Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
12/03/2025 07:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
12/10/2025 07:00 PM UTC
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/10/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-170840, Dodd - Hospitality Center (REBID)
Renovation of an existing 1400 SF kitchen into a finishing kitchen including new finishes, new walls and doors, new lighting, modifications to HVAC, Plumbing, and FA, FS. Existing equipment will be relocated into a temporary swing space that is an existing Kitchen. Contractor to work with owner FS Vendor.
02/07/2020 07:00 PM UTC
OSU-160975
Electrical System Renewal, BP2 - This project will replace emergency egress lighting, receptacles, conduit and wire.
02/06/2020 06:00 PM UTC
OSU-190066 PH 2 BP 1
HVAC Replacements FY 2019 – Phase 2, Bid Package 1 This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
01/28/2020 06:00 PM UTC
OSU-190066 PH 2 BP 2
HVAC Replacements FY 2019 – Phase 2, Bid Package 2 This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
01/28/2020 06:00 PM UTC
OSU-160929, Lima - Standby Generators, BP#2
OSU Lima Campus: The project consists of providing a new generator and associated automatic transfer switch for the Perry Webb Student Life building. The project will include all plumbing and mechanical work required for the electrical scope to be completed.
01/27/2020 07:00 PM UTC
OSU-180785, Lima - Reed Restroom Renovation
Lima Campus: Renovation of two public restrooms adjacent to the theater lobby. The following items are a part of the restroom renovation within the scope of the project: provide accessible toilets, refresh interior finishes and design plumbing fixture replacement, update accessories and improve lighting.
01/21/2020 07:00 PM UTC
OSU-180764, Mansfield - Conard Hall Labs (REBID)
OSU Mansfield Campus: Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
01/15/2020 07:00 PM UTC
OSU-191003, Aero Research Ctr - Room 121 Electric
Provide and install a new electrical service for equipment testing. Service shall be 277/480V – 3000A.
01/14/2020 07:00 PM UTC
OSU-190291, Bolz - 4th Floor Renovation (REBID)
REBID: Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
01/06/2020 07:00 PM UTC
OSU-180764, Mansfield - Conard Hall Labs
OSU Mansfield Campus: Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
12/12/2019 07:00 PM UTC
321 - 330 of 590 Solicitations