General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
08/13/2026 06:00 PM UTC
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM membrane. • Selective replacement of damaged, wet, or deteriorated insulations. • Replacement of edge metals. • Lightening protection replacement. • Fire alarm panel replacement. • Fire pump controller replacement (alternate)
08/19/2026 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
08/20/2026 06:00 PM UTC
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
08/20/2026 06:00 PM UTC
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
08/26/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
08/27/2026 06:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-150011 Bricker Hall HVAC Repiar and Renovation BP1 Demolition
Bricker Hall 3rd Floor HVAC and ceiling removal. Install new ceiling and lights as well as demolition
12/22/2016 06:00 PM UTC
OSU-150011 Bricker Hall HVAC Repair and Renovation - BP2 - HVAC
Bricker Hall HVAC Upgrades at 2nd and 3rd Floors. New associated electrical and finish upgrades
12/22/2016 06:00 PM UTC
OSU-160397 Browning Amphitheater Restoration
Browning Amphitheater Restoration
12/21/2016 06:00 PM UTC
OSU-150258 Utility Distribtuion System Renewal
Utility Distribution System Renewal
12/16/2016 06:00 PM UTC
OSU-150194 Lincoln - Suite 220 Renovation
This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
12/15/2016 07:00 PM UTC
OSU-160527 Parks Room 437 Renovation
Parks Hall - This project will renovate the lab including benches, faucets, fume hoods, flooring.
12/13/2016 07:00 PM UTC
OSU-150661 Bolz-Central Svc-Window Replacement, BP2
Aluminum window replacement of approximately 50 existing masonry openings. Entrance door replacement of 3 exterior doors.
12/13/2016 06:00 PM UTC
OSU-160302 Rhodes Public Restroom
This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
11/28/2016 04:00 PM UTC
OSU-160938 Vet Med Surgical Suite Renovation
This project will renovate surgery and IT facilities to accommodate expansion.
11/28/2016 04:00 PM UTC
OSU-160422 UH East – Elevator 10-11 Modernization
This project will modify the two elevators.
11/22/2016 07:00 PM UTC
561 - 570 of 631 Solicitations
1 2 53 54 55 57 59 60 61 62 63 64