General Info

Business Logo

State of Oklahoma, Division of Capital Assets Management, Construction & Properties

1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112

See attachments for important information regarding submitting bids. 

Standard Documents

Upcoming Solicitations

Number Deadline
CAP25-0362
CAP25-0362 - Water Treatment Plant Repair and Testing - Stringtown, OK - ODOC
11/11/2025 08:00 PM UTC
CAP25-0344
Upgrade existing elevator to comply with new codes including but not limited to, elevator equipment upgrades, elevator cab standard finish upgrade allowance, drywall/acoustical, glazing, finishes, fire protection, plumbing, mechanical and electrical.
11/18/2025 08:00 PM UTC
CAP25-0252
CAP25-0252 - Skylight Replacement - JDMC - Norman, OK - J.D. McCarty Center
11/18/2025 08:00 PM UTC
CAP26-0142
Work will consist of scraping/shaving topsoil from nearby ground directly inside manipulated developed units (work area) and depositing onto the dikes that surrounds the unit to build up elevation from erosion, fill in holes, and beaver runs.
11/20/2025 08:00 PM UTC
CAP26-0167
CAP26-0167 - Floor Restoration Project - OKC, OK - OHS
11/20/2025 08:00 PM UTC
CAP25-0428
CAP25-0428 - ATS Replacement - Clinton Veterans Center - Clinton, OK - ODVA
12/02/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
CAP25-0151
The Project consists of the upgrade of the existing four (4) passenger elevators and one (1) freight elevator, including equipment replacement, cab finish replacement and miscellaneous code upgrades.
02/20/2025 08:00 PM UTC
CAP25-0148
The Project consists of the replacement of existing curtainwall at the east entrance to the Denver Davison Building with new curtainwall. Project includes the replacement of interior floor tile at the vestibule and a portion of the exterior to allow for waterproofing of the slab edge and improved drainage at the entrance.
02/20/2025 08:00 PM UTC
CAP24-0120
CAP24-0120 - Spiro Mounds Museum Restroom Renovation - Spiro, OK - OHS
02/18/2025 08:00 PM UTC
CAP25-0131
Update old pneumatic controls to new digital climate controls throughout the main complex and connected to the existing I Vu Pro climate control system.
01/30/2025 08:00 PM UTC
CAP25-0147
Denver Davison Electrical Upgrade. Replacement of existing electrical distribution equipment, including but not limited to panelboards, load centers, transformers in violation with the National Electric Code.
01/30/2025 08:00 PM UTC
CAP25-0182 OMD HVAC Repair by Replacement Equipment Roof Top Unit
Repair by replacement HVAC Roof Top Units (RTUs) at various sites across the state.
01/28/2025 08:00 PM UTC
CAP24-0211
Renovating a 2,300 SF shell space to include three offices, an operations room and an IT room as described in the architectural drawings and specifications. Deployment of NTMC ITS elements for procurement, installation and integration/final acceptance per design and specifications guidance.
01/16/2025 08:00 PM UTC
CAP25-0136
Arcadia Parking Lot Improvements, Arcadia Education Building 3521 NE 33rd St. Edmond, OK 73013
01/14/2025 08:00 PM UTC
CAP24-0093
CAP24-0093 - HVAC Cooling Tower Upgrade - Lawton, OK - ODVA
01/09/2025 08:00 PM UTC
CAP25-0165
CAP25-0165 - Shooting Range Renovation - Optima WMA - Texas County, OK - ODWC
01/09/2025 08:00 PM UTC
61 - 70 of 596 Solicitations
1 2 3 4 5 7 9 10 11 59 60