General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
12/03/2025 07:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
12/10/2025 07:00 PM UTC
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/10/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-150419, Longaberger - Room 030 Renovation
Longaberger Alumni House - This project will convert the former print shop into office/office support space.
04/15/2016 05:00 PM UTC
5062-PF073757 East Regional Chilled Water Plant Phase 2 Distribution - BP2 Restoration
Phase 2 work includes connecting the North Residential District, Celeste Lab, Newman & Wolfrom, and Evans Lab. Additional phase 2 work will upgrade the steam line for future buildings in the Academic Core North, and replace the tunnel between College Avenue and Smith Lab.
04/07/2016 06:00 PM UTC
OSU-150024, Mansfield - Sidewalks/Lots/Curbs, Phase 2
Phase 2 construction includes work on University Drive, The Child Development Center, Reidl Hall parking lots, and Kenwood Circle on the OSU Mansfield Campus.
03/29/2016 06:00 PM UTC
OSU-150014 Building Envelope Repair
This is a bundled FOD project to repair building envelopes on campus. Exact buildings will be determined during planning/design phase.
03/29/2016 05:00 PM UTC
OSU-140680 Doan Dialysis Renovation and Relocation
This project will move Dialysis from 9W Rhodes to 10W Doan.
03/23/2016 06:30 PM UTC
OSU-150473, Bradley - Elevator Modernization
The Work consists of modernization of an existing overhead traction type, 5-stop elevator located at Bradley Hall on Ohio State University’s Columbus campus. The project will update the elevator including cab, hoistway equipment, machine room equipment and controls, and necessary HVAC and electrical upgrades to support the new elevator and to meet current code requirements.
03/23/2016 05:00 PM UTC
OSU-150513 CCCT- James Family Resource Ctr
This project will fit out shelled space on the ground floor for the James Family Resource and Welcome Center.
03/21/2016 05:30 PM UTC
OSU-150729, Coffey Road Lighting
This project installs new athletic field lighting for the Coffey Road athletics fields.
03/15/2016 05:00 PM UTC
OSU-110215 Street and Bridge Maintenance Phase 1 BP6
This project will preform street and bridge maintenance across campus
03/02/2016 06:00 PM UTC
OSU-150018 Emergency Generator Replacement
This project will replace emergency generators on campus. Exact replacements will be determined during planning/design phase.
03/01/2016 06:00 PM UTC
561 - 570 of 590 Solicitations
1 2 51 52 53 54 55 57 59