General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P26-3666-M4A
Arboricultural Services for DCR Parkways, Roadways, and other DCR Managed Properties The project consists of tree care such as pruning, maintenance and removal as needed along DCR properties and parkways as assigned. The estimated project cost is $ 6,500,000 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of 1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Tree Trimming Maintenance & Removal to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
04/23/2026 04:00 PM UTC
P26-3666-C2A
Western MA Mountain Road Culvert Improvements Mount Greylock State Reservation & Pittsfield State Forest Berkshire County This project consists of the replacement of two existing culverts within Mount Greylock State Reservation and two within Pittsfield State Forest (four culvert replacements total) to improve drainage capacity and structural integrity. The upgrades will enhance resilience to increased stormwater flows from future rainfall events, reduce erosion and flooding risks, and alleviate existing safety hazards affecting access to both mountain road systems. The designs for both locations incorporate climate-resilient principles to ensure long-term durability and environmental stability within these critical areas. The estimated project cost is $ 4,700,000.00 The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work is not completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be prequalified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in BRIDGE - CULVERT to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
04/30/2026 04:00 PM UTC
P26-3665-M4A
Traffic Signal Maintenance - Statewide The project consists of providing on-call maintenance, repair, emergency response, modification, and upgrade services for traffic signal and traffic control systems, as directed by the Engineer. Work shall include preventative maintenance, emergency repairs, knockdown restoration, equipment replacement, and system improvements necessary to maintain proper operation. The estimated project cost is $ 2,500,000.00 The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in TRAFFIC SIGNALS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
05/21/2026 04:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
P21-3405-C21A
Sub Bids: Olsen Pool Bathhouse Renovation Hyde Park, MA- Masonry, Painting, Plumbing, and Electrical Sealed Sub-BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM on Wednesday, October 6, 2021 for the following FILED SUB-BIDS, (Masonry, Painting, P lumbing, and Electrical through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. Renovation of existing pool bathhouse including interior work to create relocated ADA compliant men’s and women’s rooms, upgraded building systems, first aid room, staff locker room, family changing rooms, new finishes, and increased storage space. Physical work will be done during the facility fall/winter/spring off-season and be completed for use in summer 2022 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction.
10/06/2021 04:00 PM UTC
P21-3405-C10A
Sub-Bids: Magazine Beach Pool Bathhouse Renovation, Cambridge, MA Masonry, Painting, Plumbing, HVAC and Electrical Renovation of existing pool bathhouse including interior work to create relocated ADA compliant men’s and women’s rooms, upgraded building systems, first aid room, staff locker room, family changing rooms, new finishes and increased storage space. Physical work will be done during the facility fall/winter/spring off-season and be completed for use in summer 2022 The estimated project Base Bid cost is $950,000 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction.
10/06/2021 04:00 PM UTC
P22-3455-C1A
Flowering Pond Dam Rehabilitation Maudslay State Park, Newburyport, Massachusetts The project consists of the rehabilitation of the Flowering Pond Dam. In general. work will consists of demolition of the existing concrete spillway, footbridge and wooden fence, removal of identified trees, excavation for and removal of the existing low-level outlet pipe and associated appurtenant structures (including timber box), removal of timber planking along upstream slope and any accumulated sediment, repair and reconstruction of downstream boulder wall and concrete core/cut-off wall, installation of new headwall, trash rack, low-level outlet pipe and associated appurtenances, construction of new cast-in-place spillway and associated footbridge, installation of new slope protection along the upstream face of the dam, removal of debris downstream of spillway and installation of energy dissipation pad, and restoration of the grassed area and dirt walkway at the top of the dam along with providing new permanent railings and fencing and ADA-compliant benches, and general site restoration post work. The estimated project cost is $ 475,000. Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Dam Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
