General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/16/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/04/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-200377 Waterman Dairy Improvements
Renovate existing tie stall barn to accommodate new college leased robotic milking, manure, and feeding equipment. Replace existing ventilation system with new system designed for milking operations
11/23/2022 07:00 PM UTC
OSU-200486 - Wooster Dairy Improvements
Improvements to multiple dairy facilities, this is Phase 1 of full implementation of the College's dairy consolidation & improvement plan for Wooster Project Webcam
11/23/2022 07:00 PM UTC
OSU-220002, MMP Pavilion - Sola MRI REBID
Removal of existing MRI Equipment and replacement within existing MRI suite. Associated work to include limited demolition and upgrades to associated structural and MEP systems within the suite and on the roof of the existing building. Work to be completed within an active patient environment.
11/18/2022 07:00 PM UTC
OSU-220480 Sullivant - AHU Duct Replacement
This project will replace the AHU ducts in Sullivant Hall, 1813 North High Street, Columbus, OH 43210
11/16/2022 05:00 PM UTC
OSU-220012 Wooster - National Greenhouse HVAC
This project will remove existing steam boiler, piping and heating equipment and provide new air distribution and heating equipment
11/11/2022 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP3 REBID
This project will replace deteriorating plumbing systems.
11/04/2022 05:00 PM UTC
OSU-210236, Parks - 3rd Floor Lab Renovations
The project includes work on the third floor of Parks Hall. Work within Parks Hall is primarily located within the third floor in the South end of the building. Work includes the selective demolition of existing elements to fully renovate 4,600 sf of existing third floor laboratory (Suites 319, 323 and Rooms 316 and 320) into a new laboratory space. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
11/03/2022 06:00 PM UTC
OSU-190865, Polaris - Cytogenetics Lab Expansion
Selective renovation for expansion of Cytogenetics Labs, including multiple lab areas and the addition of an additional emergency generator.
11/02/2022 06:00 PM UTC
OSU-210682 - Mansfield - Civic Plaza Improvements REBID
This project will create a new outdoor plaza area between Eisenhower Memorial Center and Conard Hall - approx. 4,000 SF
10/27/2022 06:00 PM UTC
OSU-210267 HVAC Repair and Replacements FY 21
This project will repair or replace HVAC systems across campus.
10/18/2022 06:00 PM UTC
161 - 170 of 581 Solicitations
1 2 13 14 15 17 19 20 21 58 59