General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220012 Wooster - National Greenhouse HVAC
This project will remove existing steam boiler, piping and heating equipment and provide new air distribution and heating equipment
11/11/2022 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP3 REBID
This project will replace deteriorating plumbing systems.
11/04/2022 05:00 PM UTC
OSU-210236, Parks - 3rd Floor Lab Renovations
The project includes work on the third floor of Parks Hall. Work within Parks Hall is primarily located within the third floor in the South end of the building. Work includes the selective demolition of existing elements to fully renovate 4,600 sf of existing third floor laboratory (Suites 319, 323 and Rooms 316 and 320) into a new laboratory space. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
11/03/2022 06:00 PM UTC
OSU-190865, Polaris - Cytogenetics Lab Expansion
Selective renovation for expansion of Cytogenetics Labs, including multiple lab areas and the addition of an additional emergency generator.
11/02/2022 06:00 PM UTC
OSU-210682 - Mansfield - Civic Plaza Improvements REBID
This project will create a new outdoor plaza area between Eisenhower Memorial Center and Conard Hall - approx. 4,000 SF
10/27/2022 06:00 PM UTC
OSU-210267 HVAC Repair and Replacements FY 21
This project will repair or replace HVAC systems across campus.
10/18/2022 06:00 PM UTC
OSU-210310, Graves - Pathology Renal Space Phase 1 and Phase 2 REBID
The project will consist of the construction of approximately 2100 SF of existing space into lab space and approximately 2175 SF of office space renovations in the basement of Graves Hall on the Columbus Campus of The Ohio State University, 333 W. 10th Ave., Columbus, Ohio.
10/14/2022 06:00 PM UTC
OSU-190025-BP2 Roof Replacements FY 2019
This project will replace roofs on various campus buildings.
10/12/2022 06:00 PM UTC
OSU-210287, Marion - Alber Student Center Renovation Ph 2 (REBID)
Marion Campus: Interior renovation and improvement of selected areas of the Alber Student Center, including the existing public restrooms, locker rooms, game room, and gymnasium.
10/05/2022 06:00 PM UTC
OSU-210346, East - Renovate for Flouro and ED X-Ray
The Project consists of the renovation of select areas on Level 2 of The Ohio State University Wexner Medical Center East Hospital to support the replacement of existing medical imaging equipment in CT, X-Ray, Rad-Fluoro, and Stress/Echo.
09/30/2022 06:00 PM UTC
201 - 210 of 617 Solicitations
1 2 17 18 19 21 23 24 25 61 62