Upcoming Solicitations

Number Deadline
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Project generally includes the removal and replacement of three underground storage tanks along with improvements to related equipment and infrastructure such as dispensers, concrete, canopies, etc…
10/15/2026 06:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-180070, 680 Ackerman - IHC/Histology Lab
Renovation of 680 Ackerman for the relocation of the OSU Wexner Medical Center IHC/Histology Lab.
02/20/2019 07:00 PM UTC
OSU-190049, Newark - Pavement Renovations
Newark Campus: Pavement renovations to include milling, resurface, reconstruction, restriping, and lot reconfigurations requiring new pavement of the Ohio State University and Central Ohio Technical College Newark Campus.
02/19/2019 07:00 PM UTC
OSU-130504, Ohio Union - Infrastructure Upgrades
Ohio Union Ballroom Floor renovation includes foundation modifications and new structural columns on the basement and ground floors respectively. Removal of existing acoustical and gypsum board soffits / ceilings including HVAC ductwork modifications, electrical rework, fire alarm and sprinkler piping modifications.
02/13/2019 07:00 PM UTC
OSU-180173 Building Envelope Renovation FY18
This project will replace or repair aging and/or failing elements of building envelope including windows, curtain walls, roofing, masonry, and water infiltration issues. Exact buildings will be determined during design.
01/22/2019 06:00 PM UTC
OSU-160935, Jameson Crane - Surgical Skills Lab
The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
01/17/2019 07:00 PM UTC
OSU-170847 TNC Chiller Replacement
This project will replace the chiller.
01/10/2019 07:00 PM UTC
OSU-180524 Northwood & High Chiller Replacement BP 2
This project will install a new chiller on the roof.
01/10/2019 03:00 PM UTC
OSU-180360 Vet Med Center Fire Alarm Panel
Replace the (2) existing fire alarm systems in the building with (1) fire alarm system. The existing fire alarm systems are by different manufacturers and cause confusion during alarm. The existing fire alarm systems will be replaced in a manner that minimizes coverage outages, however, fire watch will be required and provided by the University. Existing device locations will generally be reused, and additional devices will be provided to meet current University standards and codes.
01/10/2019 03:00 PM UTC
OSU-160916, Wooster - Selby Hall Cabling
OSU Wooster Campus: The work consists of the removal and replacement of existing teledata cabling in Selby Hall. Related work includes limited hazardous material abatement, a new telecom room, and replacement of ACT tiles in the areas of work. The new telecom room will include HVAC, plumbing, power and lighting modifications required for the construction of this space.
12/17/2018 07:00 PM UTC
OSU-170847 TNC Chiller Repalcement
This project will replace the chiller.
12/12/2018 06:00 PM UTC