State of Oklahoma, Division of Capital Assets Management, Construction & Properties
1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112
See attachments for important information regarding submitting bids.
1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112
See attachments for important information regarding submitting bids.
Name * | Description | |
---|---|---|
BidExpressAccountRegistration.pdf (193 KB) | ||
BidExpressElectronicSignatures.pdf (124 KB) | ||
BidExpressHowToBid.pdf (201 KB) | ||
Bid Submittal Eff 3.16.2020.pdf (66 KB) | ||
Number | Deadline |
---|---|
CAP25-0417R1
This project consists of installing exterior components of Camp Gruber’s Cottages, some buildings have different requirements, Building (164, 166, 272, 274, 276, 273, 275, and 277). All work shall be performed by a contractor experienced in all aspects of work required by this scope. The Oklahoma Military Department (OMD) expects the renovated features of the facilities to need minimal maintenance or repair for a minimum of 25 years.
| 07/03/2025 07:00 PM UTC |
CAP25-0170
Demolition and removal of the vacant building located at 508 NW 2nd Street, Lawton OK 73501 to include all materials and equipment required to demolish existing structures, remove loose debris, cut/plug/abandon all existing utilities and grade, drain and sod the disturbed site.
| 07/17/2025 07:00 PM UTC |
Number | Deadline |
---|---|
CAP24-0176
CAP24-0176 - Griffing Hall Elevator Replacement - Sulphur, OK 73086 - Oklahoma School for the Deaf - OKDRS
| 03/27/2025 07:00 PM UTC |
CAP24-0087
The Project consists of the base bid construction of an addition to the existing Career Center building, renovation of the existing building, associated site and utility work, and new perimeter fencing.
| 03/20/2025 07:00 PM UTC |
CAP25-0254
Pre-Bid meeting changed to 3/4/2025 at 1:00PM. Demo and replace the existing carpet in building C of the CLEET training center at 2401 Egypt Road, Ada, Oklahoma, 74820. The project will consist of both classrooms and corridors. The square footage of the carpet to be replaced will be 20269 SF. The vendor will provide all labor, carpet, adhesive, nosing, transitions, and cove base or other materials required to install and complete the project. After removing the existing carpet, the vendor will be responsible for scraping, cleaning, or preparing the slab for proper adhesion. The agency will be responsible for moving furniture.
| 03/13/2025 07:00 PM UTC |
CAP24-0059R2
The Project consists of refurbishment of the elevator in the Family TREE facility located at 5909 Classen Ct, Oklahoma City, OK 73118. These improvements will provide a code compliant elevator with reduced outages. They will also improve down time for any repairs as new components are readily available for replacement, while existing components are obsolete.
| 03/13/2025 07:00 PM UTC |
CAP25-0153
Replacement of existing electrical distribution equipment such as panelboards, load centers, and transformers with new equipment. Removing existing transformers from the electrical closets and installing new transformers in the basement mechanical room. Addition of mechanical units in the basement to provide required cooling for transformers.
| 02/27/2025 08:00 PM UTC |
CAP25-0150
The Project consists of the upgrade of the existing two (2) passenger elevators, including equipment
replacement, cab finish replacement, and miscellaneous code upgrades.
| 02/20/2025 08:00 PM UTC |
CAP25-0151
The Project consists of the upgrade of the existing four (4) passenger elevators and one (1) freight elevator,
including equipment replacement, cab finish replacement and miscellaneous code upgrades.
| 02/20/2025 08:00 PM UTC |
CAP25-0148
The Project consists of the replacement of existing curtainwall at the east entrance to the Denver Davison
Building with new curtainwall. Project includes the replacement of interior floor tile at the vestibule and a portion of the exterior to allow for waterproofing of the slab edge and improved drainage at the entrance.
| 02/20/2025 08:00 PM UTC |
CAP24-0120
CAP24-0120 - Spiro Mounds Museum Restroom Renovation - Spiro, OK - OHS
| 02/18/2025 08:00 PM UTC |
CAP25-0131
Update old pneumatic controls to new digital climate controls throughout the main complex and connected to the existing I Vu Pro climate control system.
| 01/30/2025 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.