General Info

Business Logo

Delaware County Regional Sewer District

50 Channing Street, Delaware , OH 43015
(740) 833-2240


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
East Alum Creek Interceptor Rehabilitation
Delaware County Regional Sewer District, East Alum Creek Interceptor Rehabilitation consists of cleaning, televising, and installing cured-in-place pipe (CIPP) lining in approximately 4,567 linear feet of 21-inch sanitary sewer. Bypass pumping and maintenance of traffic will be required to install the liner. The as-built plans for the sanitary sewers are included in the Construction Drawings in the Attachment List. The email address to request existing sewer inspection videos is on the cover of the CCTV Reports in the Attachment List. The Engineer's Estimate is $1,477,000 and includes the base bid, contingency, and allowance items. The project will be awarded on the total bid amount, including the base bid, contingency, and allowance items. The Substantial Completion Date is 365 days from Notice to Proceed. Final Payment and Completion Date is 425 days from Notice to Proceed.
04/04/2025 02:00 PM UTC
Jewett Road Trunk Sewer Improvements
Delaware County Regional Sewer District, Jewett Road Trunk Sewer Improvements. Remove and replace approximately 243 linear feet of existing 18-inch diameter sanitary sewer with proposed 24-inch sanitary sewer and replace two manholes.
01/31/2025 03:00 PM UTC
61-04E35 PACKAGE PLANT UPGRADES
DELAWARE COUNTY REGIONAL SEWER DISTRICT PACKAGE PLANT UPGRADES PROJECT The Bidder shall furnish all labor, material, equipment necessary to construct improvements at the Tartan Fields WRF, Lower Scioto WRF, O’Shaughnessy PS, and Scioto Reserve WRF as shown in the contract documents.
11/14/2023 07:00 PM UTC
Scioto Hills Sewer Rehabilitation Project
Delaware County Regional Sewer District, Scioto Hills Sewer Rehabilitation Project includes cleaning and televising (CCTV) 6,658 LF of 8” sanitary sewer, installing cured-in-place pipe (CIPP) lining in 4,733 LF of 8” sanitary sewer, and installing 48 full wrap cured-in-place lateral liners. Contingency items include chemical grouting, additional CIPP, and open-cut point repairs.
09/29/2023 02:00 PM UTC
61-04E35 Package Plant Upgrades - Forcemain Contract
Delaware County Regional Sewer District Package Plant Upgrades - Lower Scioto WRF and Scioto Reserve - Forcemain Contract The Bidder shall furnish all labor, material, equipment necessary to construct approximately 17,240 linear feet of new sanitary force main as shown in the contract documents.
09/27/2023 02:00 PM UTC
Berlin Business Park Pump Station Contract 2-2022 Re-Bid
Delaware County Regional Sewer District Berlin Business Park Pump Station. Construction of a new Sanitary Pump Station, along with associated pump station structure, electrical equipment, upstream wastewater collection system, discharge force main piping, and general site work around the pump station.
11/10/2022 03:00 PM UTC
Berlin Business Park Force Main Contract 3-2022 Re-Bid
Delaware County Regional Sewer District Berlin Business Park Force Main Project. Construction of 12" and 16" Sanitary Force Mains, including some required horizontal directional drilling (HDD).
08/24/2022 02:00 PM UTC
Berlin Business Park Pump Station Contract 2-2022
Delaware County Regional Sewer District Berlin Business Park Pump Station. Construction of a new Sanitary Pump Station, along with associated pump station structure, electrical equipment, upstream wastewater collection system, discharge force main piping, and general site work around the pump station.
06/22/2022 02:00 PM UTC
Berlin Business Park Force Main Contract 3-2022
Delaware County Regional Sewer District Berlin Business Park Force Main Project. Construction of 12" and 16" Sanitary Force Mains, including some required horizontal directional drilling (HDD).
06/22/2022 02:00 PM UTC
Berlin Business Park Force Main Contract 3-2022
Delaware County Regional Sewer District Berlin Business Park Force Main Project. Construction of 12" and 16" Sanitary Force Mains, including some required horizontal directional drilling (HDD).
06/15/2022 02:00 PM UTC
1 - 10 of 18 Solicitations
← Previous 1