General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/16/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/04/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-160162, Evans - Polymer Synthesis Facility
Main Campus: This project will convert Room 4073 of Evans Laboratory into a Polymer Synthesis Lab.
03/07/2018 07:00 PM UTC
OSU-170502 Arnoff - Hotwater Heater Replacement
Base Bid Work consists of replacement of two steam-fired domestic hot water heaters with two gas-fired domestic hot water heaters. This work shall be done without interrupting supply of domestic hot water to the building. Alternate 1 Work consists of providing a desuperheater system to cool superheated steam to saturated temperature for use in autoclaves and condensate pumps. This work shall be done with minimal interruption of steam supply.
03/01/2018 06:00 PM UTC
OSU-180054 Curl Hall - Patio Upgrades
The construction of an outdoor kitchen facility, overhead canopy and Food Service equipment.
02/23/2018 03:00 PM UTC
OSU-150661 Bolz-Central Svc-Window Replacement BP3 Converse Hall
OSU-150661 - Bolz-Central Svc-Window Replacement Bid Package No.3 Converse Hall The demolition and hazardous material abatement of the original steel and plate glass window system and wood window units on three levels. The replacement of windows units. System consists of clear glazing sections with single-hung vinyl windows. The temporary removal and reattachment of existing window treatments including blinds and shades. The patching of interior finishes adjacent the replacement window units including painting touch-up, aluminum break metal trim where applicable. Replacement of existing AC window Units with a standardized unit. Replacement of gutters and downspouts storm water drainage systems. Patching and painting of exterior parged concrete, CMU walls, hollow metal doors and frames, and woodwork.
02/21/2018 06:00 PM UTC
OSU-160890, Marion - Electrical, Lighting and HVAC Upgrades (Bid Package #2)
Marion Campus: This project consists of upgrading existing roadway, parking lot, walkway, building mounted, and landscape lighting on the OSU Marion / Marion Technical College Campus to new LED fixtures. This upgrade includes replacing some of the associated light poles as well as controlling all of the new pole mounted lights with the campus's existing lighting control system. The rest of the project scope includes the replacement of a boiler system at the Alber Student Center and the addition of a new air terminal unit (VAV box) at Bryson Hall, Room 199A.
02/14/2018 07:00 PM UTC
OSU-160889, Marion - Asphalt Repair and Replacement
Marion Campus: Repair and replacement of asphalt drives and parking areas throughout the Marion Campus. Alternate 1 will construct a bike path near University Drive and SR 95. Alternate 2 will repair the existing staff parking lot 4. Alternate 3 will remove and replace a portion of the campus loop on the west side. Alternate 4 will remove and replace a portion of the campus loop on the east side. Alternate 5 will construct a pedestrian bridge in the northeastern corner of campus. Alternate 6 will provide unit pricing for a 10’ long 10’ wide bike path. Alternate 7 will expand parking lot 3.
02/13/2018 07:00 PM UTC
OSU-170459 Morehouse Tower - Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
02/13/2018 07:00 PM UTC
OSU-170459 Morehouse Tower - Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
02/13/2018 05:00 AM UTC
OSU-170358, 2001 Polaris Parkway - Molecular Pathology
Build out of existing lab/support space for the 2 story property at 2001 Polaris Parkway, Columbus, OH 43240. First floor scope: Renovation of approximately 17,000 sf including Molecular Pathology Lab, offices and support spaces. Also included are locker/change room, kitchen/break room and minor restroom/shower upgrades. Second floor scope: Approximately 11,000 sf for a lactation room upgrade and new electrical drops for systems furniture to accommodate new workstations. Exterior work is limited to a new egress door in an existing storefront system and associated concrete pad.
02/09/2018 06:00 PM UTC
OSU-140075, Mansfield - Campus Roadway
OSU Mansfield Campus: Mansfield Campus Roadway including approximately 2328 LF of new entry drive, stormwater, shared use path, roadway lighting, traffic signal and other associated work.
02/08/2018 07:00 PM UTC
421 - 430 of 581 Solicitations
1 2 39 40 41 43 45 46 47 58 59