OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement
Replacement of (2) air-cooled, low-temperature glycol chillers and associated piping, electrical, structural, controls, and rigging work at Ross Heart Hospital. Includes bid alternates for construction phasing, control valves, AHU sensors, and access platforms.
11/18/2026 07:00 PM UTC
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466 SF of the 4th floor including minor demolition, construction of new interior partitions, new ceiling grid and tile, new doors, new finishes, associated mechanical, electrical, plumbing and fire protection work. An accessible restroom is being added to the floor. A break area will also be added with associated plumbing, casework and fixtures.
11/19/2026 07:00 PM UTC
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing imaging room at the James Cancer Center. The scope includes new conduit pathways, power, floor CT rails, ceiling coordination, process chilled water and other infrastructure to support the new equipment.
11/20/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OSU-160298 Fawcett Center - Lobby Cafe
Renovation of the Fawcett Center lobby for the construction of a new café and seating area.
10/31/2016 06:00 PM UTC
OSU-160240 Building Identification Sign Replacement
Building Identification Sign Replacement Replacement, refurbishment or new fabrication and installation of building identification free-standing signs, wall-mounted and vinyl-applied signs. Signs vary in scale, type and composition. Refer to Sign Types in Contract Documents. Restoration of landscaping elements surrounding new, replacement or refurbished signs including, but not limited to pavers, asphalt, mulch beds and grass. Demolition and proper disposal of signs, posts and concrete bases. If sign is not replaced, fill holes left by base removal and patch according to surrounding landscape. An alternate for (2) Sign Type 41 monument signs. Installation of temporary signs (purchased by allowance through the Owner) while signs are being refurbished. Removal of temporary signs after refurbished signs are installed.
10/19/2016 06:30 PM UTC
OSU-150012 Elevator Safety Repair and Replacements
The work consists of the modernization of three (3) traction elevators, one each in Hitchcock Hall, the Mathematics Building, and Scott Hall. The work will include minor general trades work and upgrades to associated mechanical and electrical systems necessary for the elevator improvements.
10/06/2016 05:00 PM UTC
OSU-130636 Dodd Hall Secure Care System
This project will remove the existing and install a new secure care system on all floors. Dodd Hall Columbus, OH
09/21/2016 05:30 PM UTC
OSU-160633, Taylor Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water heaters and 2 heating water boilers on the 13th and 14th Floors of Taylor Tower. The work also includes replacement of 2 domestic water storage tanks and 6 heating water expansion tanks. The work will be done in 4 phases for minimum impact to building operation. The University will pre-purchase 3 heating water boilers and 2 domestic water boilers to be installed by the Contractor.
09/20/2016 06:00 PM UTC
OSU-130331 University Hospitals Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions. University East 181 Taylor Ave Columbus, OH 43203
09/08/2016 06:00 PM UTC
OSU-130635 North High Street Landscape BP 2 (Ohio Field Signage)
To provide historical interpretive signage for the portion of campus west of High Street between Woodruff Street and 17th Ave.
09/08/2016 04:00 PM UTC
OSU-150194 Lincoln - Suite 220 Renovation
** This project has been cancelled until further notice. This is a renovation of an existing space in Lincoln Tower to a new office space. The scope generally includes interior demolition, abatement, and new work including Architectural, and MEP upgrades.
08/15/2016 06:00 PM UTC
OSU-150010 Fire System Replacements
The project consists of new manual fire alarm systems, hazardous material abatement of duct and pipe insulation, mudded fittings, ceiling and floor tiles, and the associated material replacement, and architectural patching and finishes in 9 buildings on OSU’s main campus: Agricultural Administration Building, Atwell Hall, Campbell Hall, Denney Hall, (Alternate 1) Enarson Classroom Building, Electroscience Lab, Sisson Hall, University Hall, Scott Hall. The existing fire alarm system in each building will be removed completely after the approval of the new system.
08/12/2016 02:00 PM UTC
OSU-120652, Lima - Booster Pump Station
OSU Lima Campus-This project will install a new master booster pump station to increase campus water pressure to all buildings.