General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
12/03/2025 07:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
12/10/2025 07:00 PM UTC
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/10/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-170847 TNC Chiller Replacement
This project will replace the chiller.
01/10/2019 07:00 PM UTC
OSU-180524 Northwood & High Chiller Replacement BP 2
This project will install a new chiller on the roof.
01/10/2019 03:00 PM UTC
OSU-180360 Vet Med Center Fire Alarm Panel
Replace the (2) existing fire alarm systems in the building with (1) fire alarm system. The existing fire alarm systems are by different manufacturers and cause confusion during alarm. The existing fire alarm systems will be replaced in a manner that minimizes coverage outages, however, fire watch will be required and provided by the University. Existing device locations will generally be reused, and additional devices will be provided to meet current University standards and codes.
01/10/2019 03:00 PM UTC
OSU-160916, Wooster - Selby Hall Cabling
OSU Wooster Campus: The work consists of the removal and replacement of existing teledata cabling in Selby Hall. Related work includes limited hazardous material abatement, a new telecom room, and replacement of ACT tiles in the areas of work. The new telecom room will include HVAC, plumbing, power and lighting modifications required for the construction of this space.
12/17/2018 07:00 PM UTC
OSU-170847 TNC Chiller Repalcement
This project will replace the chiller.
12/12/2018 06:00 PM UTC
OSU-170535, Mansfield - Molyet Village Comm Bldg
One story wood frame 7,383 SF community building located near Molyet Village on the Mansfield campus of the Ohio State University. The project scope includes adjacent site area improvements, foundation and framing and exterior envelope, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, casework, finishes.
12/07/2018 06:00 PM UTC
OSU-160302-BP2 Rhodes - Public Restroom Renovation
Rhodes - Public Restroom Renovation 450 W 10th Avenue, This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
12/04/2018 07:00 PM UTC
OSU-180474, Rhodes-Doan, ORs and Scrub Rooms (REBID)
This project is a REBID. This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
11/28/2018 06:00 PM UTC
OSU-180474 Rhodes-Doan ORs and Scrub Rooms
This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
10/31/2018 05:00 PM UTC
OSU-180039, Ag Admin - Restroom Renovations (REBID)
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
10/30/2018 06:00 PM UTC
381 - 390 of 590 Solicitations
1 2 35 36 37 39 41 42 43 58 59