The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Project generally includes the removal and replacement of three underground storage tanks along with improvements to related equipment and infrastructure such as dispensers, concrete, canopies, etc…
| 10/15/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-180785, Lima - Reed Restroom Renovation
Lima Campus: Renovation of two public restrooms adjacent to the theater lobby. The following items are a part of the restroom renovation within the scope of the project: provide accessible toilets, refresh interior finishes and design plumbing fixture replacement, update accessories and improve lighting.
| 01/21/2020 07:00 PM UTC |
|
OSU-180764, Mansfield - Conard Hall Labs (REBID)
OSU Mansfield Campus:
Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
| 01/15/2020 07:00 PM UTC |
|
OSU-191003, Aero Research Ctr - Room 121 Electric
Provide and install a new electrical service for equipment testing. Service shall be 277/480V – 3000A.
| 01/14/2020 07:00 PM UTC |
|
OSU-190291, Bolz - 4th Floor Renovation (REBID)
REBID: Demolition of the interior portion of the 4th floor of Bolz Hall to allow for renovation of the space to include, open studio areas, offices, conference rooms, and Men’s and Women’s rooms. Also included is associated plumbing, HVAC, and electrical work.
| 01/06/2020 07:00 PM UTC |
|
OSU-180764, Mansfield - Conard Hall Labs
OSU Mansfield Campus:
Work includes renovation of Conard Hall. Work can be characterized best as “laboratory” renovations.
| 12/12/2019 07:00 PM UTC |
|
OSU-190819, Rhodes - Room M212A MRI
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
| 12/04/2019 07:00 PM UTC |
|
OSU-180712, University - Suites 247 and 250 Renovation (REBID)
REBID: The renovation of approximately 9,404 SF of office area on the 2nd Floor of University Hall located at 230 N. Oval Mall, in Columbus, Ohio. The project scope includes three (3) Office suites 247, 250 and 214. Flooring material, prep and installation will be through State Contract. Office/Conference glass entry fronts, by DIRTT, materials and installation will be through State Contract.
| 12/03/2019 07:00 PM UTC |
|
OSU-120059 REBID Cannon Drive Relocation Phase 1 BP2 Entry
REBID This project will relocate Cannon Drive between King Ave and John Herrick Drive.
| 11/26/2019 07:00 PM UTC |
|
OSU-190078, Central Service - Lock & Key Relocation (REBID)
(REBID) Columbus Campus: Development Lock Shop from the McCracken Power Plant to the basement of the Central Service Building 3,000 GSF. This move will include preparing the Central Service Building basement and first floor rooms 164, 164B, and 164C to be modified to accommodate the FOD Lock Shop’s user needs.
| 11/22/2019 07:00 PM UTC |
|
OSU-180938, Baker Systems - Room 480 Renovation
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
| 11/19/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.