General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230304 Converse Hall - Bathroom/Shower Renovation
Multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette. REBID
05/14/2024 06:00 PM UTC
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
05/15/2024 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-190132 Civic Space Improvements
This project will improve key gathering, social and study spaces
04/09/2019 06:00 PM UTC
OSU-180723, Bradley & Paterson - Entry Hardscape Improvements
This project removes existing improvements around the north entry for Bradley and Paterson Halls and installs new improvements including sidewalk, pavers, seating walls, stairs, seating, plantings, turf, drain basins, lighting modifications, and other restoration items required to complete the work.
04/04/2019 06:00 PM UTC
OSU-170816, Campbell - Teaching Kitchen Fire Suppression
OSU Main Campus: The project is a general demolition of an existing 700 plus square foot space previously utilized as a home economics type cooking space. The existing cabinets, ovens, dishwashers, garbage disposals are to be demolished and removed. All existing finishes including ceiling, flooring and walls are to be removed and replaced. The space is to be re-constructed with new casework into a demonstration type teaching kitchen. A new exhaust hood with fire suppression system is to be installed along with new MEP systems in the room as well as new exhaust equipment on the roof. Existing shafts are to be re-used for the exhaust system in the neighboring classroom. Work in the neighboring classroom will need to be completed around the scheduled classroom activities. All new kitchen equipment is to be provided and installed as part of this contract.
04/03/2019 06:00 PM UTC
OSU-160319, Rhodes - Bronchoscopy Procedure Rooms
RENOVATION OF 2,003 SF EXISTING 2ND FLOOR OF THE HOSPITAL. WORK INCLUDING DEMOLITION, FINISHES (FLOOR, ROOM BASE, PAINT, CEILINGS), RIGID PLASTIC WAINSCOT, CORNER GUARDS, STRUCTURAL AND RELATED MEP ITEMS. WORK ALSO INCLUDES NEW HVAC FOR BRONCH ROOMS.
03/28/2019 06:00 PM UTC
OSU-190063 Arwell Chiller Replacement
The Project consists of replacement of a nominal 350 ton water-cooled centrifugal chiller with a new unit of the same capacity. Existing pumps and cooling tower to remain. The University has pre-purchased the chiller for installation by the contractor. Project includes enlarging an existing wall opening to get new chiller into the Penthouse.
03/20/2019 06:00 PM UTC
OSU-190194, Drinko - Saxbe Auditorium Renovation
OSU Main Campus: Interior renovation of the existing auditorium to meet the current needs of the college. New seating, accessibility modifications, and revised mechanical, electrical, and technology systems associated with the renovation.
03/14/2019 06:00 PM UTC
OSU-180784, Lima - Campus Paving Improvements
OSU Lima: Replace Parking Lot C at OSU Lima Campus by process of reclaiming asphalt base. Alternate 1 will include full depth asphalt replacement in Parking Lot C in lieu of reclaiming asphalt base per base bid. Alternate 2 will include improvements to the Public Service Building Entry. Alternate 3 will include removal and replacement of the drive connecting Parking Lot C and Parking Lot A. Alternate 4 will include pavement repair in Parking Lot A.
03/05/2019 07:00 PM UTC
OSU-190144, Airport - North Runway Rehabilitation Phase 2
OSU Airport: The scope of work for the Base Bid includes items to reconstruct Runway 9L and 27R ends. The work associated with this bid includes, but is not limited to unclassified excavation, placement of crushed aggregate base course, placement of plant mix bituminous pavement, bituminous pavement removal, bituminous surface removal, temporary soil erosion control, permanent erosion control, installation of drainage structures and pipe, and mulched seeding. The scope of work for Alternate Bid 1 includes items required to repair Taxiway G. The work associated with the bid includes but is not limited to microsurfacing of Taxiway G. The scope of work for Alternate Bid 2 includes items required to rehabilitate Taxiway F. The work associated with the bid includes but is not limited to bituminous surface removal, pavement crack repair, placement of plant mix bituminous pavement, temporary soil erosion control, and mulched seeding.
03/01/2019 07:00 PM UTC
OSU-160935, Jameson Crane-Surgical Skills Lab-REBID
REBID: The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
02/26/2019 07:00 PM UTC
OSU-140056, Wooster Graduate House Phase 1
OSU Wooster: The Project consists of new construction of the Wooster Graduate House Phase 1. The building is two (2) stories above grade and a mechanical basement below grade. Site work and utilities to support the new construction are part of the project. The building consists of a ten (10) bedroom units, four (4) bathrooms, a laundry room, and common living space as well as the internal circulation needed to support the program.
02/22/2019 07:00 PM UTC
281 - 290 of 505 Solicitations
1 2 25 26 27 29 31 32 33 50 51