General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
12/03/2025 07:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
12/10/2025 07:00 PM UTC
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/10/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-210456 - Wooster - Lab Bldg USDA Rm 305
This project will improve to shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
08/26/2022 06:00 PM UTC
OSU-160980 Plumbing System Replacement BP3 - Wilce Piping Replacement
This project will replace deteriorating plumbing systems.
08/18/2022 05:00 PM UTC
OSU-210096, Doan-Rhodes - Replace Imaging Equipment REBID
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase One – the Zee MP and Spect CT areas; Phase Two – the Agile area; and Phase Three – the technician work area.
07/29/2022 06:00 PM UTC
OSU-200591, Lima - Galvin Hall Basement Renovation
Lima Campus: The project will renovate approximately 10,022 SF on the Basement Level. The scope of the project is to expand the Student Activity Spaces; rooms include a Commons, Student Lounge, Game Room, Catering Kitchen, Kitchenette, Huddle Rooms, Conference Space, Offices and an Exterior Patio Space directly outside the Commons.
07/26/2022 06:00 PM UTC
OSU-220008 - Neil Ave Building-Cooling Tower Replacement
This project will replace the cooling tower in the Neil Avenue Building.
07/26/2022 06:00 PM UTC
OSU-210329 650 Ackerman Roof Replacement
This project will replace the existing roof, make repairs to the existing deck, and add a roof drain and insulation to improve drainage.
07/21/2022 06:00 PM UTC
OSU-210268 Elevator Safety Repairs and Replacements
Elevator Modernization and related architectural and MEP scopes of work for a total of 7 elevators in 4 buildings on OSU’s Main Campus: Arps Hall (1 passenger elevator base bid) Dulles Hall (2 passenger elevators base bid) Smith Lab (1 passenger, base bid and 1 Freight Elevator, Alternate) University Hall (2 elevators base bid)
06/29/2022 06:00 PM UTC
OSU-200377, Waterman Dairy Improvements
Renovations to the existing Waterman Main Dairy Barn to convert the existing tie stall barn to a free stall barn with new robotic milking, feed, and manure systems. The project will also upgrade the building electrical service and add a new generator.
06/22/2022 06:00 PM UTC
OSU-190279, Wooster - GDAL Swine Finishing
Wooster Campus: Provide and install a new prefabricated, modular building structure, site preparation and all supporting utility infrastructure.
06/21/2022 06:00 PM UTC
OSU-210096, Doan-Rhodes - Replace Imaging Equipment REBID
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase One – the Zee MP and Spect CT areas; Phase Two – the Agile area; and Phase Three – the technician work area.
06/21/2022 06:00 PM UTC
191 - 200 of 590 Solicitations
1 2 16 17 18 20 22 23 24 58 59