General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
05/22/2024 06:00 PM UTC
OSU-220567 - BioSci - Rms 411, 420A, 423, 433, 451, 452, 468, 472, 474, 476 Renov
The renovation of existing chemistry labs to install new owner provided and owner installed casework and equipment. Renovation will include modification to the lab architectural finishes, mechanical, electrical and plumbing systems to accommodate owner provide equipment. An Alternate 01 shall include work to provide fire alarm for the floor. Alternate 02 shall include all work associated with renovation of rooms 468, 470, 472, 474.
06/05/2024 06:00 PM UTC
OSU-230113 Campus Hardscape Improvements Phase 2
This project will improve campus hardscapes.
06/05/2024 06:00 PM UTC
OSU-230107 Electrical Renovations FY23-24 BP 1
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building including switchboards and panelboards.
06/10/2024 05:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-190141, Sea Grant - Stone Laboratory
OSU Stone Laboratory, South Bass Island: The project will add ~3,500 sq ft of laboratory and support space to the Research Building at Peach Point on South Bass Island.
10/22/2020 06:00 PM UTC
OSU-200307, Family Medicine and Mammography - Pickerington
Renovation approximately 11,000 SF for tenant lease space on the second floor. Space to have two separate entrances for Family Medicine and Mammography. The Family Medicine space will also contain an Optometry clinic.
09/29/2020 06:00 PM UTC
OSU-200218, Celeste - Room 36 Nexus Laser Renovation (REBID)
REBID: The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
09/24/2020 06:00 PM UTC
OSU-190385, Parks-Room 145 Renovation (REBID)
OSU Columbus Campus: (REBID) Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
09/02/2020 06:00 PM UTC
OSU-200218, Celeste - Room 36 Nexus Laser Renovation
The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. The lab space will be cleanroom ISO 7 classification. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
08/27/2020 06:00 PM UTC
OSU-190385, Parks - Room 145 Renovation
OSU Columbus Campus: Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
08/18/2020 06:00 PM UTC
OSU-190881, Doan - 9 North Office Reconfiguration
3,000 square foot interior renovation providing a reconfiguration of existing administrative offices on the 9th floor of Doan Hall. New interior floor, wall, window shades and ceiling finishes are provided with corresponding upgrades to the existing mechanical, electrical power, lighting, data, fire alarm and fire suppression systems. Upgrades to the existing temperature control pneumatic and isolation values connecting to new thermostats are also a part of the scope of work if Alternates G1and H1 are accepted by the Owner. The work will be performed in 2 Phases.
08/11/2020 06:00 PM UTC
OSU-180707 Ag Admin Chiller Replacment
Remove water cooled chiller, cooling tower, condenser water pump, condenser water tank and associated piping and controls. Remove multizone air handler, piping and controls. Provide new air cooled condensing unit on roof, piping and controls. Provide new multizone air handler, piping and controls. Provide new direct digital controls. Hazardous material abatement.
08/04/2020 05:00 PM UTC
OSU-190128 Envelope Modernization
RPAC, McCorkle Pavilion and Larkins Plaza -This project will restore plazas and envelopes.
08/03/2020 06:00 PM UTC
OSU-190008 Road and Bridge Improvements, FY19-Bid Package No-02
This project will mill and fill, and improve sidewalks and curbs
07/31/2020 06:30 PM UTC
201 - 210 of 506 Solicitations
1 2 17 18 19 21 23 24 25 50 51