The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190120
Emergency Generator Renewal FY2019 Emergency generator replacement at Sisson and Wiseman Halls, diesel tank removal at Sisson Hall
| 05/08/2020 05:00 PM UTC |
|
OSU-200457
Oxley’s By the Numbers Plaza - Renovation of Oxley plaza
| 05/07/2020 06:30 PM UTC |
|
OSU-200101
Description
West Campus Infrastructure Phase 1- Provide infrastructure to support west campus facilities.
| 04/01/2020 06:30 PM UTC |
|
OSU-190129
HEATING HOT WATER RENOVATIONS RPAC Building This project will install new heat exchangers in RPAC, which supply heating hot water to RPAC, McCorkle, and PAES Buildings. Also included will be removal of condensate return pumps, new condensate transfer pump and flash tank, variable frequency drives for the existing primary pumps and DDC controls.
| 03/27/2020 06:00 PM UTC |
|
OSU-190180, Morehouse Tower - 7th-8th Floor Updates
The project consists of renovating the 7th and 8th Floors of the Martha Morehouse Outpatient Care Tower, part of The Ohio State University Wexner Medical Center. The 7th Floor will be renovated in Phase 1, and the 8th Floor will be renovated in Phase 2. Existing finishes, fire protection, mechanicals, power and lighting will be modified in the areas of work. Additionally, a new air handling unit will be provided and installed in the mechanical room on each floor.
| 03/27/2020 06:00 PM UTC |
|
OSU-160978, Fire System Replacements Phase 2 (BP-02)
The work consists of the removal and replacement of existing fire alarm systems in Hayes Hall with new, addressable systems. Related work includes hazardous material abatement related directly to fire alarm installation, and patching/painting of walls at removed
equipment.
| 03/24/2020 05:00 PM UTC |
|
OSU-190980, 395 W 12th - 3rd Floor Renovation
The project will renovate 1,400 SF at the east end of the suite to provide a new Administration Wing and Chair’s Office, which will include relocating existing walls, minor HVAC, and relocating light fixtures. Additionally, the remainder of the floor, approximately 7,200 SF, will receive finish upgrades, including painting and flooring.
| 03/20/2020 06:00 PM UTC |
|
OSU-180800, Marion - Alber Student Center Renovation
OSU Marion Campus: Renovation of the Student Center at Marion Campus of The Ohio State University.
| 03/18/2020 06:00 PM UTC |
|
OSU-180803, Marion - Campus Building Envelope
OSU Marion Campus: Improvements to the Morrill Hall building envelope.
| 03/18/2020 05:00 PM UTC |
|
OSU-200028, Rhodes - Domestic Water Riser Replacement
This project includes the replacement of the domestic water risers from ground to 5th floors in Rhodes Hall.
| 03/17/2020 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.