General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250201 - Schottenstein Center - Scoreboard Replacement -Extended Opening
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/19/2026 07:00 PM UTC
OSU-250015 Lima - Cook Hall Restroom Renovation
Description Interior renovations to group restrooms and lactation room in Cook Hall at The Ohio State University – Lima, including associated mechanical, electrical and plumbing improvements.
01/28/2026 07:00 PM UTC
OSU-255191, Ross Cardiac Cath Lab #5 Renovation/Replacement
Renovation and equipment replacement of Cath Lab #5.
02/05/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OSU-200538 Orton Hall Envelope Repairs
OSU-200358 This project includes building envelope repairs to Orton Hall, including isolated masonry and below-grade waterproofing repairs, as well as roofing. The roofing scope includes repairs to the main roof flashings and drainage elements, as well as replacement of the apse roof and leakage repairs at the northeast corner.
08/06/2021 06:00 PM UTC
OSU-210119, 600 & 610 Ackerman Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
08/04/2021 06:00 PM UTC
OSU-200102 Enhanced Maintenance FY 2020
This project includes the rehabilitation of building enclosure elements at Lazenby Hall, including isolated masonry and window repairs, and replacement of the clay tile roof. The roof replacement will include new flashings and drainage elements, and reuse the clay roof tiles.
07/29/2021 06:00 PM UTC
OSU-200539, Harding Hosp - Nursing Station Renovation
OSU Harding Hospital Nursing Station renovation. Work Includes renovation to existing Nurse Station on Level 2, Level 3 and Level 4.
07/15/2021 06:00 PM UTC
OSU-210119, 600 & 610 Ackerman Roof Replacement
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
07/14/2021 06:00 PM UTC
OSU-190008 Road and Bridge Improvements, FY19-Bid Package No-03
New BP3 - Hess Road
07/09/2021 06:30 PM UTC
OSU-190394, Wooster - Seed Storage
OSU Wooster Campus: Provide and install a complete, operational 12’x36’x9’H walk-in environmental unit with two, equally-sized interior spaces. Provide all indicated infrastructure modifications indicated on plans
06/29/2021 06:00 PM UTC
OSU-210176. Arps Hall 168T, 178T and 180T Improvements
Renovate approximately 455 SF of toilet rooms on the first floor of Arps Hall located at 1945 N. High Street in Columbus, Ohio. The project scope includes Rooms 168T, and a combination of 178T and 180T. The scope of the renovations will reconfigure the existing toilet rooms identified above: to transform the current Women’s toilet room 168T into a new ADA compliant Multi-User Men’s Toilet Room and to combined Rooms of 178T a current Women’s toilet room and 180T a current Men’s toilet room into a new ADA compliant Multi-User Women’s Toilet Room. The existing janitor’s closet, Room 180J, will also be modified.
06/29/2021 06:00 PM UTC
OSU-200437, Howlett Hoop House Replacements (REBID)
Columbus Campus: Site modifications, structure demolition and construction of new prefabricated Hoop Houses for The Ohio State University as described in the documentation issued by and Ford & Associates Architects, Inc. dated June 3, 2021.
06/22/2021 06:00 PM UTC
OSU-200685, Wooster - Pathways & Civic Infrastructure Improvements
OSU Wooster: This project encompasses 3 individual sites that help to connect the CFAES Wooster campus to the Ohio Agricultural Research and Development Center and Agricultural Technical Institute. A proposed 5-foot concrete walk will connect the Skou parking lot to the ATI administration building (site 1) and will include grading, pavement removal, extension of existing storm pipe, addition of ADA ramps and landscape. A proposed 10-foot asphalt multi-use path will connect the residential area to both the Skou lot (site 2) and the new science building (site 3), this work will include pavement removal, grading, addition of a catch basin, addition of ADA ramps, and landscape.
06/09/2021 06:00 PM UTC
261 - 270 of 599 Solicitations
1 2 23 24 25 27 29 30 31 59 60