General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
12/03/2025 07:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
12/10/2025 07:00 PM UTC
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/10/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-160296 ATI - Residence Hall Demolition
The project consists of asbestos abatement at The Ohio State University-ATI Residence Hall, 1328 Dover Rd., Wooster, Ohio 44691; and demolition and disposal of the building and site improvements at the same location.
02/28/2017 07:00 PM UTC
OSU-160343 REBID Carepoint Lewis Center - 1st & 2nd Floor Office
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine.
02/24/2017 07:00 PM UTC
OSU-160464 Mack - Restroom Renovations
The project involves the demolition and renovation of residence rooms, bathrooms, and electrical branch service and wiring in the A and B wings wiring of Mack Hall. The completed design will be consistent with the previous renovation of the C and D wings in Mack Hall that were completed in 2009.
02/24/2017 03:00 PM UTC
OSU-160657 Ackerman – Chilled Water and Boiler
This project will install a boiler plant including pumping system and DDC controls and install a chilled water plant.
02/23/2017 07:00 PM UTC
OSU-160422 UH East Elevator 10-11 Modernization
This project will renovate two elevators UH East 181 Taylor Avenue Columbus OH 43203
02/21/2017 07:00 PM UTC
OSU-160343 CarePoint Lewis Center
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine. Lewis Center, Ohio
02/07/2017 07:00 PM UTC
OSU-160376 Ross – 4th Floor Hybrid Operating Room
This project will renovate the OR and replace imagine equipment to create a hybrid suite.
02/02/2017 07:00 PM UTC
OSU-150403 University Hospitals Relocate Surgical Pathology
This project will relocate Surgical Pathology from 4 East to 5 East.
01/19/2017 07:00 PM UTC
OSU-138009 Steam and Condinsate Distribution System Upgrades Phase 3 - BP3 Pomerene Tunnel
This project installs new waterline, replaces concrete trench, performs structural repairs, installs a concrete tunnel vault, replaces condensate piping and steam piping, installs chilled water supply and return piping, and completes other utility improvements to the Pomerene tunnel in the area from South Oval Drive to just north of 12th Avenue eastbound.
01/10/2017 06:00 PM UTC
OSU-150011 Bricker Hall HVAC Repiar and Renovation BP1 Demolition
Bricker Hall 3rd Floor HVAC and ceiling removal. Install new ceiling and lights as well as demolition
12/22/2016 06:00 PM UTC
511 - 520 of 590 Solicitations
1 2 48 49 50 52 54 55 56 57 58 59