State of Oklahoma, Division of Capital Assets Management, Construction & Properties
1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112
See attachments for important information regarding submitting bids.
1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112
See attachments for important information regarding submitting bids.
Name * | Description | |
---|---|---|
BidExpressAccountRegistration.pdf (193 KB) | ||
BidExpressElectronicSignatures.pdf (124 KB) | ||
BidExpressHowToBid.pdf (201 KB) | ||
Bid Submittal Eff 3.16.2020.pdf (66 KB) | ||
Number | Deadline |
---|---|
CAP24-0211
Renovating a 2,300 SF shell space to include three offices, an operations room and an IT room as described in the architectural drawings and specifications. Deployment of NTMC ITS elements for procurement, installation and integration/final acceptance per design and specifications guidance.
| 01/16/2025 08:00 PM UTC |
CAP25-0182 OMD HVAC Repair by Replacement Equipment Roof Top Unit
Repair by replacement HVAC Roof Top Units (RTUs) at various sites across the state.
| 01/23/2025 08:00 PM UTC |
CAP25-0131
Update old pneumatic controls to new digital climate controls throughout the main complex and connected to the existing I Vu Pro climate control system.
| 01/30/2025 08:00 PM UTC |
CAP25-0147
Denver Davison Electrical Upgrade. Replacement of existing electrical distribution equipment, including but not limited to panelboards, load centers, transformers in violation with the National Electric Code.
| 01/30/2025 08:00 PM UTC |
CAP25-0150
The Project consists of the upgrade of the existing two (2) passenger elevators, including equipment
replacement, cab finish replacement, and miscellaneous code upgrades.
| 02/13/2025 08:00 PM UTC |
CAP25-0151
The Project consists of the upgrade of the existing four (4) passenger elevators and one (1) freight elevator,
including equipment replacement, cab finish replacement and miscellaneous code upgrades.
| 02/13/2025 08:00 PM UTC |
CAP25-0148
The Project consists of the replacement of existing curtainwall at the east entrance to the Denver Davison
Building with new curtainwall. Project includes the replacement of interior floor tile at the vestibule and a portion of the exterior to allow for waterproofing of the slab edge and improved drainage at the entrance.
| 02/13/2025 08:00 PM UTC |
Number | Deadline |
---|---|
20337 OMES/CAP State of Oklahoma Paving Maintenance Contract-Area One
Area 1 per Map in Project Manual
| 06/16/2020 07:00 PM UTC |
20338 OMES/CAP State of Oklahoma Paving Maintenance Contract
Area 2 per Map in Project Manual
| 06/16/2020 07:00 PM UTC |
20339 OMES/CAP State of Oklahoma Paving Maintenance Contract
Area 3 per Map in Project Manual
| 06/16/2020 07:00 PM UTC |
20340 OMES/CAP State of Oklahoma Paving Maintenance Contract
Area 4 per Map in Project Manual
| 06/16/2020 07:00 PM UTC |
20341 OMES/CAP State of Oklahoma Paving Maintenance Contract
Area 5 per Map in Project Manual
| 06/16/2020 07:00 PM UTC |
20264 OTRD Main Entrance Monument Repair and Stabilization
20264 OTRD Main Entrance Monument Repair and Stabilization-Watonga, OK
| 06/11/2020 07:00 PM UTC |
20178 DOC HVAC Replacement of DE Office-OSP
McAlester, OK-Oklahoma State Penitentiary
| 06/11/2020 07:00 PM UTC |
20288 DRS Floor Installation Over Pool
Sulphur, Ok-Oklahoma School for the Deaf
| 06/11/2020 07:00 PM UTC |
20325 OCC North Deer Creek Site 1M Repairs
Pottowatamie County
| 06/11/2020 07:00 PM UTC |
20303 ODVA Increasing Fuel Storage Capacity for Emergency Generator
20303 ODVA Increasing Fuel Storage Capacity for Emergency Generator-Sulphur, OK
| 06/09/2020 07:00 PM UTC |