The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 12/02/2025 07:00 PM UTC |
|
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
| 12/03/2025 07:00 PM UTC |
|
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
| 12/10/2025 07:00 PM UTC |
|
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/10/2025 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-150009 Roof Repairs and Replacement Phase 2 (BP1)
Roof Repairs and Replacement Phase 1 (BP1)
Caldwell Lab 2024 Neil Ave, Columbus, Oh
Dreese Lab, 2015 Neil Ave, Columbus, Oh
| 04/05/2017 05:00 PM UTC |
|
OSU-150009 Roof Repairs and Replacement Phase 2 - (BP2)
OSU-150009 Roof Repairs and Replacements Phase 2 (BP2)
Drinko Hall 55 W 12th Avenue, Columbus, Oh
Graves Hall, 333 W 10th Avenue, Columbus, Oh
| 04/05/2017 05:00 PM UTC |
|
OSU-160664, NRDT - Clock Tower (Rebid)
This project will construct a clock tower in the North Residential district of main campus. The clock tower façade will mainly be brick and stone work. The work within the contract will include masonry, steel support, glazing, roofing, mechanical and electrical.
| 04/03/2017 06:00 PM UTC |
|
OSU-150679 300 W. 10th Ave - Rooms 440 and 422
This project will move medical gas booms and fully integrate with equipment and medical gas booms including new surgical lights and technology.
| 03/21/2017 06:00 PM UTC |
|
OSU-160299 Fawcett - East Wing Renovation
Fawcett - East Wing Renovation includes conference rooms and new SASSO office improvements on ground floor.
| 03/20/2017 06:00 PM UTC |
|
OSU-160664, NRDT - Clock Tower
This project will construct a clock tower in the North Residential district of main campus. The clock tower façade will mainly be brick and stone work. The work within the contract will include masonry, steel support, glazing, roofing, mechanical and electrical.
| 03/10/2017 07:00 PM UTC |
|
OSU-160890, Marion - Electrical, Lighting and HVAC Upgrades (Bid Package #1)
OSU Marion Campus: Phase 1 construction to replace the HVAC system in Rooms 190, 191, 193, 194, 196, 197, 199, 199A and the adjacent corridor in Bryson Hall.
| 03/03/2017 07:00 PM UTC |
|
OSU-160734 Goss - HVAC System
This project will repair/replace the HVAC system.
| 03/03/2017 06:00 PM UTC |
|
OSU-160927, Lima - Parking Lot Repairs
Renovations to Parking Lot D at the Ohio Lima Campus. Renovations will include removal and replacement of the asphalt pavement and parking lot lighting. Additional paving improvements will also be constructed around the proposed Student Life Building.
| 03/02/2017 07:00 PM UTC |
|
OSU-150026, Lima - HVAC Repair and Replacements
OSU Lima Campus: This project will include the removal of pneumatic control systems; installation of new DDC controls; updating of current constant volume air handling system; updating air boxes; and replacement of exhaust fans on Galvin Hall.
| 02/28/2017 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.