The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 12/02/2025 07:00 PM UTC |
|
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
| 12/03/2025 07:00 PM UTC |
|
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
| 12/10/2025 07:00 PM UTC |
|
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/10/2025 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-170651, McPherson - Lecture Hall Renovations
Renovation of lecture halls 1000 & 1015 of McPherson Chemical Laboratory. Work includes selective demolition, new walls, concrete and steel structures, doors, frames, and door hardware, finishes (including flooring, room base, paint, acoustical wall panels and acoustical ceilings), millwork, miscellaneous metals, glazing, mechanical, electrical and technology.
| 03/26/2018 06:00 PM UTC |
|
OSU-160933, Newark - Campus Infrastructure
Newark Campus: Project consists of the replacement of existing HSP roadway, parking lot and sidewalk light fixtures with new LED fixtures. The project also includes scope to provide natural gas emergency generator for Reese Center.
| 03/23/2018 06:00 PM UTC |
|
OSU-170882 Bevis - Boiler Replacement Phase 2
Bevis Hall Boiler Replacement Phase 2
| 03/23/2018 05:00 PM UTC |
|
OSU-170314, Faculty Club - Patio Restoration
Main Campus: Restore the Faculty Club patio with new concrete pavement, stone curb, lighting, fire pits, and landscaping. Alternate 1 will replace deteriorating stone steps and add a new handrail for the steps.
| 03/20/2018 06:00 PM UTC |
|
OSU-170534, Lincoln - Exterior Repairs
Exterior Concrete repairs; removal and replacement of existing concrete coating; removal and replacement of existing joint sealants; spot tuckpointing/repairs to masonry.
| 03/20/2018 02:00 PM UTC |
|
OSU-170752, WHAC - East Wing Renovation
Renovation of a portion of the existing building, construction of an addition, and expansion of the mezzanine into existing high volume spaces. Renovations will include protection, selective demolition, and new construction including but not limited to new structure, roof, walls, doors, finishes, casework, countertops, kitchen equipment, fire suppression, plumbing, fixtures, HVAC, exhaust, lighting, electrical, fire alarm, security and data.
| 03/14/2018 05:00 PM UTC |
|
OSU-170872, Morehouse Pavilion - First Floor MRI (REBID)
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
| 03/13/2018 06:00 PM UTC |
|
OSU-160805 Mendenhall-Indoor Air Quality Improvement
The project consists of the replacement of 27 existing fume hood exhaust fans with 6 new fume hood exhaust fans with high velocity discharge. Existing ductwork will be connected in manifolds to new fans. Existing motor starters will be replaced with new motor starters fed from existing electrical panels.
| 03/13/2018 05:00 PM UTC |
|
OSU-160420, WMC East - West 4th Fl Renovation (REBID 2)
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
Specific Project Experience Requirement: All bidders are required to have previous experience with ICU renovations. All contractors and sub-contractors shall be required to be fully badged prior to commencement of any work. All contractors are subject to rules and regulations set forth by the Wexner Medical Center Standards found in Division 1 of the project manual.
| 03/08/2018 06:00 PM UTC |
|
OSU-160162, Evans - Polymer Synthesis Facility
Main Campus: This project will convert Room 4073 of Evans Laboratory into a Polymer Synthesis Lab.
| 03/07/2018 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.