The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190291, Bolz - 4th Floor Renovation
Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
| 10/28/2019 06:00 PM UTC |
|
OSU-190221, 2001 Polaris - Roof Replacement
Work includes removal of existing roof top units, associated curbs, and associated utilities, and installation of metal roof panels and associated roof flashings where units have been removed, located at 2001 Polaris Parkway, Columbus Ohio 43240.
| 10/15/2019 06:00 PM UTC |
|
OSU-190029 Dreese - HVAC System
This project will remove the building chiller and connect the building to the chiller plant.
| 10/11/2019 05:00 PM UTC |
|
OSU-180783, Lima - Outdoor Lighting Upgrades
Lima Campus: The Project upgrades street, parking lot and pathway lighting as identified on the documents. The Project replaces and provides new poles/luminaries/pole bases based on Lima Campus standard Lithonia round steel poles and LED area luminaires.
| 10/04/2019 06:00 PM UTC |
|
OSU-190304, Lima - Reed HVAC Upgrade
OSU Lima Campus: The project includes upgrades to the Reed Hall chilled water plant. The existing 150 ton water-cooled chiller and its associated chilled water pump, cooling tower, condenser water pump, and piping will be removed. The existing system will be replaced with a new air-cooled chiller, new primary and secondary chilled water pumps, and a new plate and frame heat exchanger.
| 10/04/2019 05:00 PM UTC |
|
OSU-190620, Mount - Room 202 Glass Installation
The Ohio State University Main Campus. Demolition of existing curtain walls and install new insulated curtain walls, Franklin County, Ohio
| 09/27/2019 06:00 PM UTC |
|
OSU-190049, Newark - Pavement Renovations
Bid Package #2
Newark Campus: Pavement renovations includes the reconstruction of lot K, the relocation of lot K access drive, restriping, and lot K pavement marking reconfigurations of the Ohio State University and Central Ohio Technical College Newark Campus.
| 09/26/2019 06:00 PM UTC |
|
OSU-190192, Lincoln - 11th and 13th Office Renovation
Interior renovation of existing 11th and 13th floors of Lincoln Tower to create new offices suites for the departments of Hematology and Medical Oncology. Work will include interior demolition, interior partitions, casework, millwork, doors, finishes, fire protection, plumbing, HVAC, electrical and fire alarm scopes.
| 09/11/2019 06:00 PM UTC |
|
OSU-190371, MMPP - 3rd Floor Lobby and Clinical Spaces
Remodel 5,783 SF of existing interior space of the 32,820 SF existing 3rd Floor in the Martha Morehouse Pavilion building: Including the renovation of existing areas to create new office space, reception, and waiting area near elevator lobby. Work to include walls, doors, ceilings, finishes and related MEP items. A suite belonging to The Ohio State University.
| 08/26/2019 06:00 PM UTC |
|
OSU-190572, Case Road Animal Facility Relocation
Renovation and improvements of an existing metal storage building structure to house sheep and goats. Renovations include improvements to the existing building, a new Lab and Restroom. There is an alternate for a 1,650 SF mezzanine structure. There are allowances and unit pricing for limited existing metal roof and wall repairs. Existing gutters and downspouts will be removed and replaced. There is limited site and building plumbing work, limited HVAC and electrical work.
| 08/26/2019 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.