General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-160978 Fire Alarm Replacements Phase 2
The work consists of the removal and replacement of existing fire alarm systems in 6 buildings (Agricultural Engineering Building, Evans Lab, Mershon Auditorium, Newman and Wolfrom Laboratory, Parks Hall and Rightmire Hall) with new, addressable systems. Related work includes hazardous material abatement, patching and painting of walls at removed equipment, and limited ceiling replacement
08/30/2018 05:00 PM UTC
OSU-180221, Drackett Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water converters with gas-fired water heaters and replacement of 2 heating water boilers on the 13th and 14th Floors of Drackett Tower. The work also includes replacement of 2 domestic water storage tanks, 2 existing cooling towers, and 6 heating water expansion tanks. A new domestic hot water thermostatic mixing valve will be installed for scald protection. The work will be done in phases for minimum impact to building operation.
08/29/2018 06:00 PM UTC
OSU-180526 33 W 11th - Chiller Replacement
This project will install a new chiller on the roof
08/23/2018 05:00 PM UTC
OSU-170213 - Doan Exterior Brick Repair
This project will repair the exterior brick and steel lintels.
08/16/2018 05:30 PM UTC
OSU-180039, Ag Admin - Restroom Renovations
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
07/31/2018 06:00 PM UTC
OSU-150403
University Hospital - Relocate Surgical Pathology Phase II
07/18/2018 05:30 PM UTC
OSU-150572 Psychology - Envelope Repair
1835 Neil Avenue, Columbus Restore the original design intent of the exterior envelope of the Psychology Building by removing and reinstalling the existing Centria Insulated Metal Panel cladding. Prior to reinstalling, additional measures including, but not limited to, roofing termination repairs, firestopping repairs, and flashing and substrate modifications will be implemented to maintain the air and watertightness of the exterior envelope.
07/18/2018 05:00 PM UTC
OSU-170535, Mansfield - Molyet Village Comm Bldg
One story wood frame 7,583 SF community building located near Molyet Village on the Mansfield campus of The Ohio State University. The project scope includes adjacent site area improvements, foundation and framing and exterior envelope, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, casework, finishes.
07/11/2018 06:00 PM UTC
OSU-170533, Lincoln Tower 14th Floor Renovation (REBID)
Lincoln Tower 14th Floor Renovation REBID 1800 Cannon Drive, Columbus, OH 43210 Complete renovation of the 14th floor of Lincoln Tower.
06/29/2018 06:00 PM UTC
OSU-160010 - REBID Harding 5th Floor Renovations
The Ohio State University - Harding Hospital: This project will convert sapce on the fifth floor to private inpatient beds.
06/20/2018 06:00 PM UTC
421 - 430 of 617 Solicitations
1 2 39 40 41 43 45 46 47 61 62