General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/16/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/04/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-150026, Lima - HVAC Repair and Replacements
OSU Lima Campus: This project will include the removal of pneumatic control systems; installation of new DDC controls; updating of current constant volume air handling system; updating air boxes; and replacement of exhaust fans on Galvin Hall.
02/28/2017 08:00 PM UTC
OSU-160296 ATI - Residence Hall Demolition
The project consists of asbestos abatement at The Ohio State University-ATI Residence Hall, 1328 Dover Rd., Wooster, Ohio 44691; and demolition and disposal of the building and site improvements at the same location.
02/28/2017 07:00 PM UTC
OSU-160343 REBID Carepoint Lewis Center - 1st & 2nd Floor Office
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine.
02/24/2017 07:00 PM UTC
OSU-160464 Mack - Restroom Renovations
The project involves the demolition and renovation of residence rooms, bathrooms, and electrical branch service and wiring in the A and B wings wiring of Mack Hall. The completed design will be consistent with the previous renovation of the C and D wings in Mack Hall that were completed in 2009.
02/24/2017 03:00 PM UTC
OSU-160657 Ackerman – Chilled Water and Boiler
This project will install a boiler plant including pumping system and DDC controls and install a chilled water plant.
02/23/2017 07:00 PM UTC
OSU-160422 UH East Elevator 10-11 Modernization
This project will renovate two elevators UH East 181 Taylor Avenue Columbus OH 43203
02/21/2017 07:00 PM UTC
OSU-160343 CarePoint Lewis Center
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine. Lewis Center, Ohio
02/07/2017 07:00 PM UTC
OSU-160376 Ross – 4th Floor Hybrid Operating Room
This project will renovate the OR and replace imagine equipment to create a hybrid suite.
02/02/2017 07:00 PM UTC
OSU-150403 University Hospitals Relocate Surgical Pathology
This project will relocate Surgical Pathology from 4 East to 5 East.
01/19/2017 07:00 PM UTC
OSU-138009 Steam and Condinsate Distribution System Upgrades Phase 3 - BP3 Pomerene Tunnel
This project installs new waterline, replaces concrete trench, performs structural repairs, installs a concrete tunnel vault, replaces condensate piping and steam piping, installs chilled water supply and return piping, and completes other utility improvements to the Pomerene tunnel in the area from South Oval Drive to just north of 12th Avenue eastbound.
01/10/2017 06:00 PM UTC
501 - 510 of 581 Solicitations
1 2 47 48 49 51 53 54 55 58 59