General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 - Airport - Airfield Lighting Improvements REBID
BASE BID: This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building. ADDITIVE ALTERNATES: Three (3) additive alternates will be the rehabilitation of Taxiway A lighting, rehabilitation of Runway 9R-27L lighting, and replacement of priority 1 guidance signs.
06/22/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26 REBID
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
06/23/2026 06:00 PM UTC
OSU-230033, Marion - Various Campus Upgrades
Scope of work to include the removal of existing pedestrian bridge spanning campus pond with preparation for a future bridge, stabilization of campus pond partial shoreline, and Library/Classroom Building masonry repairs including replacement of window and door sealants and masonry cleaning and sealing of building exterior masonry.
06/25/2026 06:00 PM UTC
OSU-250283 BRT ULAR Cage Wash Environmental Improvements
BRT ULAR Cage Wash Environmental Improvements
07/08/2026 05:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-220282, Airport - Taxiway A Rehabilitation
OSU Airport: Phase 1 - Rehabilitation of Taxiway A
04/11/2023 06:00 PM UTC
OSU-220259, 700 Ackerman - 4th Floor Improvements
Columbus Campus: The project will consist of the construction of approximately 7,040 Sf of existing office space within suite 400 on the 4th floor of the 700 Ackerman Place building. The renovation will include new entry, finish upgrades, along with mechanical plumbing and electrical upgrades.
03/31/2023 06:00 PM UTC
OSU-210675, Ross - Suite H2260 CT Install and Renovation
Interior renovation to create a CT imaging suite, including imaging equipment and associated mechanical equipment, casework, finishes and accessories. Medical Center will continue to operate during construction. Contractor will follow all Medical Center ICRA and ILSM requirements.
03/30/2023 06:00 PM UTC
OSU-220520 Mechanical Room Refreshes FY 22 (Re-Bid)
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
03/29/2023 05:00 PM UTC
OSU-210270 - Plumbing Repairs VMC
Replacement of existing galvanized steel cold water piping. Installation of new piping prior to demolition of active mains. Removal of all obsolete piping. Replacement of aging valves in the hot and cold-water system. Select under slab sanitary work to fix known issues. Replacement of flooring in areas of under slab work. Select above ceiling sanitary work to fix known issues/leaks. Abatement of select valves and flooring mastic. All work required for installation in an active and occupied veterinary hospital facility.
03/24/2023 05:00 PM UTC
OSU-220281, Airport - Terminal Apron Rehabilitation
OSU Airport: Phase 1 Rehabilitation of Terminal Apron from Asphalt to Concrete.
03/21/2023 06:00 PM UTC
OSU-200514 Eye & Ear Institute Parking Lot Repaving
This project will repave the parking lot and main drive along with other improvements.
03/16/2023 06:00 PM UTC
OSU-220611 11th Avenue Conversion
This project will convert 11th Avenue
03/03/2023 07:00 PM UTC
OSU-220522 Mechanical Room Refreshes FY 22
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications.
02/28/2023 06:00 PM UTC
OSU-200328 Tunnel System Evaluation BP 02
The Project consists of the permanent abandonment of the 19th Avenue Tunnel and the rehabilitation of the Cockins Hall Vault. The Project will also remove and replace piping within the Cockins Hall Vault and relocate communications cabling within the 19th Avenue Tunnel.
02/23/2023 07:00 PM UTC
181 - 190 of 627 Solicitations
1 2 15 16 17 19 21 22 23 62 63