General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230304 Converse Hall - Bathroom/Shower Renovation
Multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette. REBID
05/14/2024 06:00 PM UTC
OSU-220435 Scott Lab W363 Renovation
This project will address renovations to Scott Labs rooms W360 and W363 for use with hazardous gases. The renovation will include architectural renovations to provide a 1 hour “control area” for the researcher’s use. Modifications required include door and frame replacement, drywall, paint, and sealing modifications. Mechanically, the project will re-work exhaust devices in both rooms and add point-of-use snorkel exhaust.
05/15/2024 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSU-150189, Scott Lab-Instructional Lab
Ohio State University Main Campus. The Project renovates portions of the lower level, first and second floor of the west building of Scott Laboratory.
02/02/2016 06:00 PM UTC
OSU-160091, WHAC - Air Handler Replacement
This project will replace the air handler for the Woody Hayes Athletic Center.
01/13/2016 06:00 PM UTC
OSU-081056 South Campus Sewer Separation and Site Improvements REBID
REBID - construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
01/13/2016 06:00 PM UTC
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
12/10/2015 07:00 PM UTC
OSU-081049 Selected Tunnel Replacement Projects - BP2
This project will replace tunnel sections in order of priority as shown below. Phasing of each construction segment will be determined during the design stage. T-1 Beneath College Road between Page Hall and Hagerty Hall
12/04/2015 07:00 PM UTC
OSU-130331 University Hospitals East - Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions.
12/04/2015 06:30 PM UTC
TEST
This is a test.
12/02/2015 07:45 PM UTC
OSU-100652 Various Building Demolitions Phase 2
Demolition of up to five (05) buildings noted as KRC A, B, C, D, and E located at The Ohio State University Campus in Columbus, Ohio. Work includes abatement; complete removal of all foundations, footings, etc.; proper back-fill and compaction; adjustments to site lighting and site utilities; site grading and repair.
11/19/2015 03:00 PM UTC
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
11/12/2015 07:00 PM UTC
OSU-081056 South Campus Sewer Separation and Site Improvements
This is a continuation of the project approved in the 2007-2008 Capital Plan Process. The first phase is complete. The second phase will perform design and construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
11/03/2015 07:00 PM UTC
491 - 500 of 505 Solicitations
1 2 43 44 45 46 47 48 50