General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
08/13/2026 06:00 PM UTC
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM membrane. • Selective replacement of damaged, wet, or deteriorated insulations. • Replacement of edge metals. • Lightening protection replacement. • Fire alarm panel replacement. • Fire pump controller replacement (alternate)
08/19/2026 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
08/20/2026 06:00 PM UTC
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
08/20/2026 06:00 PM UTC
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
08/26/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
08/27/2026 06:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-230499 Tunnel Rehabilitation Phase I
The project consists of the removal and abandonment of tunnels on the University’s Midwest campus. The removal and abandonment of tunnels includes the removal of abandoned piping within the tunnels. New direct buried steam, communications, and medium-voltage electric lines will need to be installed as part of the project’s scope of work as well
03/07/2024 03:00 PM UTC
OSU-230107 Electrical Renovations FY23-24
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building and Cockins Hall Building including switchboards and panelboards, upgrade egress lighting systems, and provide circuit tracing and receptacle replacement.
03/04/2024 06:00 PM UTC
OSU-230111 Road/Bridge Renewal FY23-24
The planned scope of work includes rehabilitation three bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River, and Drake Pedestrian Bridge over Olentangy River Road and River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs
03/01/2024 07:00 PM UTC
OSU-230517 - Ohio Union - CCTV Upgrade
This project will complete a full replacement of the CCTV system at The Ohio State University Ohio Union Building.
02/21/2024 07:00 PM UTC
OSU-220458, Outpatient Care East - Xray Machines
Interior renovation for new x-ray equipment and casework within existing occupied outpatient care facility.
02/16/2024 07:00 PM UTC
OSU-230412, Schottenstein - Fire Alarm Completion
This project will upgrade the remaining fire alarm systems throughout the Schottenstein Center that has not been previously completed through other projects. The scope of the project will require a design to upgrade the system to be compliant with current codes and University design standards and will include new and upgrades/replacement of audio and visual devices, pathways and wiring throughout portions of the building. There will also be work involved with the existing fire suppression systems to replace or add components to coordinate with the new work.
01/25/2024 07:00 PM UTC
OSU-210269 Building Envelope Repairs
The scope of the project include repair of exterior glue-lam arched beams, replacement of exterior T1-11 wood panel siding, limited site work for asphalt walk removal, installation of 2.5” rigid insulation, coverboard and PVC (FiberTite) roof membrane as an overlay on an existing PVC roof membrane. The new insulation and PVC (FiberTite) roof membrane will be provided by OSU as they already own the material.
01/04/2024 07:00 PM UTC
OSU-220221 OSUE West Parking Lot REBID
Construction of a new parking lot to the west of Hughes Street on the western edge of the OSU East Hospital Complex.
12/19/2023 07:00 PM UTC
OSU-220456 12th Ave Dom Water & Sanitary
Replacement of waterline and sanitary sewer along west 12th Ave between High Street and College Street. All site work to be performed between May 20 and August 2, 2024.
12/05/2023 06:00 PM UTC
OSU-210264 Emergency Generator REBID
Enter Project Name and Location
11/20/2023 06:00 PM UTC
141 - 150 of 631 Solicitations
1 2 11 12 13 15 17 18 19 63 64