General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement
Replacement of (2) air-cooled, low-temperature glycol chillers and associated piping, electrical, structural, controls, and rigging work at Ross Heart Hospital. Includes bid alternates for construction phasing, control valves, AHU sensors, and access platforms.
11/18/2026 07:00 PM UTC
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466 SF of the 4th floor including minor demolition, construction of new interior partitions, new ceiling grid and tile, new doors, new finishes, associated mechanical, electrical, plumbing and fire protection work. An accessible restroom is being added to the floor. A break area will also be added with associated plumbing, casework and fixtures.
11/19/2026 07:00 PM UTC
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing imaging room at the James Cancer Center. The scope includes new conduit pathways, power, floor CT rails, ceiling coordination, process chilled water and other infrastructure to support the new equipment.
11/20/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OSU-150026, Lima - HVAC Repair and Replacements
OSU Lima Campus: This project will include the removal of pneumatic control systems; installation of new DDC controls; updating of current constant volume air handling system; updating air boxes; and replacement of exhaust fans on Galvin Hall.
02/28/2017 08:00 PM UTC
OSU-160296 ATI - Residence Hall Demolition
The project consists of asbestos abatement at The Ohio State University-ATI Residence Hall, 1328 Dover Rd., Wooster, Ohio 44691; and demolition and disposal of the building and site improvements at the same location.
02/28/2017 07:00 PM UTC
OSU-160343 REBID Carepoint Lewis Center - 1st & 2nd Floor Office
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine.
02/24/2017 07:00 PM UTC
OSU-160464 Mack - Restroom Renovations
The project involves the demolition and renovation of residence rooms, bathrooms, and electrical branch service and wiring in the A and B wings wiring of Mack Hall. The completed design will be consistent with the previous renovation of the C and D wings in Mack Hall that were completed in 2009.
02/24/2017 03:00 PM UTC
OSU-160657 Ackerman – Chilled Water and Boiler
This project will install a boiler plant including pumping system and DDC controls and install a chilled water plant.
02/23/2017 07:00 PM UTC
OSU-160422 UH East Elevator 10-11 Modernization
This project will renovate two elevators UH East 181 Taylor Avenue Columbus OH 43203
02/21/2017 07:00 PM UTC
OSU-160343 CarePoint Lewis Center
This project will relocate the lab in suite 2200 to the first floor business office and reconfigure suite 2200 to workspace for Family Medicine. Lewis Center, Ohio
02/07/2017 07:00 PM UTC
OSU-160376 Ross – 4th Floor Hybrid Operating Room
This project will renovate the OR and replace imagine equipment to create a hybrid suite.
02/02/2017 07:00 PM UTC
OSU-150403 University Hospitals Relocate Surgical Pathology
This project will relocate Surgical Pathology from 4 East to 5 East.
01/19/2017 07:00 PM UTC
OSU-138009 Steam and Condinsate Distribution System Upgrades Phase 3 - BP3 Pomerene Tunnel
This project installs new waterline, replaces concrete trench, performs structural repairs, installs a concrete tunnel vault, replaces condensate piping and steam piping, installs chilled water supply and return piping, and completes other utility improvements to the Pomerene tunnel in the area from South Oval Drive to just north of 12th Avenue eastbound.
01/10/2017 06:00 PM UTC
571 - 580 of 651 Solicitations