General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/16/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/04/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-180039, Ag Admin - Restroom Renovations (REBID)
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
10/30/2018 06:00 PM UTC
OSU-160975 Electrical System Renewal
Orton Hall: Project consists of replacing the existing service entrance switchboard with a new service entrance panelboard, replacing existing distribution panelboards and their feeders, and providing exterior egress lighting. Meiling Hall: Project consists of replacing the existing MCC with a new MCC of the same size, providing emergency egress lighting throughout the building via a new central battery inverter, and replacing existing exit signs and adding new exit signs.
10/11/2018 05:00 PM UTC
OSU-160418 Univeristy Hospital 4th Floor OR Upgrades
This Project will make various upgrades to the OR spaces on the 4th Floor including, repair at rated walls, new rated doors, replacement of ceilings, and sprinkler upgrades.
10/03/2018 05:00 PM UTC
OSU-160319 Rhodes - Bronchoscopy Procedure Rooms
This project will renovate rooms S247 and S251 into bronchoscopy procedure rooms.
08/30/2018 05:30 PM UTC
OSU-160978 Fire Alarm Replacements Phase 2
The work consists of the removal and replacement of existing fire alarm systems in 6 buildings (Agricultural Engineering Building, Evans Lab, Mershon Auditorium, Newman and Wolfrom Laboratory, Parks Hall and Rightmire Hall) with new, addressable systems. Related work includes hazardous material abatement, patching and painting of walls at removed equipment, and limited ceiling replacement
08/30/2018 05:00 PM UTC
OSU-180221, Drackett Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water converters with gas-fired water heaters and replacement of 2 heating water boilers on the 13th and 14th Floors of Drackett Tower. The work also includes replacement of 2 domestic water storage tanks, 2 existing cooling towers, and 6 heating water expansion tanks. A new domestic hot water thermostatic mixing valve will be installed for scald protection. The work will be done in phases for minimum impact to building operation.
08/29/2018 06:00 PM UTC
OSU-180526 33 W 11th - Chiller Replacement
This project will install a new chiller on the roof
08/23/2018 05:00 PM UTC
OSU-170213 - Doan Exterior Brick Repair
This project will repair the exterior brick and steel lintels.
08/16/2018 05:30 PM UTC
OSU-180039, Ag Admin - Restroom Renovations
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
07/31/2018 06:00 PM UTC
OSU-150403
University Hospital - Relocate Surgical Pathology Phase II
07/18/2018 05:30 PM UTC
381 - 390 of 581 Solicitations
1 2 35 36 37 39 41 42 43 58 59