OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-160928, Lima - Reed Hall Roof Replacement
OSU Lima Campus: Project includes a complete tear-off of the roof membrane and insulation, down to metal deck of roof areas indicated and replacement with a new single-ply roof membrane and insulation. Project also includes limited masonry work at through wall flashings, lightning protection and limited fall protection.
| 07/06/2017 06:00 PM UTC |
|
OSU-160969 Doan Public Elevators 4-7 REBID
This project will replace elevator controls and refurbish the cabs.
| 07/06/2017 06:00 PM UTC |
|
OSU-140356 Mirror Lake Enhancements
Improvements associated with the Mirror Lake renovations, including planting, hardscape, lake edge adjustments, quick drain installation and historic grotto re-construction.
| 07/05/2017 03:00 PM UTC |
|
OSU-170419 Rhodes-11W Observation Unit
OSU Rhodes 11W Observation Unit Interior Upgrades to include selective demolition, interior partitions and finishes, cabinetry and doors as well as supporting work on fire protection, plumbing, mechanical and electrical systems.
| 06/29/2017 06:00 PM UTC |
|
OSU-170011 Fry Hall Optometry Clinic Entrance
This project will renovate the entrance, both inside and out,
of the clinic in Fry Hall. The project includes spaces in the
basement and first floor of the original portion of the
building.
| 06/28/2017 06:00 PM UTC |
|
OSU-140073 Rhodes/Doan 4th Floor OR Power Distribution
This project will evaluate power distribution in various ORs to identify areas to upgrade.
| 06/22/2017 06:00 PM UTC |
|
OSU-160969 Doan - Public Elevators 4-7
This project will replace elevator controls and refurbish the cabs.
| 06/13/2017 06:00 PM UTC |
|
OSU-170391 Transportation Implementation Plan BP4 - Corrections Lot
This project installs new asphalt parking lot, screening fence, plantings, and completes other improvements to the area south of the Biological Sciences Building and north of 12th Avenue.
| 06/07/2017 05:00 PM UTC |
|
OSU-170240 Tuttle Garage - Oxley 2 Upgrades
This project is an interior renovation of a portion of the interior tenant space on the east side of the first floor of the Tuttle Parking Garage. Renovation includes rework of current layout, including alarm system, and new finishes. The new space is designed to be a grab-and-go dining facility for guests.
| 05/26/2017 02:00 PM UTC |
|
OSU-150679, 300 W. 10th-Rooms 440 and 442 REBID
Renovation of three operating room suites. Upgrades
include wall finishes, replacing existing ceramic tile with full height wall protection, and electrical work. New ceiling hung medical booms are planned to replace the existing including medical gases, electrical and structural work. New AV pathways will be provided for new equipment. Sprinkler and fire alarm work will be required for renovation work. Provide CO2 in ORs and tie into existing manifold in Rhodes/Doan Hall.
| 05/25/2017 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.