General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220458, Outpatient Care East - Xray Machines
Interior renovation for new x-ray equipment and casework within existing occupied outpatient care facility.
02/16/2024 07:00 PM UTC
OSU-230412, Schottenstein - Fire Alarm Completion
This project will upgrade the remaining fire alarm systems throughout the Schottenstein Center that has not been previously completed through other projects. The scope of the project will require a design to upgrade the system to be compliant with current codes and University design standards and will include new and upgrades/replacement of audio and visual devices, pathways and wiring throughout portions of the building. There will also be work involved with the existing fire suppression systems to replace or add components to coordinate with the new work.
01/25/2024 07:00 PM UTC
OSU-210269 Building Envelope Repairs
The scope of the project include repair of exterior glue-lam arched beams, replacement of exterior T1-11 wood panel siding, limited site work for asphalt walk removal, installation of 2.5” rigid insulation, coverboard and PVC (FiberTite) roof membrane as an overlay on an existing PVC roof membrane. The new insulation and PVC (FiberTite) roof membrane will be provided by OSU as they already own the material.
01/04/2024 07:00 PM UTC
OSU-220221 OSUE West Parking Lot REBID
Construction of a new parking lot to the west of Hughes Street on the western edge of the OSU East Hospital Complex.
12/19/2023 07:00 PM UTC
OSU-220456 12th Ave Dom Water & Sanitary
Replacement of waterline and sanitary sewer along west 12th Ave between High Street and College Street. All site work to be performed between May 20 and August 2, 2024.
12/05/2023 06:00 PM UTC
OSU-210264 Emergency Generator REBID
Enter Project Name and Location
11/20/2023 06:00 PM UTC
OSU-220520 Building Control Upgrades FY22
This project includes the replacement of the existing Johnson Controls Systems for Stillman Hall, Hagerty Hall, Hopkins Hall and Commissary with Delta Controls.
11/16/2023 07:00 PM UTC
OSU-210270 Plumbing Repairs - Veterinary Medical Center
Replacement of existing galvanized steel cold water piping. Installation of new piping prior to demolition of active mains. Removal of all obsolete piping. Replacement of aging valves in the hot and cold water system. Select underslab sanitary work to fix known issues. Replacement of flooring in areas of underslab work. Select above ceiling sanitary work to fix known issues/leaks. Abatement of select valves and flooring mastic. All work required for installation in an active and occupied veterinary hospital facility
11/16/2023 06:00 PM UTC
OSU-230458, East Tower - ADA Improvements REBID
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind. PHASE I: R219T, R221T, C104T and C141 Reception Desk. PHASE II: T033T, T034T, C200T and Vestibule.
11/15/2023 07:00 PM UTC
OSU-221027, Stillman - Corridor and 4th Floor Renovation (REBID)
Columbus Campus: The scope of work includes a single-phase renovation of the following Areas: Suite 400 2,329 SF, 4th Floor Corridor 1,308 SF, 3rd Floor Corridor 1,348 SF, 2nd Floor Corridor 1,513 SF and Area 425X 265 SF in Suite 425.
10/27/2023 06:00 PM UTC
131 - 140 of 617 Solicitations
1 2 10 11 12 14 16 17 18 61 62