General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Project generally includes the removal and replacement of three underground storage tanks along with improvements to related equipment and infrastructure such as dispensers, concrete, canopies, etc…
10/15/2026 06:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-210675, Ross - Suite H2260 CT Install and Renovation
Interior renovation to create a CT imaging suite, including imaging equipment and associated mechanical equipment, casework, finishes and accessories. Medical Center will continue to operate during construction. Contractor will follow all Medical Center ICRA and ILSM requirements.
03/30/2023 06:00 PM UTC
OSU-220520 Mechanical Room Refreshes FY 22 (Re-Bid)
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
03/29/2023 05:00 PM UTC
OSU-210270 - Plumbing Repairs VMC
Replacement of existing galvanized steel cold water piping. Installation of new piping prior to demolition of active mains. Removal of all obsolete piping. Replacement of aging valves in the hot and cold-water system. Select under slab sanitary work to fix known issues. Replacement of flooring in areas of under slab work. Select above ceiling sanitary work to fix known issues/leaks. Abatement of select valves and flooring mastic. All work required for installation in an active and occupied veterinary hospital facility.
03/24/2023 05:00 PM UTC
OSU-220281, Airport - Terminal Apron Rehabilitation
OSU Airport: Phase 1 Rehabilitation of Terminal Apron from Asphalt to Concrete.
03/21/2023 06:00 PM UTC
OSU-200514 Eye & Ear Institute Parking Lot Repaving
This project will repave the parking lot and main drive along with other improvements.
03/16/2023 06:00 PM UTC
OSU-220611 11th Avenue Conversion
This project will convert 11th Avenue
03/03/2023 07:00 PM UTC
OSU-220522 Mechanical Room Refreshes FY 22
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications.
02/28/2023 06:00 PM UTC
OSU-200328 Tunnel System Evaluation BP 02
The Project consists of the permanent abandonment of the 19th Avenue Tunnel and the rehabilitation of the Cockins Hall Vault. The Project will also remove and replace piping within the Cockins Hall Vault and relocate communications cabling within the 19th Avenue Tunnel.
02/23/2023 07:00 PM UTC
OSU-210393 Healthy Community Center Renovation
Repurpose and renovation of the existing Martin Luther King Library on Long Street into a “Healthy Community Center” including demonstration kitchen, rentable community space, and leasable café.
02/14/2023 07:00 PM UTC
OSU-220393 University Hall - Rm 014 Renovation
Renovation of lecture hall to include fixed seating, ADA access to instructor, finishes, and technology
02/08/2023 07:00 PM UTC
201 - 210 of 645 Solicitations
1 2 … 17 18 19 21 23 24 25 … 64 65