General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230304 Converse Hall - Bathroom/Shower Renovation
Multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette.
05/14/2024 06:00 PM UTC
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
05/15/2024 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-230113 Campus Hardscape Improvements Phase 1 REBID
This project will improve campus hardscapes.
03/19/2024 06:00 PM UTC
OSU-230414 - Smith Lab - Forensic Lab 4097 Renovation
The Ohio State University is seeking a general contractor to execute the renovation and conversion of a classroom space into a forensic anthropology laboratory. The renovation will include the removal/ abatement of ACM materials, the augmentation of the space surfaces to allow for cleaning, installation of requisite fixed and mobile dry and wet equipment. Plumbing scope includes backflow prevention, coring concrete for floor drains, and necessary sanitary and supply distribution piping to the sink. Mechanically, the project will remove the space from building air, and tie the space into the existing DOAS air handler. A capture hood, ductwork to a new roof-mounted exhaust fan, as well as air balancing are also included in the project scope. Controls modifications are included. Electrical modifications to supply the equipment include the addition of a sub-panel, and distribution circuiting in the space. Additionally, electrical work in the penthouse to feed the exhaust fan VFD, and smoke and fire separation at the floor are included.
03/14/2024 06:00 PM UTC
OSU-230246, EEI - 4th Floor Otolaryngology Redesign
Tenant improvements of approximately 1,364sf on the fourth floor of the EEI Building, to accommodate a new Otolaryngology Research suite. The project will create a large staff workroom with conferencing capabilities, an Exam Room for a portable c-arm and conferencing capabilities, and minor upgrades to an Observation Room and Office.
03/13/2024 06:00 PM UTC
OSU-220591, East - Tower 6 Renovation
Renovation of the existing 6th floor of the patient tower: Approximately 10,450 square feet of patient rooms, corridors, nurses’ station and accessory functions. Patient rooms and corridors include primarily refresh, while the center core area will be reconfigured with associated mechanical, plumbing, electrical and life safety items.
03/12/2024 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I
The project consists of the removal and abandonment of tunnels on the University’s Midwest campus. The removal and abandonment of tunnels includes the removal of abandoned piping within the tunnels. New direct buried steam, communications, and medium-voltage electric lines will need to be installed as part of the project’s scope of work as well
03/07/2024 03:00 PM UTC
OSU-230107 Electrical Renovations FY23-24
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building and Cockins Hall Building including switchboards and panelboards, upgrade egress lighting systems, and provide circuit tracing and receptacle replacement.
03/04/2024 06:00 PM UTC
OSU-230111 Road/Bridge Renewal FY23-24
The planned scope of work includes rehabilitation three bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River, and Drake Pedestrian Bridge over Olentangy River Road and River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs
03/01/2024 07:00 PM UTC
OSU-230517 - Ohio Union - CCTV Upgrade
This project will complete a full replacement of the CCTV system at The Ohio State University Ohio Union Building.
02/21/2024 07:00 PM UTC
OSU-220458, Outpatient Care East - Xray Machines
Interior renovation for new x-ray equipment and casework within existing occupied outpatient care facility.
02/16/2024 07:00 PM UTC
OSU-230412, Schottenstein - Fire Alarm Completion
This project will upgrade the remaining fire alarm systems throughout the Schottenstein Center that has not been previously completed through other projects. The scope of the project will require a design to upgrade the system to be compliant with current codes and University design standards and will include new and upgrades/replacement of audio and visual devices, pathways and wiring throughout portions of the building. There will also be work involved with the existing fire suppression systems to replace or add components to coordinate with the new work.
01/25/2024 07:00 PM UTC
11 - 20 of 505 Solicitations
2 4 5 6 7 8 9 50 51