General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
12/03/2025 07:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
12/10/2025 07:00 PM UTC
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/10/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-150011 Bricker Hall HVAC Repair and Renovation - BP2 - HVAC
Bricker Hall HVAC Upgrades at 2nd and 3rd Floors. New associated electrical and finish upgrades
12/22/2016 06:00 PM UTC
OSU-160397 Browning Amphitheater Restoration
Browning Amphitheater Restoration
12/21/2016 06:00 PM UTC
OSU-150258 Utility Distribtuion System Renewal
Utility Distribution System Renewal
12/16/2016 06:00 PM UTC
OSU-150194 Lincoln - Suite 220 Renovation
This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
12/15/2016 07:00 PM UTC
OSU-160527 Parks Room 437 Renovation
Parks Hall - This project will renovate the lab including benches, faucets, fume hoods, flooring.
12/13/2016 07:00 PM UTC
OSU-150661 Bolz-Central Svc-Window Replacement, BP2
Aluminum window replacement of approximately 50 existing masonry openings. Entrance door replacement of 3 exterior doors.
12/13/2016 06:00 PM UTC
OSU-160302 Rhodes Public Restroom
This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
11/28/2016 04:00 PM UTC
OSU-160938 Vet Med Surgical Suite Renovation
This project will renovate surgery and IT facilities to accommodate expansion.
11/28/2016 04:00 PM UTC
OSU-160422 UH East – Elevator 10-11 Modernization
This project will modify the two elevators.
11/22/2016 07:00 PM UTC
OSU-160298 Fawcett Center - Lobby Cafe
Renovation of the Fawcett Center lobby for the construction of a new café and seating area.
10/31/2016 06:00 PM UTC
521 - 530 of 590 Solicitations
1 2 49 50 51 53 55 56 57 58 59