OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/16/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/04/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-190877, Parks - Room 345 Renovation
OSU Main Campus: The project includes the renovation of Suite 335 and 345 in Parks Hall for the College of Pharmacy, approximately 3,400 square feet. The work includes selective interior demolition, abatement, and infrastructure demolition for the renovation of new research laboratories and support spaces. Scope of work includes new interior partitions, finishes, HVAC infrastructure upgrades, power/data distribution and lighting associated with the renovated spaces, new and modified plumbing associated with the renovated spaces.
03/23/2021 06:00 PM UTC
OSU-210094 Oxley's By The Numbers Plaza Phase 2
This project is the second phase of the plaza renovation.
03/11/2021 07:30 PM UTC
OSU- 190127 Water Meter Back Flow Preventerw Solicitation (24)
This project will install a back flow preventers at the two main City of Columbus domestic water meters. (1) Intersection of Lane and Olentangy River Road (2) Intersection of John Herrick Drive and Olentangy River Road
03/10/2021 07:30 PM UTC
OSU-190128 Envelope Modernization
This project will restore plazas and envelopes. McCorkle Aquatic Pavilion, Physical Activity and Education Services Recreation and Physical Activity Center
02/25/2021 07:00 PM UTC
OSU-190512, Dodd - Window Replacement
Removal and replacement of existing windows and interior sills on the first, second, third, fourth, and fifth floors. Work includes selective demolition and repair of interior partitions, sills, and soffits to accommodate new window systems and sills.
02/22/2021 07:00 PM UTC
OSU-200604, Wooster - Selby Hall Elevator Replacement
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
01/12/2021 07:00 PM UTC
OSU-170719, Canfield - Loading Dock
Canfield – Loading Dock The Work includes complete demolition of the existing loading dock service elevator, expansion of exterior loading dock area: to add ramp, widen stair, relocate existing dumpsters, and provide new screen walls to improve exterior aesthetics and wayfinding at Canfield Hall. Minor remodeling alterations of interior spaces include: widening of existing basement door, limited existing corridor finishes, and adding a second door to existing supply room located in the Basement Floor of the Canfield Hall, an existing residence hall at the Ohio State University, Columbus, Ohio.
01/06/2021 07:00 PM UTC
OSU-190126 Water Meter Installation FY2019
This project will install domestic cold water meters. Multiple locations on OSU Main Campus
01/05/2021 06:00 PM UTC
OSU-190221, 2001 Polaris - Roof Replacement P2
Work includes coating of metal roof panels and parapets along with miscellaneous exterior and interior work, located at 2001 Polaris Parkway, Columbus Ohio 43240.
12/17/2020 07:00 PM UTC
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
12/15/2020 07:00 PM UTC