09/29/2021 04:00 PM UTC
P22-3462-M1A
ARBORICULTURAL AND RELATED SERVICES INCLUDING PARKWAYS, ROADWAYS AND OTHER DCR MANAGED PROPERTIES STATEWIDE The project consists of tree care such as pruning, maintenance and removal as needed along DCR properties and parkways as assigned. The estimated project cost is $ 2,500,000 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
09/22/2021 04:00 PM UTC
P22-3459-C1 (4059-C)
P22-3459-C1 (4059-C) Rebid of P20-3365-C2A Regatta Point- Waterfront Rehabilitation The project consists of but not limited to rehabilitation to the existing timber Eastern and Southern Piers, installation of a new sheet pile bulkhead and demolition of an existing concrete retaining wall, installation of a new access platform, installation of new access ramps. The estimated project cost is $ 870,456 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in the MARINE CONSTRUCTION category to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
09/08/2021 04:00 PM UTC
P21-3409-C4A
Watertown Riverfront Park Charles River Road Phase 2,Charles River Road, Charles River Reservation, Watertown, MA The project consists of parkland renovation including riverbank restoration, earthwork, planting, utility and drainage improvements, granite installation, parkway narrowing through granite curb relocation, paving (bituminous concrete, Portland cement concrete, concrete unit, granite, crushed stone aggregate, and flexible porous paving), and parkland furnishings. The estimated project cost is $ 1,300,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
07/28/2021 04:00 PM UTC
P20-3352-C3A
RE BID:General: Shawme-Crowell Comfort Station Renovation GENERAL BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM on Wednesday, July 28, 2021 will be received through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home The project consists of renovation of five park campground comfort stations including plumbing, roofing, doors and accessibility improvements. Physical work will be structured to be done in two phases over the facility fall/winter/spring off seasons. Phase 1 will consist of 2 buildings and is scheduled to start in Sept. 2021 and Phase 2 will consist of 3 buildings and is scheduled to start in Sept. 2022. The estimated project Base Bid cost is $1,500,000 All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAM) for the work they are bidding on and must submit with the bid an update of their respective qualifications.
07/28/2021 04:00 PM UTC
P20-3352-C3A
RE BID: Sub-Bids :Shawme-Crowell Comfort Station Renovation Sub-BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM on Wednesday, July 14, 2021 for the following FILED SUB-BIDS, Plumbing, Electrical, HVAC, Painting, Roofing & Flashing, Waterproofing, Damp proofing & Caulking will be received through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home The project consists of renovation of five park campground comfort stations including plumbing, roofing, doors and accessibility improvements. Physical work will be structured to be done in two phases over the facility fall/winter/spring off seasons. Phase 1 will consist of 2 buildings and is scheduled to start in Sept. 2021 and Phase 2 will consist of 3 buildings and is scheduled to start in Sept. 2022 All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAM) for the work they are bidding on and must submit with the bid an update of their respective qualifications.
07/14/2021 04:00 PM UTC
P21-3411-C02 (4049C)
Moody Street Pier Removal Project-Waltham, MA The project consists of removing the existing Moody Street Pier including, but not limited to, all labor and materials associated with timber pier demolition, installation of pedestrian railings and minor bulkhead concrete repairs, along with floating debris control, site preparation, and staging and access. Bidders must be pre-qualified by the Massachusetts Department of Transportation (MassDOT) Highway Division in _MARINE CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The estimated project cost is $ 175,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
06/09/2021 03:00 PM UTC
P21 3419 C1A
General Bid: Accessible Improvements-Abe Bashara Boathouse, Lawrence Massachusetts The project consists of Installation of a platform lift to provide accessible access to second floor. Demo of existing stair lift. New construction includes raised floor, drywall construction, new doors and frames, electrical lighting, and power installation of a platform lift. The estimated project Base Bid cost is $ 220,000.00 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAM) for General Construction and must submit with the bid an update of their respective qualifications. CONTRACTS FOR BUILDING PROJECTS ESTIMATED TO COST OVER $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. C. 149
06/09/2021 03:00 PM UTC
241 - 250 of 313 Solicitations
1 2 21 22 23 25 27 28 29 30 31 32