General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-220524, McCampbell - OBGYN Renovation
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
10/16/2025 06:00 PM UTC
OSU-230110 Infrastructure Renewal FY 23 24
The project includes concrete pavement replacement along the two Westernmost lanes of Carmack Road and asphalt pavement mill and overlay at intersecting drive aprons. Also included is the partial sidewalk removal and rebuild of curb ramp on the West side of Carmack Road.
10/16/2025 06:00 PM UTC
OSU-250252, Outpatient Dublin & New Albany - Bollard Replacement
The project includes removal and replacement of detectable warnings, concrete and bollards at Outpatient Dublin & Outpatient New Albany.
10/22/2025 06:00 PM UTC
OSU-230105 Fire System Renovations FY23 24 BP 02
This project is a fire alarm upgrade at the Bio Science building. The project includes the replacement of the main fire alarm control panel in the same location as the existing and replacement of all fire alarm initiation devices in the same locations as the existing. Existing rough-ins and wiring will be reused. The operation of the fire alarm system will be restored to pre-construction condition.
10/24/2025 06:00 PM UTC
OSU-240250, Outpatient East - 3rd Floor Space Refresh
Outpatient Care East is a three-story outpatient facility on Taylor Ave in Columbus, OH. This project will refresh the 3rd floor common spaces, 3rd floor public bathrooms, and Suite 3068. This project will refresh the common hallways, the lobby, suite 3068, and other spaces by updating finishes and replacing existing lighting with new LED fixtures. It will also refresh the public bathrooms by updating the finishes and updating the existing fixtures.
10/31/2025 06:00 PM UTC
OSU-240366, Outpatient NA - New Women's Imaging Clinic
Renovation of Outpatient Care New Albany second floor overflow waiting area to provide Women’s Imaging Clinic.
11/04/2025 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-081049 Selected Tunnel Replacement Projects - BP2
This project will replace tunnel sections in order of priority as shown below. Phasing of each construction segment will be determined during the design stage. T-1 Beneath College Road between Page Hall and Hagerty Hall
12/04/2015 07:00 PM UTC
OSU-130331 University Hospitals East - Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions.
12/04/2015 06:30 PM UTC
TEST
This is a test.
12/02/2015 07:45 PM UTC
OSU-100652 Various Building Demolitions Phase 2
Demolition of up to five (05) buildings noted as KRC A, B, C, D, and E located at The Ohio State University Campus in Columbus, Ohio. Work includes abatement; complete removal of all foundations, footings, etc.; proper back-fill and compaction; adjustments to site lighting and site utilities; site grading and repair.
11/19/2015 03:00 PM UTC
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
11/12/2015 07:00 PM UTC
OSU-081056 South Campus Sewer Separation and Site Improvements
This is a continuation of the project approved in the 2007-2008 Capital Plan Process. The first phase is complete. The second phase will perform design and construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
11/03/2015 07:00 PM UTC
OSU-150330 Hitchcock HVAC Repair and Replacements
This project will repair the HVAC in Hitchcock Hall
10/28/2015 02:30 PM UTC
OSU-150179 Pomerene - Relocate District 2 Shop
This project will relocate the district shop from the building to enable the Pomerene/Oxley renovation project. The shop will be relocated to the basement of Aronoff and the first floor of the Biological Sciences Building.
10/23/2015 02:00 PM UTC
OSU-150412
Wexner - Chiller Replacement, Columbus Campus, Franklin County
08/11/2015 06:00 PM UTC
OSU-150170 - McCracken-Restroom & Breakroom Upgrades
This project will upgrade restrooms on the 1st floor of McCracken and the adjacent break room into two restrooms and a new break room.
07/24/2015 05:00 PM UTC
571 - 580 of 581 Solicitations
1 2 51 52 53 54 55 56 58