General Info

Business Logo

Wolverine Engineers & Surveyors, Inc.

312 North St, Mason, MI 48854-1169
(517) 676-9200


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
18-0120-A - Crystal Lake Shoreline Improvements
​​Township of Crystal - Crystal Lake Shoreline Improvements​​ including approximately 10,400 cyd of earth excavation, 2,500 sft of modular block wall, 9,400 sft concrete sidewalk, 162 feet of safety railing, electrical and lighting system, irrigation, 600 cyd of imported beach sand, site furnishings and cleanup and restoration. Owner anticipates that the Project’s total bid price will be approximately $723,925.00. The Project has an expected duration of 217 days.
11/21/2023 10:00 PM UTC
21-0084
Village of Pinckney - Approximately 0.53 mi of road reconstruction including 1,400 tons HMA, 4,650 ft of concrete curb and gutter, 20,000 sft sidewalk, 23 sta of machine grading, 3,300 ft of 12-30 in storm sewer, 172 ft sanitary sewer, 3,350 ft 8-12 in water main. Owner anticipates that the Project’s total bid price will be approximately $2,300,000. The Project has an expected duration of 240 days.
03/21/2023 03:00 PM UTC
22-0009
Township of Fairhaven, Michigan - Lagoon Outlet Control Structure Replacement: Replacement of existing cast iron sluice gates with new stainless steel sluice gates and appurtenances including all materials, equipment, and labor necessary to complete the project.
05/31/2022 06:00 PM UTC
22-0009
Township of Fairhaven, Michigan - Lagoon Outlet Control Structure Replacement: Replacement of existing cast iron sluice gates with new stainless steel sluice gates and appurtenances including all materials, equipment, and labor necessary to complete the project.
05/31/2022 02:00 PM UTC
20-0076-AB
Village of Pinckney: Contract 1 - N Howell Street Reconstruction, Contract 2 - Cape Seal Various Streets, Contract 3 - 2022 Sidewalk Replacement, Contract 4 - Village Hall Parking Lot Reconstruction Contract 1 includes: Approximately 0.10 miles of road reconstruction including 400 ton HMA roadway, 520 ft concrete curb, 4,150 sft sidewalk, 440 ft sanitary sewer, and 285 ft 12-15 inch storm sewer.​​​​ Contract 2 includes: ​​​​Approximately 16,000 syd micro-surface and single Chip Seal. ​​​​ Contract 3 includes: ​​​​Approximately 3,000 sft of misc sidewalk construction. Contract 4 includes: ​​​​Approximately 1,500 syd of parking lot reconstruction including HMA parking lot, concrete curb, sidewalk, earth excavation, storm sewer, and pavement markings.
04/28/2022 03:00 PM UTC
21-0093
Port Hope, Gore, Rubicon Utilities Authority - Port Hope Water Main Improvements Approximately 1,100 ft of 8 inch water main and associated appurtenances NE of Main St in between Dean St and State St, and in the alley between School St and Portland St.
04/26/2022 03:00 PM UTC
21-0085-AB Republished to Extend Bid Date to March 24, 2022
Village of Pigeon - N Frank Street Reconstruction and Hartley Street Chip Sealing including approximately 0.14 mi of N Frank reconstruction with 472 feet 12-24 inch storm 747 feet 6-8 inch watermain, 600 ton HMA, 1,450 feet conc curb and gutter, 350 sft sidewalk, 125 syd conc driveway, and 0.54 mi Hartley St 1.1 Lnmi overband crack Fill, 12,000 Syd chip seal and pavt marking. Owner anticipates that the Project’s total bid price will be approximately $592,832.50. The Project has an expected duration of 150 days.
03/24/2022 06:00 PM UTC
21-0085-AB
Village of Pigeon - N Frank Street Reconstruction and Hartley Street Chip Sealing including approximately 0.14 mi of N Frank reconstruction with 472 feet 12-24 inch storm 747 feet 6-8 inch watermain, 600 ton HMA, 1,450 feet conc curb and gutter, 350 sft sidewalk, 125 syd conc driveway, and 0.54 mi Hartley St 1.1 Lnmi overband crack Fill, 12,000 Syd chip seal and pavt marking. Owner anticipates that the Project’s total bid price will be approximately $592,832.50. The Project has an expected duration of 150 days.
03/17/2022 03:00 PM UTC
17-0128-A
Village of Fowlerville - N Benjamin St, Devonshire Rd, and Pinewood Dr Infrastructure Improvements ​including approximately 0.364 miles of road reconstruction including 1,250 ton of new HMA pavement, 3,300 feet of concrete curb and gutter, 15,000 sft of concrete sidewalk, 2,035 feet of 12-30 inch storm sewer, 2,122 feet of 10 inch sanitary sewer, 2,112 feet of 12 inch water main, pavement markings, and restoration. The Village of Fowlerville anticipates that the Project’s total bid price will be approximately $2,500,000. The Project has an expected duration of 240 days.
02/24/2022 04:00 PM UTC
170003-A / 17-0040-A
Beal City Gravity Sewer, DPW Building and Pump Station, and Force Main to Mt Pleasant - Contracts 1, 2, and 3
06/09/2020 03:00 PM UTC
11 - 20 of 21 Solicitations
2