Upcoming Solicitations

Number Deadline
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/14/2025 06:00 PM UTC
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
05/20/2025 06:00 PM UTC
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001 Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
05/21/2025 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-210119, 600 & 610 Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
12/10/2021 07:00 PM UTC
OSU-210308, Evans Hall - Pathology Space
Renovations to select areas of the existing 1st and 2nd floors of Evans Hall to create more functional program spaces and support the College of Medicine, Department of Pathology.
12/09/2021 07:00 PM UTC
OSU-210180, Aerospace Research Center - Rm 121 Upgrades
Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
12/02/2021 07:00 PM UTC
OSU-210473 National Pan-Hellenic Council (NPHC) Garden
Project will include the sitework for the construction of a garden area including earthwork and excavation, seat walls, plaza pavements, monument foundations, soils, and landscaping.
12/02/2021 07:00 PM UTC
OSU-210404, Newark - Hopewell Hall Improvements
OSU Newark: Project includes renovating a set of restrooms to make them meet ADA and update the finishes. Creation of a gender-neutral restroom will be added near the existing restroom bank.
12/02/2021 07:00 PM UTC
OSU-200666, Riffe - 6th Floor Labs Renovation
Interior renovations of existing labs 603, 609, 611, 637, 639, 643, and room 620. Renovations consist of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems associated with the renovation.
11/29/2021 07:00 PM UTC
OSU-210336, Evans Lab - 3021/3023 Grad Rooms
Renovate approximately 752 SF of the third floor of Evans Lab, at 88 West 18th Avenue, Columbus, OH. The project scope includes the following Rooms on the Third Floor: 3021 and 3023. The scope of the project is to convert existing lab spaces into office areas to accommodate graduate student workspaces. The renovation will upgrade finishes, plumbing for a new coffee station with sink, minor alterations to HVAC throughout the project area, provide new lighting, and additional power as required to accommodate workstations. Alternate G-1 to provide and install new flooring, remove existing window coverings and provide and install new roller shades. Alternate H-1 to remove existing sheet metal cover and provide and install new finned tube cover.
11/22/2021 07:00 PM UTC
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
11/17/2021 07:00 PM UTC
OSU-190040, James - Pharmacy Suite
Interior renovation to add automated picking equipment to the existing pharmacy. Pharmacy will continue to operate during construction. Work will be sequenced to accommodate operations.
11/10/2021 07:00 PM UTC
OSU-210040, BSH - Thoracic Team Room
The project will consist of the construction of thoracic exam rooms, team rooms, general offices, CTPL lab space and associated fire protection, HVAC, plumbing and electrical work; located on the ground and second floors of the brain and spine hospital. Locations of work include the renovation of suite 214 for the new thoracic team room with a breakroom. Relocated phone triage in 049. Renovations of suite 234 to include (5) new exam rooms. Relocate the CPTL lab to the existing storage room in room 022 on the ground floor. Relocation of the CTO research staff offices to the existing conference room 087.
11/09/2021 07:00 PM UTC