The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 12/02/2025 07:00 PM UTC |
|
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
| 12/03/2025 07:00 PM UTC |
|
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
| 12/10/2025 07:00 PM UTC |
|
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/10/2025 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190122 Infrastructure Improvements 1
Replace approximately two dozen failing and non-compliant curb ramps across campus.
| 08/12/2021 12:35 PM UTC |
|
OSU-200538 Orton Hall Envelope Repairs
OSU-200358
This project includes building envelope repairs to Orton Hall, including isolated masonry and below-grade waterproofing repairs, as well as roofing. The roofing scope includes repairs to the main roof flashings and drainage elements, as well as replacement of the apse roof and leakage repairs at the northeast corner.
| 08/06/2021 06:00 PM UTC |
|
OSU-210119, 600 & 610 Ackerman Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
| 08/04/2021 06:00 PM UTC |
|
OSU-200102 Enhanced Maintenance FY 2020
This project includes the rehabilitation of building enclosure elements at Lazenby Hall, including isolated masonry and window repairs, and replacement of the clay tile roof. The roof replacement will include new flashings and drainage elements, and reuse the clay roof tiles.
| 07/29/2021 06:00 PM UTC |
|
OSU-200539, Harding Hosp - Nursing Station Renovation
OSU Harding Hospital Nursing Station renovation. Work Includes renovation to existing Nurse Station on Level 2, Level 3 and Level 4.
| 07/15/2021 06:00 PM UTC |
|
OSU-210119, 600 & 610 Ackerman Roof Replacement
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
| 07/14/2021 06:00 PM UTC |
|
OSU-190008 Road and Bridge Improvements, FY19-Bid Package No-03
New BP3 - Hess Road
| 07/09/2021 06:30 PM UTC |
|
OSU-190394, Wooster - Seed Storage
OSU Wooster Campus: Provide and install a complete, operational 12’x36’x9’H walk-in environmental unit with two, equally-sized interior spaces. Provide all indicated infrastructure modifications indicated on plans
| 06/29/2021 06:00 PM UTC |
|
OSU-210176. Arps Hall 168T, 178T and 180T Improvements
Renovate approximately 455 SF of toilet rooms on the first floor of Arps Hall located at 1945 N. High Street in Columbus, Ohio. The project scope includes Rooms 168T, and a combination of 178T and 180T. The scope of the renovations will reconfigure the existing toilet rooms identified above: to transform the current Women’s toilet room 168T into a new ADA compliant Multi-User Men’s Toilet Room and to combined Rooms of 178T a current Women’s toilet room and 180T a current Men’s toilet room into a new ADA compliant Multi-User Women’s Toilet Room. The existing janitor’s closet, Room 180J, will also be modified.
| 06/29/2021 06:00 PM UTC |
|
OSU-200437, Howlett Hoop House Replacements (REBID)
Columbus Campus: Site modifications, structure demolition and construction of new prefabricated Hoop Houses for The Ohio State University as described in the documentation issued by and Ford & Associates Architects, Inc. dated June 3, 2021.
| 06/22/2021 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.