General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-255191, Ross Cardiac Cath Lab #5 Renovation/Replacement
Renovation and equipment replacement of Cath Lab #5.
02/05/2026 07:00 PM UTC
OSU-240082, James - Pharmacy Administration Renovation (C150, C150A through C150F, C150X) REBID
The project is the renovation of an existing open office into enclosed office in the administrative suite. The area of construction is approximately 1,500 square feet. The work consists of the removal of flooring and ceiling grid and tiles and the associated fire protection, mechanical, and electrical systems. The new work will consist of creating eight private offices and two general work areas. The new work will entail new partitions, doors and frames, ceilings, finishes in the new OSUWMC finish standards, and the associated mechanical, electrical, and fire protection systems
02/12/2026 07:00 PM UTC
OSU-230116 Herrick Drive Rebuild
This project is the full depth pavement reconstruction of John Herrick Drive from Olentangy River Road to Woody Hayes Drive. This project includes the construction of a 10’ shared use path, upgraded lighting, pedestrian signal modifications, pavement markings, and landscaping.
02/13/2026 07:00 PM UTC
OSU-250037 Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall.
02/25/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSU-081049 Selected Tunnel Replacement Projects - BP2
This project will replace tunnel sections in order of priority as shown below. Phasing of each construction segment will be determined during the design stage. T-1 Beneath College Road between Page Hall and Hagerty Hall
12/04/2015 07:00 PM UTC
OSU-130331 University Hospitals East - Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions.
12/04/2015 06:30 PM UTC
TEST
This is a test.
12/02/2015 07:45 PM UTC
OSU-100652 Various Building Demolitions Phase 2
Demolition of up to five (05) buildings noted as KRC A, B, C, D, and E located at The Ohio State University Campus in Columbus, Ohio. Work includes abatement; complete removal of all foundations, footings, etc.; proper back-fill and compaction; adjustments to site lighting and site utilities; site grading and repair.
11/19/2015 03:00 PM UTC
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
11/12/2015 07:00 PM UTC
OSU-081056 South Campus Sewer Separation and Site Improvements
This is a continuation of the project approved in the 2007-2008 Capital Plan Process. The first phase is complete. The second phase will perform design and construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
11/03/2015 07:00 PM UTC
OSU-150330 Hitchcock HVAC Repair and Replacements
This project will repair the HVAC in Hitchcock Hall
10/28/2015 02:30 PM UTC
OSU-150179 Pomerene - Relocate District 2 Shop
This project will relocate the district shop from the building to enable the Pomerene/Oxley renovation project. The shop will be relocated to the basement of Aronoff and the first floor of the Biological Sciences Building.
10/23/2015 02:00 PM UTC
OSU-150412
Wexner - Chiller Replacement, Columbus Campus, Franklin County
08/11/2015 06:00 PM UTC
OSU-150170 - McCracken-Restroom & Breakroom Upgrades
This project will upgrade restrooms on the 1st floor of McCracken and the adjacent break room into two restrooms and a new break room.
07/24/2015 05:00 PM UTC
591 - 600 of 601 Solicitations
1 2 53 54 55 56 57 58 60