General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
08/13/2026 06:00 PM UTC
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM membrane. • Selective replacement of damaged, wet, or deteriorated insulations. • Replacement of edge metals. • Lightening protection replacement. • Fire alarm panel replacement. • Fire pump controller replacement (alternate)
08/19/2026 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
08/20/2026 06:00 PM UTC
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
08/20/2026 06:00 PM UTC
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
08/26/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
08/27/2026 06:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-210626, Doan - Room 425 Pre Op Refresh
Interior renovation including ceilings, flooring, paint, and other general construction.
01/25/2023 07:00 PM UTC
OSU-210456 Wooster - Lab Bldg USDA Rm 305 Build Out REBID
This project will improve the shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
01/24/2023 07:00 PM UTC
OSU-220002, MMP Pavilion - SOLA MRI REBID
Removal of existing MRI Equipment and replacement within existing MRI suite. Associated work to include limited demolition and upgrades to associated structural and MEP systems within the suite and on the roof of the existing building. Work to be completed within an active patient environment.
01/19/2023 07:00 PM UTC
OSU-190128 Envelope Modernization
This project will repair Larkins Plaza waterproofing, drains, and concrete as well as portions of the curtain walls on RPAC. Project will add lighting and repair concrete ramps and stairs.
01/11/2023 08:00 PM UTC
OSU-210420, Newark - Founders Hall Enhancements
Full abatement services to the Founders Hall building on the OSU/COTC Newark Campus.
01/05/2023 07:00 PM UTC
OSU-210267 HVAC Repair and Replacements FY 21 Re Bid
This project will repair or replace HVAC systems across campus.
12/22/2022 06:00 PM UTC
OSU-210573, East Hospital-Talbot Hall 1st and 3rd Floor Renovation
3rd Floor: Demo of existing Office Area, approximately 3,700 sq ft. Construction of new offices with associated ME and Fire Suppression work. 1st Floor: Selective demo of existing Office, Restroom and Meeting Areas, approximately 4,300 sq ft. Renovations of Restrooms and selective rooms for new 30 day stay patient rooms, meeting rooms, laundry and living area with associated MEP and Fire Suppression work.
12/20/2022 07:00 PM UTC
OSU-210542 Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane
Rhodes Biplane and Xray Equipment Replacement Interior renovation to replace existing Biplane and Xray equipment. Includes equipment replacement, relocation of walls, new doors and viewing windows, ceilings, fixtures and renovation of interior finishes.
12/07/2022 07:00 PM UTC
OSU-220257, Dulles Hall - Room 106 Renovation
Columbus Campus: The project will consist of the construction of approximately 2,765 SF of existing office space in Dulles Hall Room 106. The renovation will include a new entry, reception area, work area and finish upgrades throughout along with mechanical, plumbing, and electrical upgrades.
11/30/2022 07:00 PM UTC
OSU-210456 Wooster - Lab Bldg USDA Rm 305 Build Out
This project will improve to shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
11/28/2022 07:00 PM UTC
201 - 210 of 631 Solicitations
1 2 17 18 19 21 23 24 25 63 64