General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-180390-4, 12th Avenue Bus Connector
12the Avenue Bus Connector
03/22/2024 06:00 PM UTC
OSU-230304 Converse Hall - Bathroom/Shower Renovation
The renovation of OSU Converse Hall includes a multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette.
03/20/2024 06:00 PM UTC
OSU-230113 Campus Hardscape Improvements Phase 1 REBID
This project will improve campus hardscapes.
03/19/2024 06:00 PM UTC
OSU-230414 - Smith Lab - Forensic Lab 4097 Renovation
The Ohio State University is seeking a general contractor to execute the renovation and conversion of a classroom space into a forensic anthropology laboratory. The renovation will include the removal/ abatement of ACM materials, the augmentation of the space surfaces to allow for cleaning, installation of requisite fixed and mobile dry and wet equipment. Plumbing scope includes backflow prevention, coring concrete for floor drains, and necessary sanitary and supply distribution piping to the sink. Mechanically, the project will remove the space from building air, and tie the space into the existing DOAS air handler. A capture hood, ductwork to a new roof-mounted exhaust fan, as well as air balancing are also included in the project scope. Controls modifications are included. Electrical modifications to supply the equipment include the addition of a sub-panel, and distribution circuiting in the space. Additionally, electrical work in the penthouse to feed the exhaust fan VFD, and smoke and fire separation at the floor are included.
03/14/2024 06:00 PM UTC
OSU-230246, EEI - 4th Floor Otolaryngology Redesign
Tenant improvements of approximately 1,364sf on the fourth floor of the EEI Building, to accommodate a new Otolaryngology Research suite. The project will create a large staff workroom with conferencing capabilities, an Exam Room for a portable c-arm and conferencing capabilities, and minor upgrades to an Observation Room and Office.
03/13/2024 06:00 PM UTC
OSU-220591, East - Tower 6 Renovation
Renovation of the existing 6th floor of the patient tower: Approximately 10,450 square feet of patient rooms, corridors, nurses’ station and accessory functions. Patient rooms and corridors include primarily refresh, while the center core area will be reconfigured with associated mechanical, plumbing, electrical and life safety items.
03/12/2024 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I
The project consists of the removal and abandonment of tunnels on the University’s Midwest campus. The removal and abandonment of tunnels includes the removal of abandoned piping within the tunnels. New direct buried steam, communications, and medium-voltage electric lines will need to be installed as part of the project’s scope of work as well
03/07/2024 03:00 PM UTC
OSU-230107 Electrical Renovations FY23-24
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building and Cockins Hall Building including switchboards and panelboards, upgrade egress lighting systems, and provide circuit tracing and receptacle replacement.
03/04/2024 06:00 PM UTC
OSU-230111 Road/Bridge Renewal FY23-24
The planned scope of work includes rehabilitation three bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River, and Drake Pedestrian Bridge over Olentangy River Road and River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs
03/01/2024 07:00 PM UTC
OSU-230517 - Ohio Union - CCTV Upgrade
This project will complete a full replacement of the CCTV system at The Ohio State University Ohio Union Building.
02/21/2024 07:00 PM UTC
121 - 130 of 617 Solicitations
1 2 9 10 11 13 15 16 17 61 62