General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230304 Converse Hall - Bathroom/Shower Renovation
Multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette. REBID
05/14/2024 06:00 PM UTC
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
05/22/2024 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-200666, Riffe-6th Floor Labs Renovation
OSU Main Campus - Interior renovations of existing labs 603, 609, 611, 637, 639, 643, and room 620. Renovations consist of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems associated with the renovation.
10/13/2021 06:00 PM UTC
OSU-210030, Outpatient Gahanna - Neurology Renovation
Renovation of approximately 2,470 square feet of tenant space of the Neurology Suite located at Outpatient Gahanna. The renovation is the conversion of an existing infusion space into exam rooms, team rooms, and support space.
10/12/2021 06:00 PM UTC
OSU-210360, Sisson Domestic Water Loop
The Project consists of the installation of an 8-inch domestic cold waterline in the Sisson Hall parking lot that cross connects with the 20-inch OSU domestic cold waterline on the east side of Olentangy River Road. The line will be installed via a jack and bore method and will be connected to the existing OSU 20-inch OSU main domestic cold water line using a tapping sleeve per OSU BDS Division 33.
09/30/2021 06:00 PM UTC
OSU-210137, Healthy New Albany Renovation
Interior Renovation and room re-configuration from Family Practice to Behavior Health (outpatient) Practice.
08/24/2021 06:00 PM UTC
OSU-190279, Wooster - GDAL Swine Finishing
Wooster Campus: Provide and install a new prefabricated, modular building structure, site preparation and all supporting utility infrastructure.
08/24/2021 06:00 PM UTC
OSU-190122 Infrastructure Improvements 1
Replace approximately two dozen failing and non-compliant curb ramps across campus.
08/12/2021 12:35 PM UTC
OSU-200538 Orton Hall Envelope Repairs
OSU-200358 This project includes building envelope repairs to Orton Hall, including isolated masonry and below-grade waterproofing repairs, as well as roofing. The roofing scope includes repairs to the main roof flashings and drainage elements, as well as replacement of the apse roof and leakage repairs at the northeast corner.
08/06/2021 06:00 PM UTC
OSU-210119, 600 & 610 Ackerman Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
08/04/2021 06:00 PM UTC
OSU-200102 Enhanced Maintenance FY 2020
This project includes the rehabilitation of building enclosure elements at Lazenby Hall, including isolated masonry and window repairs, and replacement of the clay tile roof. The roof replacement will include new flashings and drainage elements, and reuse the clay roof tiles.
07/29/2021 06:00 PM UTC
OSU-200539, Harding Hosp - Nursing Station Renovation
OSU Harding Hospital Nursing Station renovation. Work Includes renovation to existing Nurse Station on Level 2, Level 3 and Level 4.
07/15/2021 06:00 PM UTC
161 - 170 of 505 Solicitations
1 2 13 14 15 17 19 20 21 50 51