General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
05/22/2024 06:00 PM UTC
OSU-220567 - BioSci - Rms 411, 420A, 423, 433, 451, 452, 468, 472, 474, 476 Renov
The renovation of existing chemistry labs to install new owner provided and owner installed casework and equipment. Renovation will include modification to the lab architectural finishes, mechanical, electrical and plumbing systems to accommodate owner provide equipment. An Alternate 01 shall include work to provide fire alarm for the floor. Alternate 02 shall include all work associated with renovation of rooms 468, 470, 472, 474.
06/05/2024 06:00 PM UTC
OSU-230113 Campus Hardscape Improvements Phase 2
This project will improve campus hardscapes.
06/05/2024 06:00 PM UTC
OSU-230107 Electrical Renovations FY23-24 BP 1
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building including switchboards and panelboards.
06/10/2024 05:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-200604, Wooster - Selby Hall Elevator Replacement (Rebid)
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
04/21/2021 06:00 PM UTC
OSU-200548, MMP Tower HVAC Plan - REBID
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
04/15/2021 06:00 PM UTC
OSU-200104 HVAC Replacements FY 2020
RPAC/PEAS/McCorkle: Update Siemens Controls Knowlton Hall: Update Siemens Controls Davis Heart and Lung: Delta Controls Replacements Parker Food Science and Technology: Delta Controls Replacements Veterinary Med Academic: Delta Controls Replacements Scott Laboratory: Delta Laboratory Controls Replacement
04/09/2021 05:00 PM UTC
OSU-200548, MMP Tower HVAC Plan
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
03/26/2021 06:00 PM UTC
OSU-200101 West Campus Infrastructure Phase 1 BID PACKAGE 2
This project will provide infrastructure to support building projects in the west campus area, including WMC West Campus Ambulatory Facilities, Energy Advancement and Innovation Center, and the Interdisciplinary Research Facility. Improvements include additional vehicular lanes, modified/new intersection signalization, surface parking lots, and internal access roads. Utility work includes sanitary sewer, stormwater and water service extension.
03/26/2021 03:00 PM UTC
OSU-190877, Parks - Room 345 Renovation
OSU Main Campus: The project includes the renovation of Suite 335 and 345 in Parks Hall for the College of Pharmacy, approximately 3,400 square feet. The work includes selective interior demolition, abatement, and infrastructure demolition for the renovation of new research laboratories and support spaces. Scope of work includes new interior partitions, finishes, HVAC infrastructure upgrades, power/data distribution and lighting associated with the renovated spaces, new and modified plumbing associated with the renovated spaces.
03/23/2021 06:00 PM UTC
OSU-210094 Oxley's By The Numbers Plaza Phase 2
This project is the second phase of the plaza renovation.
03/11/2021 07:30 PM UTC
OSU- 190127 Water Meter Back Flow Preventerw Solicitation (24)
This project will install a back flow preventers at the two main City of Columbus domestic water meters. (1) Intersection of Lane and Olentangy River Road (2) Intersection of John Herrick Drive and Olentangy River Road
03/10/2021 07:30 PM UTC
OSU-190128 Envelope Modernization
This project will restore plazas and envelopes. McCorkle Aquatic Pavilion, Physical Activity and Education Services Recreation and Physical Activity Center
02/25/2021 07:00 PM UTC
OSU-190512, Dodd - Window Replacement
Removal and replacement of existing windows and interior sills on the first, second, third, fourth, and fifth floors. Work includes selective demolition and repair of interior partitions, sills, and soffits to accommodate new window systems and sills.
02/22/2021 07:00 PM UTC
181 - 190 of 506 Solicitations
1 2 15 16 17 19 21 22 23 50 51