General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall.
03/04/2026 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OSU-240504-4 - Airport - Taxiway G, Rehabilitation - Phase 1
This project includes the removal and full-depth replacement of a section of The Ohio State University Airport Taxiway G. This also includes shoulder adjustment and pavement markings.
02/27/2026 07:00 PM UTC
OSU-250308 Mershon Aud Smoke Evac Replacement
Replace existing roof-mounted, automatic smoke vent over stage
02/26/2026 07:00 PM UTC
OSU-230116 Herrick Drive Rebuild
This project is the full depth pavement reconstruction of John Herrick Drive from Olentangy River Road to Woody Hayes Drive. This project includes the construction of a 10’ shared use path, upgraded lighting, pedestrian signal modifications, pavement markings, and landscaping.
02/13/2026 07:00 PM UTC
OSU-240082, James - Pharmacy Administration Renovation (C150, C150A through C150F, C150X) REBID
The project is the renovation of an existing open office into enclosed office in the administrative suite. The area of construction is approximately 1,500 square feet. The work consists of the removal of flooring and ceiling grid and tiles and the associated fire protection, mechanical, and electrical systems. The new work will consist of creating eight private offices and two general work areas. The new work will entail new partitions, doors and frames, ceilings, finishes in the new OSUWMC finish standards, and the associated mechanical, electrical, and fire protection systems
02/12/2026 07:00 PM UTC
OSU-255191, Ross Cardiac Cath Lab #5 Renovation/Replacement
Renovation and equipment replacement of Cath Lab #5.
02/05/2026 07:00 PM UTC
OSU-250015 Lima - Cook Hall Restroom Renovation
Description Interior renovations to group restrooms and lactation room in Cook Hall at The Ohio State University – Lima, including associated mechanical, electrical and plumbing improvements.
01/28/2026 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement -Extended Opening
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/19/2026 07:00 PM UTC
OSU-250136, Pressey Hall - Cage Washer Replacement
Installation of a new cage washer in the basement floor of the build-ing, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including installation of a pre-purchased condensate pump, a pre-purchased transformer, and a new compressor are included. Replace existing wall protection as required to accommodate new construction. All noisy work is to occur after normal operating hours.
01/15/2026 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/12/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
1 - 10 of 606 Solicitations
← Previous 1 3 4 5 6 7 8 9 60 61