General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250012 - Fawcett Center - Walk-in Cooler Freezer Replacement
This project will replace the freezer and coolers on the first floor of the Fawcett Center.
08/21/2025 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima Campus: The Project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4276 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems
09/03/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-160010 Harding Hospital 5th Floor Renovations
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, wall demolition, new wall construction, mechanical, electrical, and plumbing work to accommodate new walls. Primary MEP systems are existing to remain.
12/19/2017 07:00 PM UTC
OSU-160420, WMC East - West 4th Fl Renovation
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
12/18/2017 06:00 PM UTC
OSU-170172 Morehouse Pavilion - 3rd Floor Neuro Clinic
This project will renovate space vacated by Sports Medicine on the third floor for the Neuro clinic, relocating from the seventh floor of the tower.
12/12/2017 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP1 - Postle Hall REBID
REBID - The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. Project includes hazardous materials abatement.
12/08/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation REBID
OSU Mansfield Campus: The work consists of the partial renovation of approximately 5,100 square feet of teaching and prep labs, including the addition of a new air handling unit serving these spaces and associated plumbing and electrical work
12/07/2017 07:00 PM UTC
OSU-170541, Enarson - 4th Floor Office
Enarson – 4th Floor Office. This project will renovate the office spaces of the 4th floor.
12/06/2017 06:00 PM UTC
OSU-170279, Baker Sys - AHU Replacement
Replacement of Air Handling Unit in Baker Systems Engineering Building.
11/29/2017 07:00 PM UTC
OSU-160245, Ross - ACC Exam Room Oxygen
OSU Ross Heart Hospital ACC Exam Room Oxygen Unit Interior Upgrades to plumbing med gas oxygen extensions as well as supportive work including: selective demolition, interior partition selective demolition, patch and repair, painting finishes, and electrical system limited outlets.
11/15/2017 06:00 PM UTC
OSU-160915, Wooster - Secrest Welcome Center
OSU Wooster Campus: The Project consists of an interior renovation and re-programming of the existing OARDC Operations and Maintenance Building into the Ohio State University Secrest Arboretum Welcome Center.
11/14/2017 07:00 PM UTC
OSU-160375, Doan - Room W293 Endoscopy Renovation
Renovation of existing Endoscopy Reprocessing Room to include replacement of existing pass throughs and scope cabinets, new equipment and sinks, new casework and finish upgrades. Wall modifications to the existing reprocessing Room and adjacent procedure rooms will be required. Modifications to multiple adjacent rooms adjacent to the Lab will be required to enable the renovation of the main endoscopy lab. The project will be constructed in multiple phases with an emphasis on sequence of events closely coordinated with hospital operation.
11/09/2017 07:00 PM UTC
431 - 440 of 570 Solicitations
1 2 40 41 42 44 46 47 48 56 57