General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement
Replacement of (2) air-cooled, low-temperature glycol chillers and associated piping, electrical, structural, controls, and rigging work at Ross Heart Hospital. Includes bid alternates for construction phasing, control valves, AHU sensors, and access platforms.
11/18/2026 07:00 PM UTC
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466 SF of the 4th floor including minor demolition, construction of new interior partitions, new ceiling grid and tile, new doors, new finishes, associated mechanical, electrical, plumbing and fire protection work. An accessible restroom is being added to the floor. A break area will also be added with associated plumbing, casework and fixtures.
11/19/2026 07:00 PM UTC
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing imaging room at the James Cancer Center. The scope includes new conduit pathways, power, floor CT rails, ceiling coordination, process chilled water and other infrastructure to support the new equipment.
11/20/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OSU-160375, Doan - Room W293 Endoscopy Renovation
Renovation of existing Endoscopy Reprocessing Room to include replacement of existing pass throughs and scope cabinets, new equipment and sinks, new casework and finish upgrades. Wall modifications to the existing reprocessing Room and adjacent procedure rooms will be required. Modifications to multiple adjacent rooms adjacent to the Lab will be required to enable the renovation of the main endoscopy lab. The project will be constructed in multiple phases with an emphasis on sequence of events closely coordinated with hospital operation.
11/09/2017 07:00 PM UTC
OSU-150015 Plumbing Repair - RPAC Steam and Hot Water
Plumbing Repairs - RPAC Steam and Hot Water
11/01/2017 07:00 PM UTC
OSU-160911, CFAES Lab and Office Renovations (Rebid)
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
11/01/2017 06:00 PM UTC
OSU-160980 Plumbing System Replacement
The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. The project includes abatement of hazardous material
10/20/2017 05:00 PM UTC
OSU-160976 Elevator Safety Repairs and Replacements Phase 2
Elevator Modernization and related architectural and MEP scopes of work for a total of 8 elevators in 6 buildings on OSU’s Main Campus: Newton Hall Journalism Building 33 W. 11th Ave. Enarson Hall Arps Hall Drinko Hall
10/17/2017 06:00 PM UTC
OSU-160774 Drackett - Corridor Ceilings (RE-BID)
Installation of lay-in ceiling system and lights.
10/13/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation
OSU Mansfield Campus: The work consists of the renovation of approximately 7000 square feet of teaching lab, lab prep, lab storage, research lab and lounge areas in the second floor of Conard Hall.
10/02/2017 05:00 PM UTC
OSU-160929, Lima - Standby Generators
OSU Lima Campus: This project consists of providing new generators, associated automatic transfer switches, and life safety system upgrades for Galvin Hall and the Student Services building. The project will include all plumbing work required for the electrical scope to be completed.
09/28/2017 06:00 PM UTC
OSU-160240 Building Identification Sign Replacement BP2
Bid Package No.2 Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents. Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass. Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape
09/26/2017 06:30 PM UTC
OSU-160911, CFAES Lab and Office Renovations
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
09/20/2017 06:00 PM UTC
521 - 530 of 651 Solicitations
1 2 … 49 50 51 53 55 56 57 … 65 66