Number Deadline
OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement
Replacement of (2) air-cooled, low-temperature glycol chillers and associated piping, electrical, structural, controls, and rigging work at Ross Heart Hospital. Includes bid alternates for construction phasing, control valves, AHU sensors, and access platforms.
11/18/2026 07:00 PM UTC
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466 SF of the 4th floor including minor demolition, construction of new interior partitions, new ceiling grid and tile, new doors, new finishes, associated mechanical, electrical, plumbing and fire protection work. An accessible restroom is being added to the floor. A break area will also be added with associated plumbing, casework and fixtures.
11/19/2026 07:00 PM UTC
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing imaging room at the James Cancer Center. The scope includes new conduit pathways, power, floor CT rails, ceiling coordination, process chilled water and other infrastructure to support the new equipment.
11/20/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OSU-160981 Road and Bridge Improvements Phase 2
This project will rehabilitate deteriorated drainage, driving surface and curbs
05/22/2017 06:00 PM UTC
OSU-160774 Drackett - Corridor Ceilings
Installation of lay-in ceiling system and lights.
05/18/2017 06:00 PM UTC
OSU-160559 Schottenstein - Suite Improvements
Interior finishes improvements to fifty (50) suites at The Ohio State University Schottenstein Arena.
05/09/2017 06:00 PM UTC
OSU-160380 BP2 Wexner Medical Center 72 Bed Build Out
The Work includes the completion of shelled spaces on the 10th and 12th floors of the James Cancer Hospital and Solove Research Institute. The total area of the project includes approximately 24,500 square feet on the 10th Floor, and 54,000 square feet on the 12th Floor. This project will be registered with USGBC for a minimum Silver LEED certification. The Work includes, but is not limited to interior architecture, plumbing, mechanical, electrical and fire protection systems.
05/02/2017 05:00 PM UTC
OSU-170391, Transportation Plan Implementation - Bid Package #2
OSU Main Campus: Parking lot and transportation system improvements. This work includes roadway, sidewalks, curbs, and parking lots.
04/26/2017 06:00 PM UTC
OSU-170391, Transportation Plan Implementation - Bid Package #3
OSU Columbus Campus: Bid Package #3 includes a transit hub and pedestrian corridor improvements. This package includes roadways, sidewalks and curbs.
04/26/2017 06:00 PM UTC
OSU-150009 Roof Repairs and Replacements (Phase 2) (BP1) REBID
Caldwell Lab and Dreese Lab Roof Replacements (REBID)
04/20/2017 06:30 PM UTC
OSU-170323, Athletics District - Road and Storm Water
The base bid project consists of the abatement and demolition of six (6) complexes, construction of a new road between Fred Taylor Drive and Olentangy River Road complete with installation of the entire storm water infrastructure as shown on the project plans and documents. The project is located in the heart of the Athletic Campus, near the Woody Hayes Athletic Center and the varsity Tennis Center. The project shall intend to service the necessary traffic and storm infrastructure required for future development and renovation of existing buildings in the area. The storm infrastructure is vital to the project and shall be installed in its entirety including areas shown in phase I and phase II. Phase II work includes abatement and demolition of six (3) complexes and completion of the construction of the new road in Phase I.
04/18/2017 06:00 PM UTC
OSU-150679 300 W 10th – Rooms 440 and 442 REBID
Renovation of three operating room suites. Upgrades include wall finishes, replacing existing ceramic tile with full height wall protection, and electrical work. New ceiling hung medical booms are planned to replace the existing including medical gases, electrical and structural work. New AV pathways will be provided for new equipment. Sprinklerand fire alarm work will be required for renovation work.Provide CO2 in ORs and tie into existing manifold in Rhodes/Doan Hall.
04/11/2017 06:00 PM UTC
OSU-160299 Fawcett - East Wing Renovation (RE-BID)
Fawcett - East Wing Renovation includes conference rooms and new SASSO office improvements on ground floor.
04/10/2017 06:00 PM UTC