The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-160375, Doan - Room W293 Endoscopy Renovation
Renovation of existing Endoscopy Reprocessing Room to include replacement of existing pass throughs and scope cabinets, new equipment and sinks, new casework and finish upgrades. Wall modifications to the existing reprocessing Room and adjacent procedure rooms will be required. Modifications to multiple adjacent rooms adjacent to the Lab will be required to enable the renovation of the main endoscopy lab. The project will be constructed in multiple phases with an emphasis on sequence of events closely coordinated with hospital operation.
| 11/09/2017 07:00 PM UTC |
|
OSU-150015 Plumbing Repair - RPAC Steam and Hot Water
Plumbing Repairs - RPAC Steam and Hot Water
| 11/01/2017 07:00 PM UTC |
|
OSU-160911, CFAES Lab and Office Renovations (Rebid)
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
| 11/01/2017 06:00 PM UTC |
|
OSU-160980 Plumbing System Replacement
The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. The project includes abatement of hazardous material
| 10/20/2017 05:00 PM UTC |
|
OSU-160976 Elevator Safety Repairs and Replacements Phase 2
Elevator Modernization and related architectural and MEP scopes of work for a total of 8 elevators in 6 buildings on OSU’s Main Campus:
Newton Hall Journalism Building
33 W. 11th Ave. Enarson Hall
Arps Hall Drinko Hall
| 10/17/2017 06:00 PM UTC |
|
OSU-160774 Drackett - Corridor Ceilings (RE-BID)
Installation of lay-in ceiling system and lights.
| 10/13/2017 06:00 PM UTC |
|
OSU-160936, Mansfield - Conard 2nd Floor Renovation
OSU Mansfield Campus: The work consists of the renovation of approximately 7000 square feet of teaching lab, lab prep, lab storage, research lab and lounge areas in the second floor of Conard Hall.
| 10/02/2017 05:00 PM UTC |
|
OSU-160929, Lima - Standby Generators
OSU Lima Campus: This project consists of providing new generators, associated automatic transfer switches, and life safety system upgrades for Galvin Hall and the Student Services building. The project will include all plumbing work required for the electrical scope to be completed.
| 09/28/2017 06:00 PM UTC |
|
OSU-160240 Building Identification Sign Replacement BP2
Bid Package No.2
Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents.
Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass.
Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape
| 09/26/2017 06:30 PM UTC |
|
OSU-160911, CFAES Lab and Office Renovations
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
| 09/20/2017 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.