General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
08/13/2026 06:00 PM UTC
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM membrane. • Selective replacement of damaged, wet, or deteriorated insulations. • Replacement of edge metals. • Lightening protection replacement. • Fire alarm panel replacement. • Fire pump controller replacement (alternate)
08/19/2026 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
08/20/2026 06:00 PM UTC
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
08/20/2026 06:00 PM UTC
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
08/26/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
08/27/2026 06:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250061College Road Rebuild
The project includes reconstruction of College Road from 12th Avenue at the south through the Oval to the north, along with sidewalk, hardscape, lighting, and landscape improvements along both sides of College Road.
03/25/2026 06:00 PM UTC
OSU-250037 Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall.
03/04/2026 07:00 PM UTC
OSU-240504-4 - Airport - Taxiway G, Rehabilitation - Phase 1
This project includes the removal and full-depth replacement of a section of The Ohio State University Airport Taxiway G. This also includes shoulder adjustment and pavement markings.
02/27/2026 07:00 PM UTC
OSU-250308 Mershon Aud Smoke Evac Replacement
Replace existing roof-mounted, automatic smoke vent over stage
02/26/2026 07:00 PM UTC
OSU-230116 Herrick Drive Rebuild
This project is the full depth pavement reconstruction of John Herrick Drive from Olentangy River Road to Woody Hayes Drive. This project includes the construction of a 10’ shared use path, upgraded lighting, pedestrian signal modifications, pavement markings, and landscaping.
02/13/2026 07:00 PM UTC
OSU-240082, James - Pharmacy Administration Renovation (C150, C150A through C150F, C150X) REBID
The project is the renovation of an existing open office into enclosed office in the administrative suite. The area of construction is approximately 1,500 square feet. The work consists of the removal of flooring and ceiling grid and tiles and the associated fire protection, mechanical, and electrical systems. The new work will consist of creating eight private offices and two general work areas. The new work will entail new partitions, doors and frames, ceilings, finishes in the new OSUWMC finish standards, and the associated mechanical, electrical, and fire protection systems
02/12/2026 07:00 PM UTC
OSU-255191, Ross Cardiac Cath Lab #5 Renovation/Replacement
Renovation and equipment replacement of Cath Lab #5.
02/05/2026 07:00 PM UTC
21 - 30 of 631 Solicitations
1 3 5 6 7 8 9 63 64