General Info

Business Logo

Wolverine Engineers & Surveyors, Inc.

312 North St, Mason, MI 48854-1169
(517) 676-9200


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
23-0047
RE-BID: Village of Fowlerville - Fowlerville Park: Contract 1 - Construction of a new recreation pavilion
05/13/2025 03:00 PM UTC
23-0047
RE-BID: Village of Fowlerville - Fowlerville Park: Contract 2 - Removal and replacement of the existing bituminous parking lot, construction of pickleball courts, sidewalk, curb and gutter, a water service, sanitary pipe, and storm pipe and detention ponds.
05/13/2025 03:00 PM UTC
23-0047
RE-BID Village of Fowlerville - Fowlerville Park: Contract 3 - Installation of Playground Equipment, Site Furnishing, Splash Pad, Workout/Fitness Equipment, and Fitcore Extreme.
05/13/2025 03:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
20-0076-AB
Village of Pinckney: Contract 1 - N Howell Street Reconstruction, Contract 2 - Cape Seal Various Streets, Contract 3 - 2022 Sidewalk Replacement, Contract 4 - Village Hall Parking Lot Reconstruction Contract 1 includes: Approximately 0.10 miles of road reconstruction including 400 ton HMA roadway, 520 ft concrete curb, 4,150 sft sidewalk, 440 ft sanitary sewer, and 285 ft 12-15 inch storm sewer.​​​​ Contract 2 includes: ​​​​Approximately 16,000 syd micro-surface and single Chip Seal. ​​​​ Contract 3 includes: ​​​​Approximately 3,000 sft of misc sidewalk construction. Contract 4 includes: ​​​​Approximately 1,500 syd of parking lot reconstruction including HMA parking lot, concrete curb, sidewalk, earth excavation, storm sewer, and pavement markings.
04/28/2022 03:00 PM UTC
21-0093
Port Hope, Gore, Rubicon Utilities Authority - Port Hope Water Main Improvements Approximately 1,100 ft of 8 inch water main and associated appurtenances NE of Main St in between Dean St and State St, and in the alley between School St and Portland St.
04/26/2022 03:00 PM UTC
21-0085-AB Republished to Extend Bid Date to March 24, 2022
Village of Pigeon - N Frank Street Reconstruction and Hartley Street Chip Sealing including approximately 0.14 mi of N Frank reconstruction with 472 feet 12-24 inch storm 747 feet 6-8 inch watermain, 600 ton HMA, 1,450 feet conc curb and gutter, 350 sft sidewalk, 125 syd conc driveway, and 0.54 mi Hartley St 1.1 Lnmi overband crack Fill, 12,000 Syd chip seal and pavt marking. Owner anticipates that the Project’s total bid price will be approximately $592,832.50. The Project has an expected duration of 150 days.
03/24/2022 06:00 PM UTC
21-0085-AB
Village of Pigeon - N Frank Street Reconstruction and Hartley Street Chip Sealing including approximately 0.14 mi of N Frank reconstruction with 472 feet 12-24 inch storm 747 feet 6-8 inch watermain, 600 ton HMA, 1,450 feet conc curb and gutter, 350 sft sidewalk, 125 syd conc driveway, and 0.54 mi Hartley St 1.1 Lnmi overband crack Fill, 12,000 Syd chip seal and pavt marking. Owner anticipates that the Project’s total bid price will be approximately $592,832.50. The Project has an expected duration of 150 days.
03/17/2022 03:00 PM UTC
17-0128-A
Village of Fowlerville - N Benjamin St, Devonshire Rd, and Pinewood Dr Infrastructure Improvements ​including approximately 0.364 miles of road reconstruction including 1,250 ton of new HMA pavement, 3,300 feet of concrete curb and gutter, 15,000 sft of concrete sidewalk, 2,035 feet of 12-30 inch storm sewer, 2,122 feet of 10 inch sanitary sewer, 2,112 feet of 12 inch water main, pavement markings, and restoration. The Village of Fowlerville anticipates that the Project’s total bid price will be approximately $2,500,000. The Project has an expected duration of 240 days.
02/24/2022 04:00 PM UTC
170003-A / 17-0040-A
Beal City Gravity Sewer, DPW Building and Pump Station, and Force Main to Mt Pleasant - Contracts 1, 2, and 3
06/09/2020 03:00 PM UTC
19-0061
Village of Fowlerville - North Street Reconstruction
05/07/2020 03:00 PM UTC
11 - 17 of 17 Solicitations
2 Next →