The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Project generally includes the removal and replacement of three underground storage tanks along with improvements to related equipment and infrastructure such as dispensers, concrete, canopies, etc…
| 10/15/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-130635 North High Street Landscape BP 2 (Ohio Field Signage)
To provide historical interpretive signage for the portion of campus west of High Street between Woodruff Street and 17th Ave.
| 09/08/2016 04:00 PM UTC |
|
OSU-150194 Lincoln - Suite 220 Renovation
** This project has been cancelled until further notice.
This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
| 08/15/2016 06:00 PM UTC |
|
OSU-150010 Fire System Replacements
The project consists of new manual fire alarm systems, hazardous material abatement of duct and pipe insulation, mudded fittings, ceiling and floor tiles, and the associated material replacement, and architectural patching and finishes in 9 buildings on OSU’s main campus: Agricultural Administration Building, Atwell Hall, Campbell Hall, Denney Hall, (Alternate 1) Enarson Classroom Building, Electroscience Lab, Sisson Hall, University Hall, Scott Hall. The existing fire alarm system in each building will be removed completely after the approval of the new system.
| 08/12/2016 02:00 PM UTC |
|
OSU-120652, Lima - Booster Pump Station
OSU Lima Campus-This project will install a new master booster pump station to increase campus water pressure to all buildings.
| 08/11/2016 06:00 PM UTC |
|
OSU-160198, 1900 Kenny Rd - Flooring and Window Replacement
This project involves the removal and replacement of all existing windows; removal and replacement of a portion of the existing entrance doors; the removal and replacement of existing floor finishes in corridors and stairs; painting of corridor walls; and the installation of new room identification signs.
| 08/10/2016 06:00 PM UTC |
|
OSU-160203, Newark - Founders Administrative Office-REBID
OSU Newark Campus - The project scope covers the renovation of existing interior spaces for a new Executive Office Suite for the Dean of The Ohio State University, Newark Campus. The areas to be remodeled comprise approximately 1,550 square feet. Existing walls, doors, finishes, electric and HVAC systems will be removed.
| 08/10/2016 05:00 PM UTC |
|
OSU-150012 Elevator Safety Repair and Replacements BP2
The work consists of the modernization of three (3) traction elevators, one each in Hitchcock Hall, the Mathematics Building, and Scott Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
| 08/09/2016 05:00 PM UTC |
|
OSU-150017 Electrical Infrastructure Improvements - REBID
Electrical Campus Infrastructure on main campus
| 08/04/2016 05:00 PM UTC |
|
OSU-160193, Celeste - Basement Lab Renovation
The Project renovates portions of the lower level and second floor of Celeste Laboratory. The work includes selective demolition of existing partitions; providing partitions to demark and subdivide new rooms; and develops new labs and offices.
| 07/20/2016 06:00 PM UTC |
|
OSU-150012 Elevator Safety Repair and Replacements BP1
The work consists of the modernization of four (4) traction elevators and one (1) hydraulic elevator in Dreese Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
| 07/13/2016 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.