The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-230303, Bevis - Vestibular Lab Build Out
The project is the renovation of an existing research lab into a vestibular lab. The area of construction is approximately 1,180 square feet. The work consists of the demolition of a small section of corridor wall, flooring, ceiling, section of the slab on grade, and the associated fire protection, plumbing, mechanical, electrical systems. The new work will consist of creating a Work Area, MOOG Room (for testing equipment), and a walking path. For the MOOG room, it is required to remove a section of the slab on grade and repour a thicker slab on grade to resist the forces of the equipment. The new work will entail new partitions, doors and frames, casework, ceilings, finishes in the new OSUWMC finish standards, and the associated plumbing, mechanical, electrical, and fire protection systems.
| 10/05/2023 06:00 PM UTC |
|
OSU-220677, Science Village - Room 119
Renovation of 741 square feet of the existing 51,879 square foot 1st Floor of the OSU Science Village Building, including walls, doors, ceilings, finishes, and related MEP items.
| 10/04/2023 06:00 PM UTC |
|
OSU-221027, Stillman - Corridor and 4th Floor Renovation
Columbus Campus: The scope of work includes a single-phase renovation of the following Areas: Suite 400 2,329 SF, 4th Floor Corridor 1,308 SF, 3rd Floor Corridor 1,348 SF, 2nd Floor Corridor 1,513 SF and Area 425X 265 SF in Suite 425.
| 09/26/2023 06:00 PM UTC |
|
OSU-220236, Lima- Public Service Building Renovation
OSU Lima: 3,600 sf renovation of the existing Public Service Building and HVAC upgrades.
| 09/18/2023 06:00 PM UTC |
|
OSU-220221 OSUE West Parking Lot
Construction of a new parking lot to the west of Hughes Street on the
western edge of the OSU East Hospital Complex.)
| 09/13/2023 05:00 PM UTC |
|
OSU-230203, Harding - First Floor Restrooms
A two phased renovation of the existing public restrooms located on the first floor of Ohio State Harding Hospital, 1670 Upham Drive in Columbus, Ohio. The project scope includes Rooms 100T (Women’s 212 SF), 101T (Men’s 174 SF), 115T (Men’s 34 SF), 116T (Women’s 34 SF), 118T (Women’s 122 SF), 119T (Men’s 122 SF), 111T (Unisex 39 SF) and 112T (Unisex 39SF). Restrooms 100T and 101T will need to be ADA Accessible. Alternate G-1 will be an Add Alternate to provide new doors and hardware for Restrooms 100T, 101T, 115T, 116T, 118T, and 119T. Rooms 111T and 112T will be designed and advertised as Add Alternate G-2 and will be equipped with anti-ligature fixtures and accessories.
Phases One Restrooms 100T, 101T, and 115T as well as 112T if Alternate G-2 is accepted,
Phase Two Restrooms 118T, 119T and 116T as well as 111T if Alternate G-2 is accepted.
| 08/31/2023 06:00 PM UTC |
|
OSU-190008, Road and Bridge Improvements, FY2019 Bid Package #4
Trash Compactor Storage Area-Hess Road Rehabilitation
| 08/15/2023 06:00 PM UTC |
|
OSU-210264 Emergency Generators
Replaces existing interior emergency generators at Sisson Hall and Agricultural (Ag) Engineering with exterior generators. Scope of work includes associated Civil, MEP, Fire Protection Systems, and Hazardous Material removal.
| 08/10/2023 05:00 PM UTC |
|
OSU-220052 Campus Traffic Signal Upgrades
Establish fiber optic communication with OSU owned traffic signal
and the City of Columbus CTSS.
| 08/07/2023 06:00 PM UTC |
|
OSU-220071 Exterior Door Control Upgrades FY 22
This project will upgrade door operators in various buildings on campus.
| 08/03/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.