General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P26-3643-C2A
Hall Swimming Pool Modernization 4 North Border Road, Stoneham, MA The project consists of all improvements associated with the modernization of the DCR Hall Swimming Pool. The purpose of this work is to replace the existing swimming pool with new improved accessibility, drainage, and piping. The estimated project cost is $ 2.5 million The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
10/30/2025 04:00 PM UTC
P26-3633-C1A
Savoy Mountain State Forest Campground Comfort Station Improvements 313 Central Shaft Road, Florida, MA 01247 This project scope is to replace the existing comfort Station of similar size with a new pre-designed, prefabricated comfort station, including a cast-in-place foundation system. The proposed building should have a sloped roof and have a minimum eight-foot ceiling height and shall be constructed of durable materials, preference is for cast concrete walls with a finish texture(s) compatible with a forest setting. The Contractor shall disconnect the existing comfort station and connect the new comfort station to existing site utilities. The applicable building, plumbing and electrical codes shall apply. The estimated project: $1,000,000 The work is to be accomplished within 240 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Modular Construction/ Prefab and must submit with the bid an update of their respective qualifications. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
11/06/2025 05:00 PM UTC
P24-3553-C5A
Clinton Spray Deck Construction Clinton, Massachusetts The project consists of construction of a new spray deck including site preparation, concrete slab and footings, storage and transportation of materials, new porous access pathways and associated sitework. The estimated project cost is $ $650,000 The work is to be accomplished within 150 calendar days of a notice to proceed. Liquidated damages in the amount of $1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
11/06/2025 05:00 PM UTC
P26-3665-M3A
Servicing Electrical and Electronic Systems The project consists of work including maintenance repair, removal and new installation of electrical and electronic systems at various DCR sport facilities recreational areas, properties and buildings. The estimated project: $2,000,000.00 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in Electrical. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
11/13/2025 05:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
P23-3503-M5A
Improved Surface Trail Repairs – Eastern MA Location: Middlesex, Essex, Suffolk, Norfolk, Bristol, Worcester, Plymouth, Barnstable, and Dukes The project consists of unclassified excavation, pavement reclamation, pavement patching, full depth hot mix asphalt pavement, aggregate pathway installation and patching, selective clearing and/or pruning, gravel trail construction, guard rail installation, installation and maintenance of drainage structures, pavement markings, signs, landscaping, and other work incidental to the rehabilitation of improved surface trails. The estimated project cost is $ 3,400,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in _Highway Construction_ to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/15/2023 05:00 PM UTC
P23-3503-M7A
Improved Surface Trail Repairs – Western MA - Worcester, Hampden, Hampshire, Franklin, and Berkshire. The project consists of unclassified excavation, pavement reclamation, pavement patching, full depth hot mix asphalt pavement, aggregate pathway installation and patching, selective clearing and/or pruning, gravel trail construction, guard rail installation, installation and maintenance of drainage structures, pavement markings, signs, landscaping, and other work incidental to the rehabilitation of improved surface trails. The estimated project cost is $ 2,770,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/15/2023 05:00 PM UTC
P23-3484-C3A
Sullivan Park - Revere Beach Boulevard, Revere, MA Reconstruction of an existing park including removal of existing pavement, fencing, trees, lawn, and topsoil; construction of new concrete and bituminous pavements and pavers; installation of new fitness equipment and poured-in-place rubber safety surfacing, site furnishings, shade shelter, lighting, granite walls, signage piers, and curbing; and installation of an irrigation system, new interactive water feature, and new planting and seeding. Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreation Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/08/2023 05:00 PM UTC
P17-3156-C3A
Sub Bids:Eliot Tower Masonry and Erosion Control 04-0001 Masonry, 05-0001 Misc Metal and Ornamental Iron Stop water infiltration into tower buildings and other stone structures, demolish and salvage stone infill walls at picnic shelter walls, rebuild damaged stone chimney, fireplace lintel & fire box, add cap; install removable metal plate or grate at chimney; replace missing wood door jambs and heads, repoint masonry walls, repair flagstone floor in shelter, install flagstone terrace and repair/adjust stone steps, repair and repoint exterior terraces around tower, make repairs to pavilion roof as needed, provide ADA walkways and ramp access to Picnic Shelter, replace damaged metal railing on tower east side, fabricate and install new railings at four exterior stairs, prevent and repair erosion, planting around immediate area of complex, paving and walkways, site grading, site improvements including adding fill to north wall for code compliance, fabrication/installation of interpretive signs, installation of accessible picnic tables, and fabrication/installation of replica medallions. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of Historic Masonry.
