General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
08/21/2025 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
09/03/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-210287, Marion - Alber Student Center Renovation Ph 2
OSU Marion: Interior renovation and improvement of selected areas of the Alber Student Center, including the existing public restrooms, locker rooms, game room, and gymnasium.
04/08/2022 06:00 PM UTC
OSU-190066 HVAC Replacements FY 2019 - Bid Package 02
Davis Heart and Lung: Delta Controls Replacements
04/01/2022 06:00 PM UTC
OSU-210440, Airport - Hangar Airpark Development (REBID)
OSU Airport: Extension of Taxiway A8 and Service Road (REBID)
03/30/2022 06:00 PM UTC
OSU-210286 - Mansfield - Exterior Signs and Walk Renovation
This project will include the fabrication and installation of campus-wide exterior signage including vehicular directional, pedestrian directional, service area identification, building identification, parking lot identification. Also includes removal of some existing exterior signs
03/25/2022 06:00 PM UTC
OSU-200328 Tunnel System Evaluation - BP 1 Tunnel Temporary
The project consists of the installation of temporary structural supports within the 19th Avenue Tunnel and the Cockins Hall Vault. The project will also remove and replace piping within the Cockins Hall Vault, remove abandoned utilities within the 19th Avenue Tunnel, and re-rack existing communications cabling within the 19th Avenue Tunnel. Temporary lighting will also be installed in the 19th Avenue Tunnel.
03/25/2022 06:00 PM UTC
OSU-210274-1, BMEC Ph 2 - Demolition
OSU Columbus Campus: The scope will include the total demolition of Watts Hall (2041 College Rd, Columbus, OH 43210-1178) which is physically connected to MacQuigg Hall (105 W Woodruff Ave, Columbus, OH 43210-1117). The buildings are located in the central core of campus which is highly populated. The building to remain will need to be shored and separated from Watts along with disconnection and termination of any utility and mechanical pipes that may feed the building from MacQuigg. The scope of work to include building demolition, abatement, MEP / Electrical disconnects, site work, and shoring of building to remain. Upon completion of the demolition, the site will need to be brought to grade and seeded. The demolition will allow for future building to be erected for the Biomedical and Materials Engineering Complex.
03/23/2022 06:00 PM UTC
OSU-210440, Airport - Hangar Airpark Development
OSU Airport: Extension of Taxiway A8 and Service Road
03/03/2022 07:00 PM UTC
OSU-210473 National Pan-Hellenic Council (NPHC) Plaza
This project will construct a National Pan-Hellenic Council Plaza adjacent to Hale Hall at OSU Columbus Campus.
03/02/2022 07:00 PM UTC
OSU-210271 Road/Bridge Improvements BP 1
Project includes improvements to College Road between Woodruff Avenue and 18th Avenue. Improvements to College Road include installation of curb ramps, installation of bus lane, replacement or installation of sidewalk, full depth replacement of pavement, replacement of curb, lighting, and storm sewer improvements.
02/22/2022 02:00 PM UTC
OSU-200101-BP 3
West Campus Infrastructure Phase 1 Bid Package 3- Provide infrastructure and lane widening for Kenny Road
02/21/2022 04:00 PM UTC
191 - 200 of 570 Solicitations
1 2 16 17 18 20 22 23 24 56 57