General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 - Airport - Airfield Lighting Improvements REBID
BASE BID: This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building. ADDITIVE ALTERNATES: Three (3) additive alternates will be the rehabilitation of Taxiway A lighting, rehabilitation of Runway 9R-27L lighting, and replacement of priority 1 guidance signs.
06/22/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26 REBID
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
06/23/2026 06:00 PM UTC
OSU-230033, Marion - Various Campus Upgrades
Scope of work to include the removal of existing pedestrian bridge spanning campus pond with preparation for a future bridge, stabilization of campus pond partial shoreline, and Library/Classroom Building masonry repairs including replacement of window and door sealants and masonry cleaning and sealing of building exterior masonry.
06/25/2026 06:00 PM UTC
OSU-250283 BRT ULAR Cage Wash Environmental Improvements
BRT ULAR Cage Wash Environmental Improvements
07/08/2026 05:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-170509, Doan - Neurodiagnostics Renovation
Renovation of approximately 1,715 SF of office/exam area on the 8th Floor of Doan Hall located at 410 W 10th Avenue, in Columbus, Ohio. The project scope includes corridor X805C, Rooms 802, 804, 805, 806, 807 and 808, 808A, 810, and 810A. The new Office/Exam will contain the following areas: 3 Large Exam Rooms, 1 Small Treatment Room, Staff Area for 7 (to include small kitchenette, team space), Large Storage Room and Work Room (to store office supplies).
08/08/2019 06:00 PM UTC
OSU-180809, Doan - 6th and 7th Floor NICU
Doan - 6th & 7th Floor NICU Renovation of 7,150 square feet of the 54,297 square foot existing 6th Floor, and 3,170 square feet of the 30,465 square foot existing 7th Floor, of Doan Hall on The Ohio State University Medical Center Campus, including walls, doors, ceilings finishes, fire protection, plumbing, mechanical, electrical, data, and security work.
08/02/2019 06:00 PM UTC
OSU-190513, Vet Med Center - ER Expansion
The renovation of two small animal holding wards approximately 680 sf into a new emergency treatment and triage room. Project will install a new entry sliding door and door to dog run, new metal casework, and built ins for owner supplied equipment. New finishes include furred walls, soffits, resinous floor with integrated base and suspended ceiling. Building system alterations include lighting, new plumbing and modifications to the HVAC and medical air.
08/01/2019 06:00 PM UTC
OSU-190337, Wooster - Campus Parking Improvements
OSU Wooster Campus: Wooster Campus parking improvements project includes 3 priorities, or alternates. Priority #1 is the installation of a new 150 space parking lot and detention basin located just south of Fisher Auditorium. Priority #2 is to mill and fill the existing parking lot north of Fisher Auditorium between Campus Drive and Gerlaugh Drive. Priority #3 is the installation of a concrete sidewalk from the OARDC Administration building down to the intersection of SR 83 and Madison Ave.
07/23/2019 06:00 PM UTC
OSU-160980 Plumbing System Replacement BP 2
This project will replace deteriorating plumbing systems.
07/11/2019 05:00 PM UTC
OSU-180910, Child Care Center - Chiller Replacement
OSU Columbus Campus: Replace chiller, condenser, refrigerant piping and provide refrigerant alarm system and components.
06/06/2019 06:00 PM UTC
OSU-170318, Rhodes - ADA Restrooms
Renovation - 6 public / 12 patient restrooms and adjacent offices / storage spaces on Rhodes Hall floors 7, 9, 8, 10 and 11. Work is within The Ohio State University Wexner Medical Center.
06/04/2019 06:00 PM UTC
OSU-180168 - Ackerman Gateway
This project will establish upgrades to the intersection of Fred Taylor & Ackerman Rd.
05/16/2019 06:30 PM UTC
OSU-190183, Arps - Suite 172 Renovation
Columbus Campus: Work limited to suite entrances, four offices, conference room, reception, common area, copy room and storage areas on Arps Hall first floor. Work includes new partition walls, doors, ceilings, lighting and finishes.
05/08/2019 06:00 PM UTC
OSU-170840, Dodd - Hospitality Center
Renovation of a 1400 SF finishing kitchen including new finishes, new lighting, modifications to HVAC, Plumbing, and FA, FS. Electrical modifications to a swing space existing Kitchen to accommodate Owner Provided equipment.
04/30/2019 06:00 PM UTC
391 - 400 of 627 Solicitations
1 2 36 37 38 40 42 43 44 62 63