General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-190008 Road and Bridge Improvements, FY19-Bid Package No-02
This project will mill and fill, and improve sidewalks and curbs
07/31/2020 06:30 PM UTC
OSU-190124
This project will replace fixtures, water piping inside the building and improve water service and the hot water source.
06/19/2020 05:00 PM UTC
OSU-190125 Electrical Renovation FY 2019
Bioscience: Replace (2) existing MCCs in the 10th floor mechanical penthouse with new MCCs and distribution panels in new locations. Provide code required separation of life safety and standby loads with new automatic transfer switch, manual transfer switch, and new panelboards. Derby Hall: Replace existing MCC with new MCC in same location in room 0010M. Dreese Lab: Replace (2) existing MCCs with new MCCs in same locations. (1) In room 036M & (1) in room 936M. Research Center: Replace (3) existing service entrance unit-substations with new service entrance rated double ended switchgear with tie breaker and (2) exterior primary transformers. Replace existing feeders and electrical distribution equipment throughout the building.
06/17/2020 05:00 PM UTC
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
06/08/2020 06:00 PM UTC
OSU-180729, Postle - Cafe
Two room, 715 SF Café located in Postle Hall on the Main campus of the Ohio State University. The project scope includes general construction, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, kitchen equipment, and finishes.
05/20/2020 06:00 PM UTC
OSU-190130
Envelope Renovation - This project will redesign the loading dock on the west elevation of the building.
05/15/2020 06:00 PM UTC
OSU-190120
Emergency Generator Renewal FY2019 Emergency generator replacement at Sisson and Wiseman Halls, diesel tank removal at Sisson Hall
05/08/2020 05:00 PM UTC
OSU-200457
Oxley’s By the Numbers Plaza - Renovation of Oxley plaza
05/07/2020 06:30 PM UTC
OSU-200101
Description West Campus Infrastructure Phase 1- Provide infrastructure to support west campus facilities.
04/01/2020 06:30 PM UTC
OSU-190129
HEATING HOT WATER RENOVATIONS RPAC Building This project will install new heat exchangers in RPAC, which supply heating hot water to RPAC, McCorkle, and PAES Buildings. Also included will be removal of condensate return pumps, new condensate transfer pump and flash tank, variable frequency drives for the existing primary pumps and DDC controls.
03/27/2020 06:00 PM UTC
321 - 330 of 617 Solicitations
1 2 29 30 31 33 35 36 37 61 62