General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240504-2 Airport - Airfield Lighting Improvements
This project will be the construction of a new airfield lighting vault adjacent to Runway 5-23 in the midfield of the airport. All existing airfield lighting infrastructure to be intercepted and routed to the new building
05/06/2026 06:00 PM UTC
OSU-265306, University Hospital - Pavilion - 5 ATS Replacement
Replacement of ATS’s 1, 2, 3, 5, and 6 all in the same 5th floor electrical room.
05/07/2026 06:00 PM UTC
OSU-250474 - Ohio Union - Buckeye Commons Buildout
This project will renovate select areas within the Buckeye Commons suite at the Ohio Union.
05/07/2026 06:00 PM UTC
OSU-260108 - Ohio Stadium - South Stands Restroom Upgrades
This project includes the modification of two existing restrooms in Ohio Stadium to high-finish space for premium seat holders
05/08/2026 06:00 PM UTC
OSU-250046 Evans Lab 1969 Addition Demolition
Complete demolition of north wing of Evans Lab, the 1969 (northern most) addition of the facility. The remaining site will become temporary green space. Utilities serving adjacent wings will be maintained, including but not limited to natural gas, heating and domestic hot water, steam, domestic cold water, electric, fire alarm and ERRCS systems, and will be capped/terminated at appropriate locations to allow for re-use in subsequent project phases. A metal panel wall enclosure and interior hollow metal doors will be added to the remaining facility.
05/21/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-230106 Plumbing Renovations FY23-24 BioScience
This is a Rebid. New domestic water and fire backflow preventors in a new location. Backfeed existing systems. Replacement of existing galvanized steel cold water piping throughout the facility. Installation of new piping prior to demolition of active mains. Abatement related to installation and demolition of work. Hazardous containment in areas of known hazardous fireproofing. Finishes associated with access and pipe replacement. All work required for installation in an active and occupied facility.
02/10/2025 06:00 PM UTC
OSU-250003 - Ohio Stadium - Concession Stand Heaters
This project is for the installation of heaters within concession spaces that provide heat during winter events. The current scope of the project includes the installation of 34 electrically powered heaters.
12/30/2024 07:00 PM UTC
OSU-230431 1 Evans Hall Chiller Replacement REBID
Removal of existing chiller, providing new automatic propylene glycol feeder, providing 40% propylene glycol solution to fill system, installation of University purchased packaged chiller and transformer, provide concrete equipment pads, louvered fencing, site restoration, 200 gallon buffer tank, extending chilled water piping through roof to new chiller location, providing electric and controls from second floor mechanical room to University purchased chiller and transformer location outside on grade.
12/12/2024 07:00 PM UTC
OSU-230686 Veterinary Medical Center AHU-1 & AHU-2 Damper Replacement
Replacement of the existing OA, RA, and EA dampers and damper actuators serving AHU-1 and AHU-2. Addition of freeze protection pumps and associated piping, valves and accessories for the pre-heat coils in AHU-1 and AHU-2. Integration of the new freeze protection pumps into the existing BAS.
12/12/2024 06:00 PM UTC
Project OSU-230111 Road/Bridge Renewal FY23/24 RB 4
The planned scope of work includes rehabilitation of two bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs.
12/11/2024 07:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I BP 2
The project consists of the removal and replacement of the North McCracken tunnel roof, the complete removal of the North McCracken tunnel bypass, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct a new steam line within the North McCracken Tunnel. Under the Alternate 1 scope of work, a new water main will be constructed from the east end of the Oval to the west end and then up to the Cockins/Dulles loading dock area. The Alternate 2 scope of work provides alternate restoration methods to the North Oval Mall.
12/06/2024 06:00 PM UTC
OSU-240260, Newton - Lab Renovations
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
12/05/2024 07:00 PM UTC
OSU-250002 - Ohio Stadium - Heat Trace to Piping (Phase 2)
This project is to add new heat trace to existing Ohio Stadium piping.
11/20/2024 07:00 PM UTC
OSU-221019, Pressey - 90/92 ULAR Expansion
1. INTERIOR PROJECT TO CONVERT AN EXISTING COMMON SPACE AT THE LOWER LEVEL OF PRESSEY HALL INTO TWO NEW ANIMAL HOLDING ROOMS. 2. THE TWO NEW HOLDING ROOMS WILL BE SERVED BY AN EXPANDED HVAC SYSTEM, LOCAL FIRE-PROTECTION SYSTEM, AND ANIMAL WATERING SYSTEM. ELECTRICAL CONNECTIONS WILL BE MADE BACK TO EXISTING PANELS.
11/15/2024 07:00 PM UTC
OSU-230109 Emergency Generator Replacement FY23 24
Replace existing diesel generator with new diesel generator and separate electrical distribution system into life safety, stand-by, and fire pump in accordance with NEC. The generator, and diesel day tank shall be located interior to the building with a remote radiator. Demolition of abandoned equipment will be required for installation of new generator.
10/31/2024 05:00 PM UTC
81 - 90 of 617 Solicitations
1 2 5 6 7 9 11 12 13 61 62