The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
| 10/16/2025 06:00 PM UTC |
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
| 10/16/2025 06:00 PM UTC |
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
| 10/22/2025 06:00 PM UTC |
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
| 10/24/2025 06:00 PM UTC |
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068.
This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
| 10/31/2025 06:00 PM UTC |
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
| 11/04/2025 07:00 PM UTC |
Number | Deadline |
---|---|
OSU-150010 Fire System Replacements, Cockins Hall 4th FL Renovation REBID
REBID OSU-150010 - The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
| 02/08/2018 07:00 PM UTC |
OSU-170578, Mirror Lake Cafe Upgrades
Interior Renovations to the existing Mirror Lake Cafe located in Pomerene Hall: BLDG # 067, 1760 Neil Ave., Columbus, Ohio 43210. Work consists of removal and replacement of casework and misc. finishes, limited new lighting and power, limited plumbing and electrical improvements. Walk-Through cooler.
| 02/06/2018 07:00 PM UTC |
OSU-170872, Morehouse Pavilion-First Floor MRI
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
| 02/01/2018 07:00 PM UTC |
OSU-160420, WMC East - West 4th Fl Renovation (REBID)
This project is a Re-Bid. Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
| 02/01/2018 06:00 PM UTC |
OSU-160892, Marion - Morrill Hall 3rd Floor Renovation
OSU Marion Campus: The project scope includes the renovation of the third floor of Marion-Morrill Hall. The peroject will renovate 19,100 SF for new faculty offices, classroom spaces, and student spaces. Existing partitions, doors, finishes, ceilings, and MEP systems will be removed.
| 01/31/2018 07:00 PM UTC |
OSU-170647, Rhodes - Room M212E Modifications
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
| 01/18/2018 07:00 PM UTC |
OSU-160147 James Door Operators
This project will reconfigure approximately 50 door operators that continue to function when the fire alarm system is activated.
| 01/16/2018 06:00 PM UTC |
OSU-170391 Transportation Plan Implementation BP6
This project installs a concrete entry drive connector from John H. Herrick Drive to the loading dock of Biomedical Research Tower. Concrete curb, pavement striping, partial free standing wall removal, modifications to wall face brick, tree relocation, turf restoration, and other restoration items are part of the work.
| 01/10/2018 07:00 PM UTC |
OSU-150010 Fire System Replacement BP2
OSU-150010 Fire System Replacement BP2 - Cockins Hall 4th Fl Renovation
The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in
the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for
support of a new fire-rated ceiling.
| 01/09/2018 08:00 PM UTC |
OSU-160285 Brain and Spine Hospital - 3rd Floor Renovation
This project will make several improvements on the 3rd floor including replacing door hardware; patch, repair and paint walls; upgrades to the staff lounge; cabinet repairs.
| 01/04/2018 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.