General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250201 - Schottenstein Center - Scoreboard Replacement -Extended Opening
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/19/2026 07:00 PM UTC
OSU-250015 Lima - Cook Hall Restroom Renovation
Description Interior renovations to group restrooms and lactation room in Cook Hall at The Ohio State University – Lima, including associated mechanical, electrical and plumbing improvements.
01/28/2026 07:00 PM UTC
OSU-255191, Ross Cardiac Cath Lab #5 Renovation/Replacement
Renovation and equipment replacement of Cath Lab #5.
02/05/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OSU-220049, Outpatient Gahanna, Pelvic Health Renovation
Renovation of approximately 3,600 square feet of tenant space of the Pelvic Health clinic located at Outpatient Gahanna. The renovation is the conversion of an existing nuclear camera suite, restroom, stress lab, hot lab, tech space, prep areas, sub waiting and phone triage rooms into a PT gym with large team room. The plan converts existing offices, reading room and echo lab into additional exam rooms. It reworks nurses station into clean and soil rooms and adds storage areas. The project contains several bid alternates allowing the suite to be refreshed in the new OSUWMC finish standards.
02/17/2022 07:00 PM UTC
OSU-210338, Bevis Hall - 3rd Flr SIM Center Relocation
OSU Columbus Campus: The renovation of approximately 3,692 SF of existing office space on the 3rd Floor of Bevis Hall located at 1080 Carmack Road, in Columbus, Ohio. The project scope includes the following Rooms: Base Bid: Third Floor - 317, 341, 371, 386, 387, 389, 390, 393, 394, 397, 398, X305C and X307C. The scope of the project is to create an open and collaborative work environment and upgrade finishes throughout the project area. Alternate G-1: Provide and install new paint on exposed existing concrete structure in Room 315.
02/15/2022 07:00 PM UTC
OSU-210296, PAST Innovation Lab
The PAST Foundation Interior renovations consisting of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems.
02/04/2022 07:00 PM UTC
OSU-210116, 610 Ackerman Warehouse
HVAC, Fire Suppression, and electrical upgrades; safety, security, and accessibility upgrades; limited interior construction including new plumbing facilities.
01/31/2022 07:00 PM UTC
OSU-210180, Aerospace Research Center - Rm 121 Upgrades (REBID)
OSU Columbus Campus: Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
01/24/2022 07:00 PM UTC
OSU-191035 Field Hockey Press Box
This Project will provide demolition, new site work and building construction of the Field Hockey Press Box located on the West side of the existing Buckeye Field.
01/20/2022 07:00 PM UTC
OSU-210283 Mansfield - Recreation Center Fire Alarm Upgrade
This project will provide new manual, addressable, voice, ADA compliant fire alarm system in the Recreation Center on the OSU Mansfield Campus.
01/18/2022 07:00 PM UTC
OSU-210282 Mansfield - Boiler Replacement
OSU Mansfield Campus: Campus Recreation Center - Remove existing boiler. Install 2 high efficiency boilers, pumps, and expansion tank. Eisenhower Memorial Center - Remove existing boilers. Install 2 high efficiency boilers, abatement and 2 alternates
01/18/2022 07:00 PM UTC
OSU-210285 - Mansfield - Building Entries Renewal and Renovation
Replace selected existing main entrance vestibules, doors, storefront, ADA hardware and miscellaneous exterior concrete slabs at the following buildings: Campus Recreation Center (1729 University Drive) and Eisenhower Memorial Hall (1640 University Drive) located on The Ohio State University’s Mansfield Campus, Mansfield, Ohio, Richland Country.
01/18/2022 07:00 PM UTC
OSU-210289, Newark - HVAC Renovations
The work includes the replacement of an existing packaged RTU on the first floor roof of Hopewell Hall. The existing unit is a packaged DX cooling unit with hot water heat. The new unit will be of like design. Existing duct connection points to remain in the same place. Electrical power to RTU equipment will be replaced. Lightning protection system will be extended to new RTU. The single ply membrane roof system will require modifications to allow for the new unit and duct. A small portion of roof railing for fall protection.
01/11/2022 07:00 PM UTC
231 - 240 of 599 Solicitations
1 2 20 21 22 24 26 27 28 59 60