General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230110 Infrastructure Renewal FY 23-24 Borror Drive BP 2
The project involves asphalt pavement mill and overlay along Borror Drive. Also includes select curb ramp and sidewalk replacement to meet ADA standards.
08/13/2026 06:00 PM UTC
OSU-250014 Lima - Life and Physical Science Bldg Safety Renovation
• Recover of roof system with insulation and EPDM membrane. • Selective replacement of damaged, wet, or deteriorated insulations. • Replacement of edge metals. • Lightening protection replacement. • Fire alarm panel replacement. • Fire pump controller replacement (alternate)
08/19/2026 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP-3
The project consists of the removal and replacement of the South Neil tunnel roof, removal of abandoned utilities, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct new steam and condensate and chilled water supply and return lines within the South Neil Tunnel. Direct buried chilled water lines will also be installed under this scope.
08/20/2026 06:00 PM UTC
OSU-210390, Lima - Ford Engine Plant EEMC Lab Upgrades
Renovations and upgrades to two lab spaces at OSU Lima – Ford Engine Plant EEMC Lab located at 115 Bible Rd Lima, Ohio 45801
08/20/2026 06:00 PM UTC
OSU-250050 Marion - Morrill Hall Fire Panel/Elevator Upgrades
Fire alarm and elevator upgrades within Morrill Hall at the OSU Marion campus.
08/26/2026 06:00 PM UTC
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement
Ohio State University Fuel Tank and Dispensing Infrastructure Replacement: Replace underground storage tanks and dispensers
08/27/2026 06:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OSU-081049 Selected Tunnel Replacement Projects - BP2
This project will replace tunnel sections in order of priority as shown below. Phasing of each construction segment will be determined during the design stage. T-1 Beneath College Road between Page Hall and Hagerty Hall
12/04/2015 07:00 PM UTC
OSU-130331 University Hospitals East - Pharmacy Upgrades
This project will renovate existing space to provide increased fresh air and exhaust per 797 guidelines. Additional scope includes new finishes, casework and security/hardware functions.
12/04/2015 06:30 PM UTC
TEST
This is a test.
12/02/2015 07:45 PM UTC
OSU-100652 Various Building Demolitions Phase 2
Demolition of up to five (05) buildings noted as KRC A, B, C, D, and E located at The Ohio State University Campus in Columbus, Ohio. Work includes abatement; complete removal of all foundations, footings, etc.; proper back-fill and compaction; adjustments to site lighting and site utilities; site grading and repair.
11/19/2015 03:00 PM UTC
OSU-150182 Enarson - OIA Office Space
This project will renovate space in Enarson for the International Student and Scholar services and study abroad staff.
11/12/2015 07:00 PM UTC
OSU-081056 South Campus Sewer Separation and Site Improvements
This is a continuation of the project approved in the 2007-2008 Capital Plan Process. The first phase is complete. The second phase will perform design and construction for storm sewer separation around Drinko Hall, Paterson Hall, Siebert Hall, Morrison Hall, Canfield Hall, Mack Hall, Oxley Hall, and Bradley Hall and on 11th Avenue between High Street and Neil Avenue. Streetscape improvements of 11th Avenue are included. The work will be done at the buildings and the immediate area around the buildings. Some roadway disruption is expected. The project will prevent flooding in the student areas around the dorms on 11th Avenue.
11/03/2015 07:00 PM UTC
OSU-150330 Hitchcock HVAC Repair and Replacements
This project will repair the HVAC in Hitchcock Hall
10/28/2015 02:30 PM UTC
OSU-150179 Pomerene - Relocate District 2 Shop
This project will relocate the district shop from the building to enable the Pomerene/Oxley renovation project. The shop will be relocated to the basement of Aronoff and the first floor of the Biological Sciences Building.
10/23/2015 02:00 PM UTC
OSU-150412
Wexner - Chiller Replacement, Columbus Campus, Franklin County
08/11/2015 06:00 PM UTC
OSU-150170 - McCracken-Restroom & Breakroom Upgrades
This project will upgrade restrooms on the 1st floor of McCracken and the adjacent break room into two restrooms and a new break room.
07/24/2015 05:00 PM UTC
621 - 630 of 631 Solicitations
1 2 56 57 58 59 60 61 63