The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-180039, Ag Admin - Restroom Renovations (REBID)
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
| 10/30/2018 06:00 PM UTC |
|
OSU-160975 Electrical System Renewal
Orton Hall: Project consists of replacing the existing service entrance switchboard with a new service entrance panelboard, replacing existing distribution panelboards and their feeders, and providing exterior egress lighting.
Meiling Hall: Project consists of replacing the existing MCC with a new MCC of the same size, providing emergency egress lighting throughout the building via a new central battery inverter, and replacing existing exit signs and adding new exit signs.
| 10/11/2018 05:00 PM UTC |
|
OSU-160418 Univeristy Hospital 4th Floor OR Upgrades
This Project will make various upgrades to the OR spaces on the 4th Floor including, repair at rated walls, new rated doors, replacement of ceilings, and sprinkler upgrades.
| 10/03/2018 05:00 PM UTC |
|
OSU-160319 Rhodes - Bronchoscopy Procedure Rooms
This project will renovate rooms S247 and S251 into bronchoscopy procedure rooms.
| 08/30/2018 05:30 PM UTC |
|
OSU-160978 Fire Alarm Replacements Phase 2
The work consists of the removal and replacement of existing fire alarm systems in 6 buildings (Agricultural Engineering Building, Evans Lab, Mershon Auditorium, Newman and Wolfrom Laboratory, Parks Hall and Rightmire Hall) with new, addressable systems. Related work includes hazardous material abatement, patching and painting of walls at removed equipment, and limited ceiling replacement
| 08/30/2018 05:00 PM UTC |
|
OSU-180221, Drackett Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water converters with gas-fired water heaters and replacement of 2 heating water boilers on the 13th and 14th Floors of Drackett Tower. The work also includes replacement of 2 domestic water storage tanks, 2 existing cooling towers, and 6 heating water expansion tanks. A new domestic hot water thermostatic mixing valve will be installed for scald protection. The work will be done in phases for minimum impact to building operation.
| 08/29/2018 06:00 PM UTC |
|
OSU-180526 33 W 11th - Chiller Replacement
This project will install a new chiller on the roof
| 08/23/2018 05:00 PM UTC |
|
OSU-170213 - Doan Exterior Brick Repair
This project will repair the exterior brick and steel lintels.
| 08/16/2018 05:30 PM UTC |
|
OSU-180039, Ag Admin - Restroom Renovations
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
| 07/31/2018 06:00 PM UTC |
|
OSU-150403
University Hospital - Relocate Surgical Pathology Phase II
| 07/18/2018 05:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.