General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P26-3643-C2A
Hall Swimming Pool Modernization 4 North Border Road, Stoneham, MA The project consists of all improvements associated with the modernization of the DCR Hall Swimming Pool. The purpose of this work is to replace the existing swimming pool with new improved accessibility, drainage, and piping. The estimated project cost is $ 2.5 million The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
10/30/2025 04:00 PM UTC
P26-3633-C1A
Savoy Mountain State Forest Campground Comfort Station Improvements 313 Central Shaft Road, Florida, MA 01247 This project scope is to replace the existing comfort Station of similar size with a new pre-designed, prefabricated comfort station, including a cast-in-place foundation system. The proposed building should have a sloped roof and have a minimum eight-foot ceiling height and shall be constructed of durable materials, preference is for cast concrete walls with a finish texture(s) compatible with a forest setting. The Contractor shall disconnect the existing comfort station and connect the new comfort station to existing site utilities. The applicable building, plumbing and electrical codes shall apply. The estimated project: $1,000,000 The work is to be accomplished within 240 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Modular Construction/ Prefab and must submit with the bid an update of their respective qualifications. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
11/06/2025 05:00 PM UTC
P24-3553-C5A
Clinton Spray Deck Construction Clinton, Massachusetts The project consists of construction of a new spray deck including site preparation, concrete slab and footings, storage and transportation of materials, new porous access pathways and associated sitework. The estimated project cost is $ $650,000 The work is to be accomplished within 150 calendar days of a notice to proceed. Liquidated damages in the amount of $1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
11/06/2025 05:00 PM UTC
P26-3665-M3A
Servicing Electrical and Electronic Systems The project consists of work including maintenance repair, removal and new installation of electrical and electronic systems at various DCR sport facilities recreational areas, properties and buildings. The estimated project: $2,000,000.00 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in Electrical. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
11/13/2025 05:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
P20-3354-C4A
Carpentry at DCR Facilities - Eastern Massachusetts Essex ,Middlesex ,Suffolk ,Norfolk Worcester,Plymouth ,Bristol ,Barnstable The estimated project cost is $ 1,300,000
11/25/2020 04:00 PM UTC
P20-3341-M01 Catch Basin & Drainage Infrastructure Cleaning and CCTV Inspection
Catch Basin & Drainage Infrastructure Cleaning and CCTV Inspection Statewide The project consists of cleaning and/or investigation of DCR drainage infrastructure. Typically, work shall include, during regular and emergency response times, the cleaning of catch basin and manhole structures with a vacuum truck, high pressure water jetting of drainage lines, and CCTV investigation. This project shall also include the removal and disposal of all sediments in compliance with the regulations of the Department of Environmental Protection in effect at the time of disposal. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
10/28/2020 03:00 PM UTC
P20-3351-C3A Fire Alarm System at John Augustus Hall
Installation of a new fire alarm system including; all labor, electrical work, necessary equipment and materials. Demolition of existing non-functioning system, and testing of new system. The estimated project cost is $315,000 CONTRACTS FOR BUILDING PROJECTS ESTIMATED TO COST OVER $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. C. 149
10/22/2020 03:00 PM UTC
P20-3361-C5A: Painting and Minor Repairs to the Arthur Fiedler Footbridge over Storrow Drive
The project consists of concrete repairs to the bridge spans, approach ramps/abutments, installation of new expansion joints, application of concrete coating (including surface preparation and crack/joint treatments), and steel painting of columns (including surface preparation). Alternate 1 includes preparation and installation of anti-skid waterproofing on the bridge deck and approach ramp surfaces The estimated project cost is $ 890,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
09/28/2020 03:00 PM UTC
P21-3418-M1A
Contract No. P21-3418-M1A Overhead Door Maintenance Services Statewide The project consists of maintenance, repair, and replacement of existing overhead doors at various DCR statewide facilities The estimated project Base Bid cost is $ $200,000
09/16/2020 03:00 PM UTC
P20-3333-M4A Maintenance of Street Lighting Systems on DCR Parkways, Roadways and Properties
The project consists of performing preventative maintenance, repair, upgrading, and replacement of defective lighting systems on DCR parkways, roadways, and properties. The estimated project cost is $ 3,500,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
07/29/2020 03:00 PM UTC
P20-3351-M1A - Plumbing Maintenance & Repairs in DCR Facilities - Eastern & Central Ma (General Bid)
Contract No.:P20-3351-M1A: Plumbing Maintenance & Repairs in DCR Facilities: Eastern & Central The estimated project cost is $ 1,800,000
07/01/2020 03:00 PM UTC
P20-3351-M3A Western MA Mechanical Services
The estimated project Base Bid cost is $ 700,000.00 Annual maintenance and repair services of plumbing, heating, ventilation and air conditioning (HVAC) systems, and sewer repairs at various DCR facilities in counties of Berkshire, Hampden, Hampshire, Franklin, and Worcester. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAM) for the work (both Plumbing and HVAC/Heating) they are bidding on and must submit with the bid an update of their respective qualifications.
07/01/2020 03:00 PM UTC
P20-3354-M4A - Roof Replacements in DCR Facilities - Eastern & Central Ma (General Bid)
ESTIMATED TO COST OVER $3,200,000 The project consists of: Repair & Replacement of various roof types in DCR Facilities in Eastern & Central Massachusetts. Roofs may be shingled, slates, membrane or standing seam metal roofs. This is a work order contract for building sites not identified at this time. In addition, two rink roofs: Devine Rink, Dorchester and Connell Rink, Weymouth.
07/01/2020 03:00 PM UTC
P20-3354-M5A - Roof Replacement at DCR Facilities in Central and Western Ma (General Bid))
Roof Replacements in DCR Facilities – Central & Western Ma The estimated project Base Bid cost is $ 750,000
07/01/2020 03:00 PM UTC
271 - 280 of 289 Solicitations
1 2 21 22 23 24 25 26 28