State of Oklahoma, Division of Capital Assets Management, Construction & Properties
1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112
See attachments for important information regarding submitting bids.
1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112
See attachments for important information regarding submitting bids.
Name * | Description | |
---|---|---|
BidExpressAccountRegistration.pdf (193 KB) | ||
BidExpressElectronicSignatures.pdf (124 KB) | ||
BidExpressHowToBid.pdf (201 KB) | ||
Bid Submittal Eff 3.16.2020.pdf (66 KB) | ||
Number | Deadline |
---|---|
CAP25-0417R1
This project consists of installing exterior components of Camp Gruber’s Cottages, some buildings have different requirements, Building (164, 166, 272, 274, 276, 273, 275, and 277). All work shall be performed by a contractor experienced in all aspects of work required by this scope. The Oklahoma Military Department (OMD) expects the renovated features of the facilities to need minimal maintenance or repair for a minimum of 25 years.
| 07/03/2025 07:00 PM UTC |
CAP25-0170
Demolition and removal of the vacant building located at 508 NW 2nd Street, Lawton OK 73501 to include all materials and equipment required to demolish existing structures, remove loose debris, cut/plug/abandon all existing utilities and grade, drain and sod the disturbed site.
| 07/17/2025 07:00 PM UTC |
Number | Deadline |
---|---|
CAP25-0156R1
CAP25-0156R1 - Hodge Building Electrical and Fire Suppression Upgrade - OKC, OK - OMES-OFM
| 05/27/2025 07:00 PM UTC |
CAP24-0143
The Project consists of Construction of new gun range facilities on the Copan Wildlife Management Area (WMA) to support hunter education, hunter skill improvement, and recreational shooting.
| 05/22/2025 07:00 PM UTC |
CAP26-0003
The purpose of this acquisition is to establish an annual contract to provide a complete service-oriented Water Treatment program for the HVAC systems at buildings managed by Office of Management Enterprises (OMES), Capitol Assets and Management (CAM), Department of Office of Facilities Management (OFM).
| 05/15/2025 07:00 PM UTC |
CAP24-0171
Work includes demolition and removal of the Dunbar School located at 1702 W N H Jones Avenue, Lawton OK 73501 to include all materials and equipment required to demolish existing structures, remove loose debris, cut/plug/abandon all existing utilities and grade, drain and sod the disturbed site.
| 05/15/2025 07:00 PM UTC |
CAP25-0057
The Project consists of rehabilitating two existing air handling units with a new direct drive fan wall system, chilled water cooling coil, and filter section. The two perimeter air distribution air handling units will be removed and replaced with new dedicated outside air units. The existing induction boxes will be abandoned in place and new
four-pipe fan coil units will be installed above ceilings on each floor to provide perimeter air conditioning. Existing variable air volume boxes will be replaced as an alternate. Work also includes new electrical connections for the all equipment and replacing small sections of ceiling tiles.
| 05/08/2025 07:00 PM UTC |
CAP25-0158
The scope of the project includes the removal various electrical panels
and cabinets throughout the building and replacement with new equipment like-for-like. This includes replacement of the main electrical gear and pathways between the OG&E transformer and the main electrical room.
| 05/06/2025 07:00 PM UTC |
CAP25-0146
The Project consists of the improvement of existing drainage conditions and public accessibility for the Oklahoma Governor's Mansion. This consists of demolition of existing storm sewer, pavement, sidewalk and curb and gutter to be replaced with new paving and storm sewer to an
existing public storm sewer system. Additionally, new sidewalk/ ADA improvements along public right of way shall be included.
| 05/06/2025 07:00 PM UTC |
CAP25-0370
Removal and disposal, offsite of the following: Building structures as stated above. This includes concrete walks, driveways, paved parking areas, walls, concrete floor, building foundations, and supporting walls to a uniform depth of 12 inches below lowest foundation elevation, roof, doors, windows, steel columns and beams.
| 05/06/2025 07:00 PM UTC |
CAP25-0058
Upgrades to M.C. Connors & Oliver-Hodge buildings including electrical, plumbing, and other systems.
| 05/01/2025 07:00 PM UTC |
CAP25-0059A
The scope of the project includes the removal of five existing air
handling units; three located in a penthouses on the roof, two located in the basement, and replacement with new units, like for like.
| 05/01/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.