District Bid Express site. Please see attachment below and add notifications for upcoming FCTID projects. The project currently bidding on FCTID Bid Express site is: 2021-23 50 E. Mound Street Surface Parking Lot Engineer's Estimate: $691,457.85
08/05/2021 06:30 PM UTC
2021-20
Olentangy River Rd 11.40 over Carhart Ditch (SHA-CR9-11.40) & Olentangy River Rd 11.62 over Linworth Run (SHA-CR9-11.62) - At Carhart Ditch, upgrading 450 feet of Olentangy River Road buy providing the replacement of the existing bridge over Carhart Ditch (SHA-CR9-11.40), north of S.R. 161. At Linworth Run, replacement of the existing 3-sided culvert carrying Linworth Run under Olentangy River Road (SHA-CR9-11.62) just north of Whieldon Lane. The project includes additional roadway resurfacing quantities on either end of the project. ENG ESTIMATE = $1,409,587.72 EBE Goal = 8%
07/20/2021 06:00 PM UTC
2021-22
Combined Schleppi Road Drainage Improvement and Schleppi Road Bridge Replacement - Upgrading approximately 575' of storm sewer and replacing two drive culverts along Franklin County Road No. 191 (Schleppi Rd.) and the other incidentals necessary to complete the work. Replacement of the existing Schleppi 0.97 concrete slab culvert with a new concrete box culvert and the other incidentals necessary to complete the work. ENG ESTIMATE: $585,190.55 EBE Goal: 6%
07/13/2021 07:00 PM UTC
2021-04
Hoover Rd 2.04 over Tributary of Grant Run (JAC-CR262-2.04) - Complete replacement of the existing structure with a 12 ft. span by 6 ft. rise box culvert and approach roadway work. ENG ESTIMATE = $359,443.90 EBE Goal = 6%
07/13/2021 06:30 PM UTC
71 - 80 of 126 Solicitations
1 2 3 4 5 6 8 10 11 12 13