The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
| 05/06/2026 06:00 PM UTC |
|
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
| 05/07/2026 06:00 PM UTC |
|
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
| 05/07/2026 06:00 PM UTC |
|
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
| 05/08/2026 06:00 PM UTC |
|
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space.
Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases.
A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
| 05/21/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190066 PH 2 BP 2
HVAC Replacements FY 2019 – Phase 2, Bid Package 2
This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
| 01/28/2020 06:00 PM UTC |
|
OSU-160929, Lima - Standby Generators, BP#2
OSU Lima Campus: The project consists of providing a new generator and associated automatic transfer switch for the Perry Webb Student Life building. The project will include all plumbing and mechanical work required for the electrical scope to be completed.
| 01/27/2020 07:00 PM UTC |
|
OSU-180785, Lima - Reed Restroom Renovation
Lima Campus: Renovation of two public restrooms adjacent to the theater lobby. The following items are a part of the restroom renovation within the scope of the project: provide accessible toilets, refresh interior finishes and design plumbing fixture replacement, update accessories and improve lighting.
| 01/21/2020 07:00 PM UTC |
|
OSU-180764, Mansfield - Conard Hall Labs (REBID)
OSU Mansfield Campus:
Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
| 01/15/2020 07:00 PM UTC |
|
OSU-191003, Aero Research Ctr - Room 121 Electric
Provide and install a new electrical service for equipment testing. Service shall be 277/480V – 3000A.
| 01/14/2020 07:00 PM UTC |
|
OSU-190291, Bolz - 4th Floor Renovation (REBID)
REBID: Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
| 01/06/2020 07:00 PM UTC |
|
OSU-180764, Mansfield - Conard Hall Labs
OSU Mansfield Campus:
Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
| 12/12/2019 07:00 PM UTC |
|
OSU-190819, Rhodes - Room M212A MRI
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
| 12/04/2019 07:00 PM UTC |
|
OSU-180712, University - Suites 247 and 250 Renovation (REBID)
REBID: The renovation of approximately 9,404 SF of office area on the 2nd Floor of University Hall located at 230 N. Oval Mall, in Columbus, Ohio. The project scope includes three (3) Office suites 247, 250 and 214. Flooring material, prep and installation will be through State Contract. Office/Conference glass entry fronts, by DIRTT, materials and installation will be through State Contract.
| 12/03/2019 07:00 PM UTC |
|
OSU-120059 REBID Cannon Drive Relocation Phase 1 BP2 Entry
REBID This project will relocate Cannon Drive between King Ave and John Herrick Drive.
| 11/26/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.