General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230304 Converse Hall - Bathroom/Shower Renovation
Multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette. REBID
05/14/2024 06:00 PM UTC
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
05/22/2024 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-210473 National Pan-Hellenic Council (NPHC) Garden
Project will include the sitework for the construction of a garden area including earthwork and excavation, seat walls, plaza pavements, monument foundations, soils, and landscaping.
12/02/2021 07:00 PM UTC
OSU-210404, Newark - Hopewell Hall Improvements
OSU Newark: Project includes renovating a set of restrooms to make them meet ADA and update the finishes. Creation of a gender-neutral restroom will be added near the existing restroom bank.
12/02/2021 07:00 PM UTC
OSU-200666, Riffe - 6th Floor Labs Renovation
Interior renovations of existing labs 603, 609, 611, 637, 639, 643, and room 620. Renovations consist of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems associated with the renovation.
11/29/2021 07:00 PM UTC
OSU-210336, Evans Lab - 3021/3023 Grad Rooms
Renovate approximately 752 SF of the third floor of Evans Lab, at 88 West 18th Avenue, Columbus, OH. The project scope includes the following Rooms on the Third Floor: 3021 and 3023. The scope of the project is to convert existing lab spaces into office areas to accommodate graduate student workspaces. The renovation will upgrade finishes, plumbing for a new coffee station with sink, minor alterations to HVAC throughout the project area, provide new lighting, and additional power as required to accommodate workstations. Alternate G-1 to provide and install new flooring, remove existing window coverings and provide and install new roller shades. Alternate H-1 to remove existing sheet metal cover and provide and install new finned tube cover.
11/22/2021 07:00 PM UTC
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
11/17/2021 07:00 PM UTC
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
11/10/2021 07:00 PM UTC
OSU-210040, BSH - Thoracic Team Room
The project will consist of the construction of thoracic exam rooms, team rooms, general offices, CTPL lab space and associated fire protection, HVAC, plumbing and electrical work; located on the ground and second floors of the brain and spine hospital. Locations of work include the renovation of suite 214 for the new thoracic team room with a breakroom. Relocated phone triage in 049. Renovations of suite 234 to include (5) new exam rooms. Relocate the CPTL lab to the existing storage room in room 022 on the ground floor. Relocation of the CTO research staff offices to the existing conference room 087.
11/09/2021 07:00 PM UTC
OSU-210254, Ross - 1st Floor Restrooms
Renovation of the existing public restrooms located on the first floor of Ross Heart Hospital, 452 West 10the Avenue in Columbus, Ohio. The project scope includes Rooms H1209T Women’s Restroom (255 SF), H1210T Men’s Restroom (198 SF), as well as the entry space located before each restroom (36 SF each). The scope of the renovations will upgrade finishes in the existing spaces identified above. Alternate G-1 is to replace the existing drinking fountain with new, along with panel screens so that it complies with ADA.
11/01/2021 06:00 PM UTC
OSU-200234, Parks Hall - Suite 531 Renovation
OSU Main Campus: The Ohio State University, Parks Hall – Suite 531 Renovation. Work can be characterized best as “laboratory” renovations.
10/25/2021 06:00 PM UTC
OSU-200104
OSU HVAC Replacements FY 2020 This project will renovate and update building HVAC systems in buildings constructed after 1999.
10/20/2021 06:00 PM UTC
151 - 160 of 505 Solicitations
1 2 12 13 14 16 18 19 20 50 51