02/01/2023 05:00 PM UTC
P23-3497-M2A
Title: Masonry & Concrete Repairs Counties: Barnstable,Berkshire,Bristol,Essex,Franklin,Hampden,Hampshire,Middlesex, Norfolk, Plymouth, Suffolk, Worcester, Dukes, Nantucket Repairs may include: restoration of masonry walls, reconstruction or stabilization of stone and brick areas, replacement of deteriorated cast in place concrete building components, etc. This is a statewide work order contract for building sites not identified at this time and will include work on historic structures. Work on historic structures shall comply with appropriate state and federal preservation standards. Project Estimated : $ 3,000,000. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Bidders must be certified in both Masonry and Historic Masonry and must submit with the bid an update of their respective qualifications.
01/18/2023 05:00 PM UTC
P10-2636-C3A
Blackstone River Greenway Phase 1 Segment 2 Blackstone, MA This project is a 0.5-mile section from the Canal Street Bridge in Blackstone to Rhode Island. It includes the construction of a trail on top of a single-span and a seven-span viaduct, both of which are historic structures which will be rehabilitated as part of the project. The estimated project cost is $9,500,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY - BIKE PATHS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
11/30/2022 05:00 PM UTC
P23-3516-M1A
Title: Overhead Door Maintenance, Repair and Replacement Location: Counties : Barnstable, Berkshire, Bristol, Essex, Franklin, Hampden, Hampshire, Middlesex, Norfolk, Plymouth, Suffolk, Worcester The project consists of the maintenance, repair, and replacement of all types of overhead doors, metal rollup window coverings and all ancillary components, on an as needed basis. The estimated project: 300,000.00 All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in general building construction with a minimum of five years’ experience in commercial overhead door repair and must submit with the bid an update of their respective qualifications. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
11/02/2022 04:00 PM UTC
P23-3505-M1A
Replacement of Roofs at DCR Facilities – Eastern Massachusetts:Bristol, Barnstable, Middlesex, Essex, Norfolk, Plymouth, Suffolk, Worcester The project consists of: Replacement various roof types in DCR Facilities in Eastern Massachusetts. Roofs may be shingled, slates, membrane or standing seam metal roofs. This is a work order contract for building sites not identified at this time. The estimated project Base Bid cost is $3,500,000. The work is to be accomplished within 910 calendar days of a notice to proceed. Liquidated damages in the amount of $1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express. If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Bidders must be certified in Roofing and must submit with the bid an update of their respective qualifications
10/26/2022 04:00 PM UTC
P23-3505-M2A
Replacement of Roofs at DCR Facilities – Central & Western Massachusetts Berkshire, Franklin, Hampshire, Hamden, Worcester, Middlesex The project consists of: Replacement various roof types in DCR Facilities in Central & Western Massachusetts. Roofs may be shingled, slates, membrane or standing seam metal roofs. This is a work order contract for building sites not identified at this time. The estimated project Base Bid cost is $2,800,000. The work is to be accomplished within 910 calendar days of a notice to proceed. Liquidated damages in the amount of $1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Bidders must be certified in Roofing and must submit with the bid an update of their respective qualifications.
10/26/2022 04:00 PM UTC
P23-3501-C1A
Intersection Improvements VFW Parkway at South Street and Church Street Brookline The project consists of Resurfacing of the roadways and sidewalks, replacing granite curbing, new access ramps with warning pads, new traffic signals to replace existing in-kind featuring posts and mast arms with unpainted galvanized steel finish, new Traffic Signal foundation, cabinet and controller replacing existing in same location. The estimated project cost is $ 1,049,995.00 The work is to be accomplished within 547 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000. per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in ___Highway Construction _ to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
10/26/2022 04:00 PM UTC
151 - 160 of 289 Solicitations
1 2 12 13 14 16 18 19 20 28 29