General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
08/13/2026 06:00 PM UTC
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM membrane. • Selective replacement of damaged, wet, or deteriorated insulations. • Replacement of edge metals. • Lightening protection replacement. • Fire alarm panel replacement. • Fire pump controller replacement (alternate)
08/19/2026 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
08/20/2026 06:00 PM UTC
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
08/20/2026 06:00 PM UTC
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
08/26/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
08/27/2026 06:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-240693 - PRB - Quantum Physics Lab Mechanical Upgrades
A 1,620 SF interior renovation of two research labs at the basement level of the Physics Research Building on the OSU Columbus Campus This project includes minor demolition, construction of new interior partitions, new finishes, and associated mechanical, electrical, plumbing, and fire protection work.
03/11/2025 06:00 PM UTC
OSU-190066 HVAC Replacements FY 2019 BP 2
Davis Heart and Lung Institute: Replacement of HVAC controls on Air Handling and HVAC Equipment with new DDC controls.
03/07/2025 06:00 PM UTC
OSU-230420 Pressey Rms 042T and 044T ADA Upgrades
The renovation of existing toilet rooms into compliant ADA toilet rooms. Renovation will include modification to architectural finishes, electrical, fire alarm, and plumbing systems. Included is the installation of one adult changing station and associated structural reinforcement.
02/27/2025 07:00 PM UTC
OSU-230107 BP 1 Electrical Renovation FY 23-24 REBID
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building including switchboards and panelboards.
02/20/2025 06:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience
This is a Rebid. New domestic water and fire backflow preventors in a new location. Backfeed existing systems. Replacement of existing galvanized steel cold water piping throughout the facility. Installation of new piping prior to demolition of active mains. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility.
02/10/2025 06:00 PM UTC
OSU-250003 - Ohio Stadium - Concession Stand Heaters
This project is for the installation of heaters within concession spaces that provide heat during winter events. The current scope of the project includes the installation of 34 electrically powered heaters.
12/30/2024 07:00 PM UTC
OSU-230431 1 Evans Hall Chiller Replacement REBID
Removal of existing chiller, providing new automatic propylene glycol feeder, providing 40% propylene glycol solution to fill system, installation of University purchased packaged chiller and transformer, provide concrete equipment pads, louvered fencing, site restoration, 200 gallon buffer tank, extending chilled water piping through roof to new chiller location, providing electric and controls from second floor mechanical room to University purchased chiller and transformer location outside on grade.
12/12/2024 07:00 PM UTC
OSU-230686 Veterinary Medical Center AHU-1 & AHU-2 Damper Replacement
Replacement of the existing OA, RA, and EA dampers and damper actuators serving AHU-1 and AHU-2. Addition of freeze protection pumps and associated piping, valves and accessories for the pre-heat coils in AHU-1 and AHU-2. Integration of the new freeze protection pumps into the existing BAS.
12/12/2024 06:00 PM UTC
Project OSU-230111 Road/Bridge Renewal FY23/24 RB 4
The planned scope of work includes rehabilitation of two bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs.
12/11/2024 07:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP 2
The project consists of the removal and replacement of the North McCracken tunnel roof, the complete removal of the North McCracken tunnel bypass, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct a new steam line within the North McCracken Tunnel. Under the Alternate 1 scope of work, a new water main will be constructed from the east end of the Oval to the west end and then up to the Cockins/Dulles loading dock area. The Alternate 2 scope of work provides alternate restoration methods to the North Oval Mall.
12/06/2024 06:00 PM UTC
91 - 100 of 631 Solicitations
1 2 6 7 8 10 12 13 14 63 64