General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/16/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/04/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-180764, Mansfield - Conard Hall Labs
OSU Mansfield Campus: Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
12/12/2019 07:00 PM UTC
OSU-190819, Rhodes - Room M212A MRI
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
12/04/2019 07:00 PM UTC
OSU-180712, University - Suites 247 and 250 Renovation (REBID)
REBID: The renovation of approximately 9,404 SF of office area on the 2nd Floor of University Hall located at 230 N. Oval Mall, in Columbus, Ohio. The project scope includes three (3) Office suites 247, 250 and 214. Flooring material, prep and installation will be through State Contract. Office/Conference glass entry fronts, by DIRTT, materials and installation will be through State Contract.
12/03/2019 07:00 PM UTC
OSU-120059 REBID Cannon Drive Relocation Phase 1 BP2 Entry
REBID This project will relocate Cannon Drive between King Ave and John Herrick Drive.
11/26/2019 07:00 PM UTC
OSU-190078, Central Service - Lock & Key Relocation (REBID)
(REBID) Columbus Campus: Development Lock Shop from the McCracken Power Plant to the basement of the Central Service Building 3,000 GSF. This move will include preparing the Central Service Building basement and first floor rooms 164, 164B, and 164C to be modified to accommodate the FOD Lock Shop’s user needs.
11/22/2019 07:00 PM UTC
OSU-180938, Baker Systems - Room 480 Renovation
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
11/19/2019 07:00 PM UTC
OSU-180712, University - Suites 247 and 250 Renovation
The renovation of approximately 9,404 SF of office area on the 2nd Floor of University Hall located at 230 N. Oval Mall, in Columbus, Ohio. The project scope includes three (3) Office suites 247, 250 and 214. Flooring material, prep and installation will be through State Contract. Office/Conference glass entry fronts, by DIRTT, materials and installation will be through State Contract.
11/08/2019 07:00 PM UTC
OSU-190304 Lima - Reed HVAC Upgrade (REBID)
(REBID) OSU Lima Campus: The project includes upgrades to the Reed Hall chilled water plant. The existing 150 ton water-cooled chiller and its associated chilled water pump, cooling tower, condenser water pump, and piping will be removed. The existing system will be replaced with a new air-cooled chiller, new primary and secondary chilled water pumps, and a new plate and frame heat exchanger.
11/07/2019 07:00 PM UTC
OSU-190121 Elevator Upgrade and Modernization FY 19
Elevator Modernization and related architectural and MEP scopes of work for a total of 7 elevators in 5 buildings on OSU’s Main Campus: Faculty Club/Animal Science Building/Meiling Hall /Rightmire Hall/Mendenhall Laboratory
11/05/2019 06:00 PM UTC
OSU-120059 Cannon Drive Relocation Phase 1 BP2 Entry
Construction of a new entry feature structure at the Cannon and King intersection on Ohio States Campus. The entry feature will be constructed of reinforced concrete, reinforced masonry, and brick veneer. Aesthetic caps, lighting, and plaques are also proposed.
11/01/2019 06:00 PM UTC
321 - 330 of 581 Solicitations
1 2 29 30 31 33 35 36 37 58 59