OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement
Replacement of (2) air-cooled, low-temperature glycol chillers and
associated piping, electrical, structural, controls, and rigging work
at Ross Heart Hospital. Includes bid alternates for construction
phasing, control valves, AHU sensors, and access platforms.
| 11/18/2026 07:00 PM UTC |
|
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466
SF of the 4th floor including minor demolition, construction of new
interior partitions, new ceiling grid and tile, new doors, new
finishes, associated mechanical, electrical, plumbing and fire
protection work. An accessible restroom is being added to the
floor. A break area will also be added with associated plumbing,
casework and fixtures.
| 11/19/2026 07:00 PM UTC |
|
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing
imaging room at the James Cancer Center. The scope includes
new conduit pathways, power, floor CT rails, ceiling coordination,
process chilled water and other infrastructure to support the new equipment.
| 11/20/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-150016 Road and Bridge Improvements
This project includes reconstruction of approximately 1,000 feet of a service road at OSU Airport and reconstruction of approximately 400 feet of College Road with associated utilities and roadside improvements.
| 04/18/2016 05:00 PM UTC |
|
OSU-150419, Longaberger - Room 030 Renovation
Longaberger Alumni House - This project will convert the former print shop into office/office support space.
| 04/15/2016 05:00 PM UTC |
|
5062-PF073757 East Regional Chilled Water Plant Phase 2 Distribution - BP2 Restoration
Phase 2 work includes connecting the North Residential District, Celeste Lab, Newman & Wolfrom, and Evans Lab. Additional phase 2 work will upgrade the steam line for future buildings in the Academic Core North, and replace the tunnel between College Avenue and Smith Lab.
| 04/07/2016 06:00 PM UTC |
|
OSU-150024, Mansfield - Sidewalks/Lots/Curbs, Phase 2
Phase 2 construction includes work on University Drive, The Child Development Center, Reidl Hall parking lots, and Kenwood Circle on the OSU Mansfield Campus.
| 03/29/2016 06:00 PM UTC |
|
OSU-150014 Building Envelope Repair
This is a bundled FOD project to repair building envelopes on campus. Exact buildings will be determined during planning/design phase.
| 03/29/2016 05:00 PM UTC |
|
OSU-140680 Doan Dialysis Renovation and Relocation
This project will move Dialysis from 9W Rhodes to 10W Doan.
| 03/23/2016 06:30 PM UTC |
|
OSU-150473, Bradley - Elevator Modernization
The Work consists of modernization of an existing overhead traction type, 5-stop elevator located at Bradley Hall on Ohio State University’s Columbus campus. The project will update the elevator including cab, hoistway equipment, machine room equipment and controls, and necessary HVAC and electrical upgrades to support the new elevator and to meet current code requirements.
| 03/23/2016 05:00 PM UTC |
|
OSU-150513 CCCT- James Family Resource Ctr
This project will fit out shelled space on the ground floor for the James Family Resource and Welcome Center.
| 03/21/2016 05:30 PM UTC |
|
OSU-150729, Coffey Road Lighting
This project installs new athletic field lighting for the Coffey Road athletics fields.
| 03/15/2016 05:00 PM UTC |
|
OSU-110215 Street and Bridge Maintenance Phase 1 BP6
This project will preform street and bridge maintenance across campus
| 03/02/2016 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.