The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
| 10/16/2025 06:00 PM UTC |
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
| 10/16/2025 06:00 PM UTC |
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
| 10/22/2025 06:00 PM UTC |
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
| 10/24/2025 06:00 PM UTC |
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068.
This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
| 10/31/2025 06:00 PM UTC |
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
| 11/04/2025 07:00 PM UTC |
Number | Deadline |
---|---|
OSU-150018 Emergency Generator Replacement
This project will replace emergency generators on campus. Exact replacements will be determined during planning/design phase.
| 03/01/2016 06:00 PM UTC |
OSU-150139 Kuhns Hail Damage Repair
This project will completely replace 27 squares of roof.
| 02/26/2016 07:00 PM UTC |
OSU-081049 Selected Tunnel Replacement Projects BP 2
This project will replace tunnel sections
| 02/17/2016 06:00 PM UTC |
OSU-150030, Marion Roof and Electrical Repairs
Roof and Electrical Repairs on the OSU Marion Campus. The buildings associated with the project are Alber Student Center, Morrill Hall and Technical Education Center.
| 02/05/2016 07:00 PM UTC |
OSU-150661 Bolz-Central Svc-Window Replacement
This project will replace the windows in both buildings.
| 02/04/2016 07:30 PM UTC |
OSU-150418 Compressed Natural Gas Station
Plans, elevations, sections, details, and schedules
| 02/02/2016 07:00 PM UTC |
OSU-150189, Scott Lab-Instructional Lab
Ohio State University Main Campus. The Project renovates portions of the lower level, first and second floor of the west building of Scott Laboratory.
| 02/02/2016 06:00 PM UTC |
OSU-160091, WHAC - Air Handler Replacement
This project will replace the air handler for the Woody Hayes Athletic Center.
| 01/13/2016 06:00 PM UTC |
OSU-081056 South Campus Sewer Separation and Site Improvements REBID
REBID - construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
| 01/13/2016 06:00 PM UTC |
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
| 12/10/2015 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.