The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement
Replacement of (2) air-cooled, low-temperature glycol chillers and
associated piping, electrical, structural, controls, and rigging work
at Ross Heart Hospital. Includes bid alternates for construction
phasing, control valves, AHU sensors, and access platforms.
| 11/18/2026 07:00 PM UTC |
|
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466
SF of the 4th floor including minor demolition, construction of new
interior partitions, new ceiling grid and tile, new doors, new
finishes, associated mechanical, electrical, plumbing and fire
protection work. An accessible restroom is being added to the
floor. A break area will also be added with associated plumbing,
casework and fixtures.
| 11/19/2026 07:00 PM UTC |
|
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing
imaging room at the James Cancer Center. The scope includes
new conduit pathways, power, floor CT rails, ceiling coordination,
process chilled water and other infrastructure to support the new equipment.
| 11/20/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-255480, JOC HHW and CHW Meter Replacement
This project will remove the existing insertion-style chilled water and heating water meters with in-line meters compliant with the OSU Building Design Standards. Pipe modifications will be required to accommodate straight-pipe requirements. Additionally, provide and wire OSU and ENGIE compliant gas meter integration to the existing gas meter. Provide all power, building automation, and wiring pathway requirements to support.
| 11/12/2026 07:00 PM UTC |
|
OSU-265465, MMP Rm 1080 and 1092 Renovations
This project renovates an existing Exam Room into a new Ultrasound Exam Room, renovates an existing Patient Toilet to be an Accessible Toilet room and renovates an existing room into a Patient Prep room.
| 10/29/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Project generally includes the removal and replacement of three underground storage tanks along with improvements to related equipment and infrastructure such as dispensers, concrete, canopies, etc…
| 10/22/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/19/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250047 Chiller Renewal FY25-26
Aronoff Lab – Replace existing 70 ton chiller in ground floor mechanical room and remote condensing unit on roof. Replace existing chiller pump and provide new redundant chiller pump. Replace existing refrigerant monitoring system.
Hagerty Hall – Replace two existing 220 Ton water cooled chillers located in the 5th floor penthouse. Replace refrigerant monitoring sensors and associated programming.
| 09/24/2026 06:00 PM UTC |
|
OSU-265500, East Hospital - Talbot Hall - Sleep Lab Support Space Renovation REBID
A renovation to add two restrooms and a staff kitchenette to the existing sleep lab suite. There are minor fire alarm additions to the existing caretaker rooms as well.
| 09/24/2026 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.