General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-170509, Doan - Neurodiagnostics Renovation
Renovation of approximately 1,715 SF of office/exam area on the 8th Floor of Doan Hall located at 410 W 10th Avenue, in Columbus, Ohio. The project scope includes corridor X805C, Rooms 802, 804, 805, 806, 807 and 808, 808A, 810, and 810A. The new Office/Exam will contain the following areas: 3 Large Exam Rooms, 1 Small Treatment Room, Staff Area for 7 (to include small kitchenette, team space), Large Storage Room and Work Room (to store office supplies).
08/08/2019 06:00 PM UTC
OSU-180809, Doan - 6th and 7th Floor NICU
Doan - 6th & 7th Floor NICU Renovation of 7,150 square feet of the 54,297 square foot existing 6th Floor, and 3,170 square feet of the 30,465 square foot existing 7th Floor, of Doan Hall on The Ohio State University Medical Center Campus, including walls, doors, ceilings finishes, fire protection, plumbing, mechanical, electrical, data, and security work.
08/02/2019 06:00 PM UTC
OSU-190513, Vet Med Center - ER Expansion
The renovation of two small animal holding wards approximately 680 sf into a new emergency treatment and triage room. Project will install a new entry sliding door and door to dog run, new metal casework, and built ins for owner supplied equipment. New finishes include furred walls, soffits, resinous floor with integrated base and suspended ceiling. Building system alterations include lighting, new plumbing and modifications to the HVAC and medical air.
08/01/2019 06:00 PM UTC
OSU-190337, Wooster - Campus Parking Improvements
OSU Wooster Campus: Wooster Campus parking improvements project includes 3 priorities, or alternates. Priority #1 is the installation of a new 150 space parking lot and detention basin located just south of Fisher Auditorium. Priority #2 is to mill and fill the existing parking lot north of Fisher Auditorium between Campus Drive and Gerlaugh Drive. Priority #3 is the installation of a concrete sidewalk from the OARDC Administration building down to the intersection of SR 83 and Madison Ave.
07/23/2019 06:00 PM UTC
OSU-160980 Plumbing System Replacement BP 2
This project will replace deteriorating plumbing systems.
07/11/2019 05:00 PM UTC
OSU-180910, Child Care Center - Chiller Replacement
OSU Columbus Campus: Replace chiller, condenser, refrigerant piping and provide refrigerant alarm system and components.
06/06/2019 06:00 PM UTC
OSU-170318, Rhodes - ADA Restrooms
Renovation - 6 public / 12 patient restrooms and adjacent offices / storage spaces on Rhodes Hall floors 7, 9, 8, 10 and 11. Work is within The Ohio State University Wexner Medical Center.
06/04/2019 06:00 PM UTC
OSU-180168 - Ackerman Gateway
This project will establish upgrades to the intersection of Fred Taylor & Ackerman Rd.
05/16/2019 06:30 PM UTC
OSU-190183, Arps - Suite 172 Renovation
Columbus Campus: Work limited to suite entrances, four offices, conference room, reception, common area, copy room and storage areas on Arps Hall first floor. Work includes new partition walls, doors, ceilings, lighting and finishes.
05/08/2019 06:00 PM UTC
OSU-170840, Dodd - Hospitality Center
Renovation of a 1400 SF finishing kitchen including new finishes, new lighting, modifications to HVAC, Plumbing, and FA, FS. Electrical modifications to a swing space existing Kitchen to accommodate Owner Provided equipment.
04/30/2019 06:00 PM UTC
381 - 390 of 617 Solicitations
1 2 35 36 37 39 41 42 43 61 62