General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-140073 REBID
Rhodes/Doan - 4th Floor OR Power Distribution - This project will evaluate power distribution in various ORs to identify areas to upgrade.
08/24/2017 06:00 PM UTC
OSU-160535 Doan Nuclear Medicine Renovation
This project will redesign and renovate the waiting room, injection rooms, radiopharmaceutical storage and clean supply storage areas on the second floor.
08/22/2017 06:00 PM UTC
OSU-170391 Transportation Plan Implementation BP5
BP #5 includes construction of two new soccer fields adjacent to Carmack Road.
08/08/2017 06:30 PM UTC
OSU-160770
OSU Vet Hospital Simulation Lab - This project will renovate space to create a lab where students can practice techniques.
08/08/2017 06:00 PM UTC
OSU-120059 Cannon Drive Relocation - Phase 1
Cannon Drive Relocation - Phase 1
07/12/2017 06:30 PM UTC
OSU-160029 PAES - Sanitary Lift Station
PAES - Sanitary Lift Station
07/11/2017 06:00 PM UTC
OSU-160928, Lima - Reed Hall Roof Replacement
OSU Lima Campus: Project includes a complete tear-off of the roof membrane and insulation, down to metal deck of roof areas indicated and replacement with a new single-ply roof membrane and insulation. Project also includes limited masonry work at through wall flashings, lightning protection and limited fall protection.
07/06/2017 06:00 PM UTC
OSU-160969 Doan Public Elevators 4-7 REBID
This project will replace elevator controls and refurbish the cabs.
07/06/2017 06:00 PM UTC
OSU-140356 Mirror Lake Enhancements
Improvements associated with the Mirror Lake renovations, including planting, hardscape, lake edge adjustments, quick drain installation and historic grotto re-construction.
07/05/2017 03:00 PM UTC
OSU-170419 Rhodes-11W Observation Unit
OSU Rhodes 11W Observation Unit Interior Upgrades to include selective demolition, interior partitions and finishes, cabinetry and doors as well as supporting work on fire protection, plumbing, mechanical and electrical systems.
06/29/2017 06:00 PM UTC
501 - 510 of 617 Solicitations
1 2 47 48 49 51 53 54 55 61 62