The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-230830, 650 Ackerman - Employee Health and ID Processing
A (2) Two Phased Renovation of approximately 5,750 SF for
a new Employee Health and ID Processing Center located on
the west end of the First Floor of 650 Ackerman Road
Building. The improvements will include renovations and
expansion to the North Entry Lobby X100L (existing area
761 SF plus the expansion to the west into Suite 116 to add
an additional 260 SF) equating to a new 1,021 SF
Lobby/Waiting Area to accommodate Suite 100, the
remainder of Suite 116 will be utilized as a Staff Lounge
equating to 260 SF, an ADA Restroom of 80 SF and a
Janitor Closet of 28 SF. Suite 100 (area 4,235 SF) which will
accommodate the following services: a Reception Area, (4)
station counter for ID Processing, (5) Patient Exam Rooms,
(2) Patient Toilet Rooms, (2) Testing Areas, Nurse Station,
(5) Support Offices and 2 Storage Rooms (office supplies
and medications).
| 09/25/2024 06:00 PM UTC |
|
OSU-240191 - Younkin - Rm 150 Buckeye Resource Center
This project will renovate an approximately 2,014 sq. ft. space on the first floor of an existing mixed occupancy, 4-story building, and change use from from A-3 to B occupancy
| 09/25/2024 06:00 PM UTC |
|
OSU-230030 Mansfield - Various Campus Upgrades
This project includes roof replacements, roof repairs, building envelope joint sealant replacement, miscellaneous masonry repair and restoration, site work, and site lighting at multiple buildings located at The Ohio State University Mansfield Campus in Mansfield.
See additional information in Section 01 10 00 SUMMARY in the documents.
| 09/19/2024 06:00 PM UTC |
|
OSU-200183 Med Center Traffic Control Devices REBID 4
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
| 09/13/2024 06:00 PM UTC |
|
OSU-200183 Med Center Traffic Control Devices REBID
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
| 08/06/2024 06:00 PM UTC |
|
OSU-200183 Med Center Traffic Control Devices REBID
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
| 07/30/2024 06:00 PM UTC |
|
OSU 240138 Howlett Greenhouses Heating Piping
Replace all heating water and domestic cold water piping in the
Howlett Greenhouse trenches and a portion of the heating water
piping in the basement.
| 07/25/2024 06:00 PM UTC |
|
OSU-230431 1 Evans Hall Chiller Replacement
Removal of existing chiller, providing new automatic propylene glycol feeder, providing 40% propylene glycol solution to fill system, installation of University purchased packaged chiller and transformer, provide concrete equipment pads, louvered fencing, site restoration, 200 gallon buffer tank, extending chilled water piping through roof to new chiller location, providing electric and controls from second floor mechanical room to University purchased chiller and transformer location outside on grade.
| 07/24/2024 06:00 PM UTC |
|
Project OSU-230119 Journalism Bldg Rm 100 TV Studio
Interior renovation of room 100 for new Lantern Newsroom, private offices, and studios.
| 07/24/2024 06:00 PM UTC |
|
OSU-190275, Ag Engineering - HVAC Upgrades
Ag Engineering Bldg, OSU Main Campus:
The primary objective of this project is to replace and enhance the HVAC systems serving rooms 145, 156, 158, 164, and 166 at The Ohio State University Agricultural Engineering Building. The spaces are high bay instructional spaces that are currently without cooling. Cooling shall be added as part of this project utilizing the new campus chilled water brought to the building by ENGIE. The HVAC, electrical, plumbing and structural systems detailed within the plans shall be utilized.
| 06/27/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.