Upcoming Solicitations

Number Deadline
OSU-240504-2 - Airport - Airfield Lighting Improvements REBID
BASE BID: This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building. ADDITIVE ALTERNATES: Three (3) additive alternates will be the rehabilitation of Taxiway A lighting, rehabilitation of Runway 9R-27L lighting, and replacement of priority 1 guidance signs.
06/22/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26 REBID
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
06/23/2026 06:00 PM UTC
OSU-230033, Marion - Various Campus Upgrades
Scope of work to include the removal of existing pedestrian bridge spanning campus pond with preparation for a future bridge, stabilization of campus pond partial shoreline, and Library/Classroom Building masonry repairs including replacement of window and door sealants and masonry cleaning and sealing of building exterior masonry.
06/25/2026 06:00 PM UTC
OSU-250283 BRT ULAR Cage Wash Environmental Improvements
BRT ULAR Cage Wash Environmental Improvements
07/08/2026 05:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-160916, Wooster - Selby Hall Cabling
OSU Wooster Campus: The work consists of the removal and replacement of existing teledata cabling in Selby Hall. Related work includes limited hazardous material abatement, a new telecom room, and replacement of ACT tiles in the areas of work. The new telecom room will include HVAC, plumbing, power and lighting modifications required for the construction of this space.
12/17/2018 07:00 PM UTC
OSU-170847 TNC Chiller Repalcement
This project will replace the chiller.
12/12/2018 06:00 PM UTC
OSU-170535, Mansfield - Molyet Village Comm Bldg
One story wood frame 7,383 SF community building located near Molyet Village on the Mansfield campus of the Ohio State University. The project scope includes adjacent site area improvements, foundation and framing and exterior envelope, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, casework, finishes.
12/07/2018 06:00 PM UTC
OSU-160302-BP2 Rhodes - Public Restroom Renovation
Rhodes - Public Restroom Renovation 450 W 10th Avenue, This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
12/04/2018 07:00 PM UTC
OSU-180474, Rhodes-Doan, ORs and Scrub Rooms (REBID)
This project is a REBID. This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
11/28/2018 06:00 PM UTC
OSU-180474 Rhodes-Doan ORs and Scrub Rooms
This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
10/31/2018 05:00 PM UTC
OSU-180039, Ag Admin - Restroom Renovations (REBID)
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
10/30/2018 06:00 PM UTC
OSU-160975 Electrical System Renewal
Orton Hall: Project consists of replacing the existing service entrance switchboard with a new service entrance panelboard, replacing existing distribution panelboards and their feeders, and providing exterior egress lighting. Meiling Hall: Project consists of replacing the existing MCC with a new MCC of the same size, providing emergency egress lighting throughout the building via a new central battery inverter, and replacing existing exit signs and adding new exit signs.
10/11/2018 05:00 PM UTC
OSU-160418 Univeristy Hospital 4th Floor OR Upgrades
This Project will make various upgrades to the OR spaces on the 4th Floor including, repair at rated walls, new rated doors, replacement of ceilings, and sprinkler upgrades.
10/03/2018 05:00 PM UTC
OSU-160319 Rhodes - Bronchoscopy Procedure Rooms
This project will renovate rooms S247 and S251 into bronchoscopy procedure rooms.
08/30/2018 05:30 PM UTC
421 - 430 of 627 Solicitations