General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-200518, Doan-Exterior Brick Repair
OSU Main Campus: The project includes repairs to the exterior brick masonry façade at the east end of the north elevation of Doan Hall. The masonry repairs include the replacement of the through-wall flashing at shelf angles/lintels, isolated shelf angle replacement, brick masonry replacement at isolated distress, installation of brick masonry infill at former air conditioning units, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent. Additionally, the project includes installation of new storm windows at operable portions of the existing windows. The work is divided into 2 phases presented as follows: Base Bid – Phase 1: West Alternate 1 – Phase 2: Central
04/27/2021 06:00 PM UTC
OSU-200604, Wooster - Selby Hall Elevator Replacement (Rebid)
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
04/21/2021 06:00 PM UTC
OSU-200548, MMP Tower HVAC Plan - REBID
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
04/15/2021 06:00 PM UTC
OSU-200104 HVAC Replacements FY 2020
RPAC/PEAS/McCorkle: Update Siemens Controls Knowlton Hall: Update Siemens Controls Davis Heart and Lung: Delta Controls Replacements Parker Food Science and Technology: Delta Controls Replacements Veterinary Med Academic: Delta Controls Replacements Scott Laboratory: Delta Laboratory Controls Replacement
04/09/2021 05:00 PM UTC
OSU-200548, MMP Tower HVAC Plan
The project consists of finish refresh, minor alterations for accessibility improvements, and HVAC AHU replacement and controls updates for the 11th floor of the existing Martha Morehouse Outpatient Care Tower. The AHU serving this floor is in the 12th Floor Mechanical Penthouse.
03/26/2021 06:00 PM UTC
OSU-200101 West Campus Infrastructure Phase 1 BID PACKAGE 2
This project will provide infrastructure to support building projects in the west campus area, including WMC West Campus Ambulatory Facilities, Energy Advancement and Innovation Center, and the Interdisciplinary Research Facility. Improvements include additional vehicular lanes, modified/new intersection signalization, surface parking lots, and internal access roads. Utility work includes sanitary sewer, stormwater and water service extension.
03/26/2021 03:00 PM UTC
OSU-190877, Parks - Room 345 Renovation
OSU Main Campus: The project includes the renovation of Suite 335 and 345 in Parks Hall for the College of Pharmacy, approximately 3,400 square feet. The work includes selective interior demolition, abatement, and infrastructure demolition for the renovation of new research laboratories and support spaces. Scope of work includes new interior partitions, finishes, HVAC infrastructure upgrades, power/data distribution and lighting associated with the renovated spaces, new and modified plumbing associated with the renovated spaces.
03/23/2021 06:00 PM UTC
OSU-210094 Oxley's By The Numbers Plaza Phase 2
This project is the second phase of the plaza renovation.
03/11/2021 07:30 PM UTC
OSU- 190127 Water Meter Back Flow Preventerw Solicitation (24)
This project will install a back flow preventers at the two main City of Columbus domestic water meters. (1) Intersection of Lane and Olentangy River Road (2) Intersection of John Herrick Drive and Olentangy River Road
03/10/2021 07:30 PM UTC
OSU-190128 Envelope Modernization
This project will restore plazas and envelopes. McCorkle Aquatic Pavilion, Physical Activity and Education Services Recreation and Physical Activity Center
02/25/2021 07:00 PM UTC
291 - 300 of 617 Solicitations
1 2 26 27 28 30 32 33 34 61 62