General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement
Replacement of (2) air-cooled, low-temperature glycol chillers and associated piping, electrical, structural, controls, and rigging work at Ross Heart Hospital. Includes bid alternates for construction phasing, control valves, AHU sensors, and access platforms.
11/18/2026 07:00 PM UTC
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466 SF of the 4th floor including minor demolition, construction of new interior partitions, new ceiling grid and tile, new doors, new finishes, associated mechanical, electrical, plumbing and fire protection work. An accessible restroom is being added to the floor. A break area will also be added with associated plumbing, casework and fixtures.
11/19/2026 07:00 PM UTC
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing imaging room at the James Cancer Center. The scope includes new conduit pathways, power, floor CT rails, ceiling coordination, process chilled water and other infrastructure to support the new equipment.
11/20/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OSU-150010 Fire System Replacements, Cockins Hall 4th FL Renovation REBID
REBID OSU-150010 - The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
02/08/2018 07:00 PM UTC
OSU-170578, Mirror Lake Cafe Upgrades
Interior Renovations to the existing Mirror Lake Cafe located in Pomerene Hall: BLDG # 067, 1760 Neil Ave., Columbus, Ohio 43210. Work consists of removal and replacement of casework and misc. finishes, limited new lighting and power, limited plumbing and electrical improvements. Walk-Through cooler.
02/06/2018 07:00 PM UTC
OSU-170872, Morehouse Pavilion-First Floor MRI
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.
02/01/2018 07:00 PM UTC
OSU-160420, WMC East - West 4th Fl Renovation (REBID)
This project is a Re-Bid. Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
02/01/2018 06:00 PM UTC
OSU-160892, Marion - Morrill Hall 3rd Floor Renovation
OSU Marion Campus: The project scope includes the renovation of the third floor of Marion-Morrill Hall. The peroject will renovate 19,100 SF for new faculty offices, classroom spaces, and student spaces. Existing partitions, doors, finishes, ceilings, and MEP systems will be removed.
01/31/2018 07:00 PM UTC
OSU-170647, Rhodes - Room M212E Modifications
Renovation of existing MRI room. Project includes replacing existing MRI equipment with new through a removable access panel in the existing exterior wall, room finish upgrades, and repair/modifications to the existing RF shielding to coordinate with new equipment.
01/18/2018 07:00 PM UTC
OSU-160147 James Door Operators
This project will reconfigure approximately 50 door operators that continue to function when the fire alarm system is activated.
01/16/2018 06:00 PM UTC
OSU-170391 Transportation Plan Implementation BP6
This project installs a concrete entry drive connector from John H. Herrick Drive to the loading dock of Biomedical Research Tower. Concrete curb, pavement striping, partial free standing wall removal, modifications to wall face brick, tree relocation, turf restoration, and other restoration items are part of the work.
01/10/2018 07:00 PM UTC
OSU-150010 Fire System Replacement BP2
OSU-150010 Fire System Replacement BP2 - Cockins Hall 4th Fl Renovation The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
01/09/2018 08:00 PM UTC
OSU-160285 Brain and Spine Hospital - 3rd Floor Renovation
This project will make several improvements on the 3rd floor including replacing door hardware; patch, repair and paint walls; upgrades to the staff lounge; cabinet repairs.
01/04/2018 07:00 PM UTC
501 - 510 of 651 Solicitations
1 2 … 47 48 49 51 53 54 55 … 65 66