General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230304 Converse Hall - Bathroom/Shower Renovation
Multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette. REBID
05/14/2024 06:00 PM UTC
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
05/15/2024 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-160936, Mansfield - Conard 2nd Floor Renovation
OSU Mansfield Campus: The work consists of the renovation of approximately 7000 square feet of teaching lab, lab prep, lab storage, research lab and lounge areas in the second floor of Conard Hall.
10/02/2017 05:00 PM UTC
OSU-160929, Lima - Standby Generators
OSU Lima Campus: This project consists of providing new generators, associated automatic transfer switches, and life safety system upgrades for Galvin Hall and the Student Services building. The project will include all plumbing work required for the electrical scope to be completed.
09/28/2017 06:00 PM UTC
OSU-160240 Building Identification Sign Replacement BP2
Bid Package No.2 Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents. Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass. Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape
09/26/2017 06:30 PM UTC
OSU-160911, CFAES Lab and Office Renovations
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
09/20/2017 06:00 PM UTC
OSU-160633 Taylor Tower - Boiler Replacements Bid Package 2
This project consists of the replacement of 2 domestic Hot Water Storage Tanks on the 14th floor of Jones Tower with 6 new tanks, and the installation of a new thermostatic mixing valve to limit domestic hot water supply temperature distributed to the building.
09/19/2017 06:00 PM UTC
OSU-160914, Wooster - Pounden FAHRP Discovery Theme Space
OSU-Wooster: The work includes but is not limited to the interior buildout of approximately 925 S.F. of existing shell space located in the first floor of Pounden hall into new research space. The project will include a larger lab and a smaller cell culture lab within the 925 S.F. space. The Work will include general trades, mechanical, electrical, plumbing, fire protection and communications work. The existing adjacent areas shall remain in operation throughout the Project.
09/13/2017 05:00 PM UTC
OSU-170173 1165 Kinnear - Staff Renovation
This project will relocate staff from the Laundry Building and Service Annex to 1165 Kinnear Rd.
09/07/2017 05:00 PM UTC
OSU-170505 James Room A014 ICC
This project will renovate the space to accommodate ICC.
08/25/2017 05:00 PM UTC
OSU-140073 REBID
Rhodes/Doan - 4th Floor OR Power Distribution - This project will evaluate power distribution in various ORs to identify areas to upgrade.
08/24/2017 06:00 PM UTC
OSU-160535 Doan Nuclear Medicine Renovation
This project will redesign and renovate the waiting room, injection rooms, radiopharmaceutical storage and clean supply storage areas on the second floor.
08/22/2017 06:00 PM UTC
381 - 390 of 505 Solicitations
1 2 35 36 37 39 41 42 43 50 51