The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-230304 Converse Hall - Bathroom/Shower Renovation
Multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette. REBID
| 05/14/2024 06:00 PM UTC |
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
| 05/15/2024 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-160343 CarePoint Lewis Center
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine. Lewis Center, Ohio
| 02/07/2017 07:00 PM UTC |
OSU-160376 Ross – 4th Floor Hybrid Operating Room
This project will renovate the OR and replace imagine equipment to create a hybrid suite.
| 02/02/2017 07:00 PM UTC |
OSU-150403 University Hospitals Relocate Surgical Pathology
This project will relocate Surgical Pathology from 4 East to 5 East.
| 01/19/2017 07:00 PM UTC |
OSU-138009 Steam and Condinsate Distribution System Upgrades Phase 3 - BP3 Pomerene Tunnel
This project installs new waterline, replaces concrete trench, performs structural repairs, installs a concrete tunnel vault, replaces condensate piping and steam piping, installs chilled water supply and return piping, and completes other utility improvements to the Pomerene tunnel in the area from South Oval Drive to just north of 12th Avenue eastbound.
| 01/10/2017 06:00 PM UTC |
OSU-150011 Bricker Hall HVAC Repiar and Renovation BP1 Demolition
Bricker Hall 3rd Floor HVAC and ceiling removal. Install new ceiling and lights as well as demolition
| 12/22/2016 06:00 PM UTC |
OSU-150011 Bricker Hall HVAC Repair and Renovation - BP2 - HVAC
Bricker Hall HVAC Upgrades at 2nd and 3rd Floors. New associated electrical and finish upgrades
| 12/22/2016 06:00 PM UTC |
OSU-160397 Browning Amphitheater Restoration
Browning Amphitheater Restoration
| 12/21/2016 06:00 PM UTC |
OSU-150258 Utility Distribtuion System Renewal
Utility Distribution System Renewal
| 12/16/2016 06:00 PM UTC |
OSU-150194 Lincoln - Suite 220 Renovation
This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
| 12/15/2016 07:00 PM UTC |
OSU-160527 Parks Room 437 Renovation
Parks Hall - This project will renovate the lab including benches, faucets, fume hoods, flooring.
| 12/13/2016 07:00 PM UTC |