General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P26-3643-C2A
Hall Swimming Pool Modernization 4 North Border Road, Stoneham, MA The project consists of all improvements associated with the modernization of the DCR Hall Swimming Pool. The purpose of this work is to replace the existing swimming pool with new improved accessibility, drainage, and piping. The estimated project cost is $ 2.5 million The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
10/30/2025 04:00 PM UTC
P26-3633-C1A
Savoy Mountain State Forest Campground Comfort Station Improvements 313 Central Shaft Road, Florida, MA 01247 This project scope is to replace the existing comfort Station of similar size with a new pre-designed, prefabricated comfort station, including a cast-in-place foundation system. The proposed building should have a sloped roof and have a minimum eight-foot ceiling height and shall be constructed of durable materials, preference is for cast concrete walls with a finish texture(s) compatible with a forest setting. The Contractor shall disconnect the existing comfort station and connect the new comfort station to existing site utilities. The applicable building, plumbing and electrical codes shall apply. The estimated project: $1,000,000 The work is to be accomplished within 240 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Modular Construction/ Prefab and must submit with the bid an update of their respective qualifications. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
11/06/2025 05:00 PM UTC
P24-3553-C5A
Clinton Spray Deck Construction Clinton, Massachusetts The project consists of construction of a new spray deck including site preparation, concrete slab and footings, storage and transportation of materials, new porous access pathways and associated sitework. The estimated project cost is $ $650,000 The work is to be accomplished within 150 calendar days of a notice to proceed. Liquidated damages in the amount of $1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
11/06/2025 05:00 PM UTC
P26-3665-M3A
Servicing Electrical and Electronic Systems The project consists of work including maintenance repair, removal and new installation of electrical and electronic systems at various DCR sport facilities recreational areas, properties and buildings. The estimated project: $2,000,000.00 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in Electrical. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
11/13/2025 05:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
P20-3340-C1A
Maudsley Garden Wall – Phase 1 Maudslay State Park, Newburyport, MA The project consists of the reconstruction of the lower middle wall at the Italian and Rose Gardens, landscaping work and installation of a new irrigation system The estimated project cost is $210,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
03/10/2021 04:00 PM UTC
P21-3407-C3A
Bajko Rink Parking Lot Improvements Hyde Park, MA Work consists of demolition of existing pavement and entrance road, new paved parking lot and entrance road, new parking lot spacing, safety and traffic flow striping through the entire parking lot site, new drainage system with all water being re-infiltrated underneath the parking area, new ADA sidewalks to connect the rink building, tot lot, spray deck and pool areas, replacement of a section of main sewer line from the rink, new entrance ramps to the pool bathhouse, and new gates and guardrails. The estimated project cost is $1,600,000 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
03/10/2021 04:00 PM UTC
P17-3160-C1A
SUB-BIDS:Blue Hill Observatory, Structure & Envelope Repairs Masonry, Miscellaneous Metal and Ornamental Iron,Roofing and Flashing, Lath and Plaster, Painting, Mechanical, Electrical Selective demolition, concrete repair & replacement, masonry repairs & repointing, steel handrails and guard rails, window and door replacement & restoration, flat roof replacement, copper flashing and coping, interior gypsum partitions and ceilings, plaster repairs, interior & exterior painting, waterproofing and coatings, flooring, electrical, plumbing, mechanical, asbestos abatement & encapsulation, specialty weather instrumentation work and tower climbing, and site improvements for ADA access to a National Historic Landmark structure located at the top of Great Blue Hill.
02/24/2021 04:00 PM UTC
P16-3084-C2A
Halibut Point Landscape Improvements Halibut Point State Park, Gott Ave, Rockport, MA Landscape improvements including parking area paving, drainage, and landscape; driveway, sidewalks, and paths; monumental wall and signage; and planting of trees, shrubs, groundcovers, and native meadow The estimated project cost is $2,100,00.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/17/2021 04:00 PM UTC
P21-3421-C1A
Hopkinton Reservoir Dam Maintenance Project-Ashland, Massachusetts The project consists of maintenance to Hopkinton Reservoir Dam, including: 1) Repointing and slush grouting of spillway channel, 2) removing vegetation from the training walls and groin areas, 3) Replacement of spillway bridge and provision of ADA compliant access from the left abutment parking area, 4) Supplementing and chinking existing rip rap on the upstream slope, abutments and end of spillway outlet channel, 5) Proper abandonment of accessible portions of the non-functional right-side mid-level outlet works by cleaning and filling with cementitious grout, and 6) Other Work as shown on the Drawings and included in the Specifications. The estimated project cost is $ 750,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/10/2021 04:00 PM UTC
P20-3352-C3A
GENERAL: Shawme Crowell Comfort Stations Renovations, Shawme Crowell State Forest, Sandwich, MA The project consists of: The renovation of five total comfort stations - four comfort station buildings (base bid) and one comfort station building (Alternate #1). The estimated project Base Bid cost is $1,200,000 CONTRACTS FOR BUILDING PROJECTS ESTIMATED TO COST OVER $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. C. 149
02/03/2021 04:00 PM UTC
P21-3419-C2A
Flooring Maintenance Installations at DCR Facilities -Statewide Installation of various types of Flooring at DCR Facilities Statewide. Flooring types include epoxy flooring and wall coatings, ceramic tile, VCT Tile and rubber matting. This is a work order contract for building sites not identified at this time. Project Estimate: $ 850,000.00
02/03/2021 04:00 PM UTC
P19-3328-C1A
Cochituate State Park Boat Ramp and Observation Pier Improvements 43 Commonwealth Road, Natick, MA 01760 The project consists of furnishing all necessary labor, materials, equipment, and services for the construction of a new steel and wood observation deck, reconstruction of a 4 bay concrete boat ramp, new ADA compliant lift and dock, site accessibility improvements, pathways, parking lot improvements and resurfacing at Lake Cochituate State Park. The estimated project cost is $ 1,600,000 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/27/2021 04:00 PM UTC
P21-3428-C3A
Improvement to Pope John Paul II Park Playground Dorchester, MA The project consists of the removal of pavements, play structure posts and foundations, play surfacing, fence post foundations and concrete edge, trees and miscellaneous site elements and the installation of new fencing, play surfacing, pavements, benches, bike racks, boulders, trees and seeding. Contractor will coordinate the provision and installation of play structures by others with the play structure installer and DCR. The estimated project cost is $300,000 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/27/2021 04:00 PM UTC
P20-3352-C3A
Sub-Bids: Shawme Crowell Comfort Stations Renovations Shawme Crowell State Forest, Sandwich, MA: FILED SUB- BIDS(6) Plumbing:Electrical: Painting:HVAC:Roofing & Flashing:Waterproofing, Damp proofing & Caulking The renovation of five total comfort stations - four comfort station buildings (base bid) and one comfort station building (Alternate #1).
01/20/2021 04:00 PM UTC
251 - 260 of 289 Solicitations
1 2 21 22 23 24 26 28 29