General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/16/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/04/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-160830 Rhodes - Hybrid IR
Rhodes Hall - This project will combine rooms S268 and S264 and upgrade equipment to create an IR suite to accommodate multi-modality imaging.
12/20/2017 07:00 PM UTC
OSU-160010 Harding Hospital 5th Floor Renovations
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, wall demolition, new wall construction, mechanical, electrical, and plumbing work to accommodate new walls. Primary MEP systems are existing to remain.
12/19/2017 07:00 PM UTC
OSU-160420, WMC East - West 4th Fl Renovation
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
12/18/2017 06:00 PM UTC
OSU-170172 Morehouse Pavilion - 3rd Floor Neuro Clinic
This project will renovate space vacated by Sports Medicine on the third floor for the Neuro clinic, relocating from the seventh floor of the tower.
12/12/2017 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP1 - Postle Hall REBID
REBID - The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. Project includes hazardous materials abatement.
12/08/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation REBID
OSU Mansfield Campus: The work consists of the partial renovation of approximately 5,100 square feet of teaching and prep labs, including the addition of a new air handling unit serving these spaces and associated plumbing and electrical work
12/07/2017 07:00 PM UTC
OSU-170541, Enarson - 4th Floor Office
Enarson – 4th Floor Office. This project will renovate the office spaces of the 4th floor.
12/06/2017 06:00 PM UTC
OSU-170279, Baker Sys - AHU Replacement
Replacement of Air Handling Unit in Baker Systems Engineering Building.
11/29/2017 07:00 PM UTC
OSU-160245, Ross - ACC Exam Room Oxygen
OSU Ross Heart Hospital ACC Exam Room Oxygen Unit Interior Upgrades to plumbing med gas oxygen extensions as well as supportive work including: selective demolition, interior partition selective demolition, patch and repair, painting finishes, and electrical system limited outlets.
11/15/2017 06:00 PM UTC
OSU-160915, Wooster - Secrest Welcome Center
OSU Wooster Campus: The Project consists of an interior renovation and re-programming of the existing OARDC Operations and Maintenance Building into the Ohio State University Secrest Arboretum Welcome Center.
11/14/2017 07:00 PM UTC
441 - 450 of 581 Solicitations
1 2 41 42 43 45 47 48 49 58 59