The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
| 08/13/2026 06:00 PM UTC |
|
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM
membrane.
• Selective replacement of damaged, wet, or deteriorated
insulations.
• Replacement of edge metals.
• Lightening protection replacement.
• Fire alarm panel replacement.
• Fire pump controller replacement (alternate)
| 08/19/2026 06:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
| 08/20/2026 06:00 PM UTC |
|
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
| 08/20/2026 06:00 PM UTC |
|
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
| 08/26/2026 06:00 PM UTC |
|
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
| 08/27/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-150016 Road and Bridge Improvements
This project includes reconstruction of approximately 1,000 feet of a service road at OSU Airport and reconstruction of approximately 400 feet of College Road with associated utilities and roadside improvements.
| 04/18/2016 05:00 PM UTC |
|
OSU-150419, Longaberger - Room 030 Renovation
Longaberger Alumni House - This project will convert the former print shop into office/office support space.
| 04/15/2016 05:00 PM UTC |
|
5062-PF073757 East Regional Chilled Water Plant Phase 2 Distribution - BP2 Restoration
Phase 2 work includes connecting the North Residential District, Celeste Lab, Newman & Wolfrom, and Evans Lab. Additional phase 2 work will upgrade the steam line for future buildings in the Academic Core North, and replace the tunnel between College Avenue and Smith Lab.
| 04/07/2016 06:00 PM UTC |
|
OSU-150024, Mansfield - Sidewalks/Lots/Curbs, Phase 2
Phase 2 construction includes work on University Drive, The Child Development Center, Reidl Hall parking lots, and Kenwood Circle on the OSU Mansfield Campus.
| 03/29/2016 06:00 PM UTC |
|
OSU-150014 Building Envelope Repair
This is a bundled FOD project to repair building envelopes on campus. Exact buildings will be determined during planning/design phase.
| 03/29/2016 05:00 PM UTC |
|
OSU-140680 Doan Dialysis Renovation and Relocation
This project will move Dialysis from 9W Rhodes to 10W Doan.
| 03/23/2016 06:30 PM UTC |
|
OSU-150473, Bradley - Elevator Modernization
The Work consists of modernization of an existing overhead traction type, 5-stop elevator located at Bradley Hall on Ohio State University’s Columbus campus. The project will update the elevator including cab, hoistway equipment, machine room equipment and controls, and necessary HVAC and electrical upgrades to support the new elevator and to meet current code requirements.
| 03/23/2016 05:00 PM UTC |
|
OSU-150513 CCCT- James Family Resource Ctr
This project will fit out shelled space on the ground floor for the James Family Resource and Welcome Center.
| 03/21/2016 05:30 PM UTC |
|
OSU-150729, Coffey Road Lighting
This project installs new athletic field lighting for the Coffey Road athletics fields.
| 03/15/2016 05:00 PM UTC |
|
OSU-110215 Street and Bridge Maintenance Phase 1 BP6
This project will preform street and bridge maintenance across campus
| 03/02/2016 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.