General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer REBID
Masonry Wall Repair – Brick Veneer: The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
12/02/2025 07:00 PM UTC
OSU-220524 McCampbell - OBGYN Renovation REBID
Alterations to 4th Floor OBGYN Clinic including, millwork, painting, electrical and technology.
12/03/2025 07:00 PM UTC
OSU-230106 Plumbing Renovations FY23-24 BioScience REBID
This is a 2nd Rebid with reduced scope. Horizontal galvanized piping will remain. New domestic water and fire backflow preventors in a new location. New riser. Backfeed existing systems. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility
12/10/2025 07:00 PM UTC
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/10/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-130331 University Hospitals East - Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions.
12/04/2015 06:30 PM UTC
TEST
This is a test.
12/02/2015 07:45 PM UTC
OSU-100652 Various Building Demolitions Phase 2
Demolition of up to five (05) buildings noted as KRC A, B, C, D, and E located at The Ohio State University Campus in Columbus, Ohio. Work includes abatement; complete removal of all foundations, footings, etc.; proper back-fill and compaction; adjustments to site lighting and site utilities; site grading and repair.
11/19/2015 03:00 PM UTC
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
11/12/2015 07:00 PM UTC
OSU-081056 South Campus Sewer Separation and Site Improvements
This is a continuation of the project approved in the 2007-2008 Capital Plan Process. The first phase is complete. The second phase will perform design and construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
11/03/2015 07:00 PM UTC
OSU-150330 Hitchcock HVAC Repair and Replacements
This project will repair the HVAC in Hitchcock Hall
10/28/2015 02:30 PM UTC
OSU-150179 Pomerene - Relocate District 2 Shop
This project will relocate the district shop from the building to enable the Pomerene/Oxley renovation project. The shop will be relocated to the basement of Aronoff and the first floor of the Biological Sciences Building.
10/23/2015 02:00 PM UTC
OSU-150412
Wexner - Chiller Replacement, Columbus Campus, Franklin County
08/11/2015 06:00 PM UTC
OSU-150170 - McCracken-Restroom & Breakroom Upgrades
This project will upgrade restrooms on the 1st floor of McCracken and the adjacent break room into two restrooms and a new break room.
07/24/2015 05:00 PM UTC
OSU-080593 James - Executive Health Relocation
This project will relocate the Executive Health Clinic from Doan to the 5th floor of the James.
06/19/2015 05:00 PM UTC
581 - 590 of 590 Solicitations
1 2 51 52 53 54 55 56 57 59 Next →