General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
12/03/2025 07:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
12/10/2025 07:00 PM UTC
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/10/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-230844 - Newark - Evans Hall Renovation
This project includes additions and renovations for the COTC Public Training Facility. Renovations include new classrooms, office and restrooms, HVAC replacement, exterior wall enhancements, new doors and windows and new finishes throughout. Additions include a new secure entry vestibule. New parking and landscaping are included as part of the sitework.
08/07/2025 06:00 PM UTC
OSU 240639 Outpatient East New West Parking Lot Bid Package 1
This project will add a new parking lot to the west of the facility.
08/01/2025 06:00 PM UTC
OSU-230033, Marion - Various Campus Upgrades
OSU Marion Campus: Project consists of one-for-one replacement of two gas-fired boiler units and associated equipment on the third floor of Morrill Hall, a classroom and administrative building, on the Marion campus of The Ohio State University.
07/22/2025 06:00 PM UTC
OSU-240463, Mason Hall - 1st Floor Business Lab
Reconfiguration of existing offices and classrooms into a new classroom. Scope of work will include new partitions, new finishes, and adjustments to existing finishes. Removal of an existing connecting stair will require new structural steel framing and new concrete slab to close the existing opening. Existing sprinkler heads, fire alarm, mechanical devices, and electrical receptacles will be adjusted and modified to accommodate new uses.
07/17/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
06/17/2025 06:00 PM UTC
OSU-250017 - Newark - Lefevre Hall Chiller and Cooling Tower Replacement
This project will replace the existing water-cooled chiller with a new water-cooled chiller and replace the existing cooling tower
06/12/2025 06:00 PM UTC
OSU-250053 - Newark - Pavement Improvements
The project includes pavement mill & overlay to address deferred maintenance of shared parking lots and roadways throughout the college campus in Newark, Ohio.
05/27/2025 06:00 PM UTC
OSU-240400, Havener - Dublin Office Renovation REBID
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
05/23/2025 06:00 PM UTC
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001 Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
05/21/2025 06:00 PM UTC
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
05/20/2025 06:00 PM UTC
21 - 30 of 590 Solicitations
1 3 5 6 7 8 9 58 59