The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-160298 Fawcett Center - Lobby Cafe
Renovation of the Fawcett Center lobby for the construction of a new café and seating area.
| 10/31/2016 06:00 PM UTC |
|
OSU-160240 Building Identification Sign Replacement
Building Identification Sign Replacement
Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents.
Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass.
Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape.
An alternate for (2) Sign Type 41 monument signs.
Installation of temporary signs (purchased by allowance through the Owner) while signs are being refurbished. Removal of temporary signs after refurbished signs are installed.
| 10/19/2016 06:30 PM UTC |
|
OSU-150012 Elevator Safety Repair and Replacements
The work consists of the modernization of three (3) traction elevators, one each in Hitchcock Hall, the Mathematics Building, and Scott Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
| 10/06/2016 05:00 PM UTC |
|
OSU-130636 Dodd Hall Secure Care System
This project will remove the existing and install a new secure care system on all floors. Dodd Hall Columbus, OH
| 09/21/2016 05:30 PM UTC |
|
OSU-160633, Taylor Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water heaters and 2 heating water boilers on the 13th and 14th Floors of Taylor Tower. The work also includes replacement of 2 domestic water storage tanks and 6 heating water expansion tanks. The work will be done in 4 phases for minimum impact to building operation. The University will pre-purchase 3 heating water boilers and 2 domestic water boilers to be installed by the Contractor.
| 09/20/2016 06:00 PM UTC |
|
OSU-130331 University Hospitals Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions. University East 181 Taylor Ave Columbus, OH 43203
| 09/08/2016 06:00 PM UTC |
|
OSU-130635 North High Street Landscape BP 2 (Ohio Field Signage)
To provide historical interpretive signage for the portion of campus west of High Street between Woodruff Street and 17th Ave.
| 09/08/2016 04:00 PM UTC |
|
OSU-150194 Lincoln - Suite 220 Renovation
** This project has been cancelled until further notice.
This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
| 08/15/2016 06:00 PM UTC |
|
OSU-150010 Fire System Replacements
The project consists of new manual fire alarm systems, hazardous material abatement of duct and pipe insulation, mudded fittings, ceiling and floor tiles, and the associated material replacement, and architectural patching and finishes in 9 buildings on OSU’s main campus: Agricultural Administration Building, Atwell Hall, Campbell Hall, Denney Hall, (Alternate 1) Enarson Classroom Building, Electroscience Lab, Sisson Hall, University Hall, Scott Hall. The existing fire alarm system in each building will be removed completely after the approval of the new system.
| 08/12/2016 02:00 PM UTC |
|
OSU-120652, Lima - Booster Pump Station
OSU Lima Campus-This project will install a new master booster pump station to increase campus water pressure to all buildings.
| 08/11/2016 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.